Eni and Khazna AI data center campus, Ferrera Erbognone

Announced

Italy · 1 project · Last reported

Summary

Planned AI data center campus of 500 MW of IT capacity at Ferrera Erbognone in the province of Pavia, Lombardy, near Milan. Eni and the UAE operator Khazna Data Centers signed heads of terms in July 2025 for a joint venture in which Khazna designs and develops a phased master plan and Eni supplies low-carbon power from a new gas-fired plant designed to capture its CO2 for storage at Ravenna. It is the first project in an Italy-UAE programme for up to 1 GW of IT capacity. The European Commission cleared the joint venture in August 2026, when the campus was described as still in design.

Source record as of 2026-08-10 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 45.11700, 8.86700 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Eni and Khazna AI data center campus, Ferrera Erbognone

Announced last observed as of · Reported status

Location: Ferrera Erbognone, Province of Pavia, Lombardy, IT. Municipality centroid from the Ferrera Erbognone Wikipedia article. Sources name the municipality only. Eni; G42; Wikipedia

Use: Ai unspecified, Hpc

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity500 MWPlanned · Campus · It load2026-08-10Total IT capacity, to be reached in phases on a modular design.Eni; G42; Il Sole 24 Ore

Companies and organizations

NameRoleNotesSources
EniDeveloperJoint venture partner.Eni; Il Sole 24 Ore
EniPower supplierTo supply power from a new high-efficiency gas plant with carbon capture.Eni; G42; Il Sole 24 Ore
Khazna Data CentersDeveloperJoint venture partner appointed to design and develop the phased master plan, bringing data center design and operations expertise.Eni; G42; Il Sole 24 Ore
European CommissionGovernmentCleared the joint venture under the simplified merger procedure in August 2026.Il Sole 24 Ore; Eunews

Timeline

DateEventActual or plannedNotesSources
2025-02OtherActualItaly-UAE strategic partnership launched, targeting up to 1 GW of IT capacity in Italy.Eni; G42
2025-07-11AnnouncedActualHeads of terms for the joint venture signed in Rome.Eni; G42
2026-08OtherActualEuropean Commission merger clearance of the Eni-Khazna joint venture, finding no competition concerns.Il Sole 24 Ore; Eunews

Power supply

TypeDescriptionSources
OtherEni is to supply what it calls blue power from a new high-efficiency gas-fired plant designed to capture its CO2, which would be sent to a storage site in Ravenna. The plant's location relative to the campus is not stated.Eni; G42; Il Sole 24 Ore

No investment figure, phase schedule or operating date has been disclosed. Eni said development activities were under way when the heads of terms were signed, but in August 2026 Il Sole 24 Ore described the campus as still being designed; no construction start was found.

Sources for these details
Companies
  • Developer: Eni (unknown scope) evidence
  • Developer: Eni (unknown scope) evidence
  • Power Supplier: Eni (unknown scope) evidence
  • Power Supplier: Eni (unknown scope) evidence
  • Power Supplier: Eni (unknown scope) evidence
  • Developer: Khazna Data Centers (unknown scope) evidence
  • Developer: Khazna Data Centers (unknown scope) evidence
  • Developer: Khazna Data Centers (unknown scope) evidence
  • Government: European Commission (unknown scope) evidence
  • Government: European Commission (unknown scope) evidence
Source and location review
Status source
Data centres: EU gives the green light to the Eni-Khazna joint venture. Lombardy hub set to accelerate evidence row
Il Sole 24 Ore · published 2026-08-10 · News
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 78 days before the data update on 2026-10-27

Location details
Coordinates
45.11700, 8.86700
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Municipality centroid from the Ferrera Erbognone Wikipedia article. Sources name the municipality only.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
a7222596

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Eni and Khazna AI data center campus, Ferrera Erbognone
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Data centres: EU gives the green light to the Eni-Khazna joint venture. Lombardy hub set to accelerate
Archived copy
Il Sole 24 Ore
News
Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Other, Power Source: Other, Role: Developer, Role: Government, Role: Power Suppliersource-terms-not-recordedIl Sole 24 Ore3db0d30135348bfcf27a9600a0a72a6d7e2c52e0df680e3fe8a6e537d4c4c7af
Factual source record; not the publisher page
EU Commission approves Khazna–ENI joint venture, says it does “not raise competition concerns”
Archived copy
Eunews
News
Imported: Record, Imported: Status, Milestone: Other, Role: Governmentsource-terms-not-recordedEunewsbff1f288e495deeb21f303e2c0108348c73de88ce7c2469bf694bc27f131603e
Factual source record; not the publisher page
Ferrera Erbognone
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipediae5a849f2588e2102d710475bd1ed3018b8df2fe25e15da7f0688a4d34ed2c8e7
Factual source record; not the publisher page
Khazna Data Centers and Eni Partner to Develop 500 MW AI Data Center Campus Near Milan
Archived copy
G42
Company disclosure
Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Announced, Milestone: Other, Power Source: Other, Role: Developer, Role: Power Suppliersource-terms-not-recordedG42b7d1a4e9befda030009d264449a46def210fda0757e151e5a6721400441fe14f
Factual source record; not the publisher page
Khazna Data Centers and Eni partner to develop 500 MW AI Data Center Campus near Milan
Archived copy
Eni
Company disclosure
Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Announced, Milestone: Other, Power Source: Other, Role: Developer, Role: Power Suppliersource-terms-not-recordedEnif47b66b73f4cc8a813fddd4943ff4813daffcc189c375cba652037461ed59f9b
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Eni and Khazna AI data center campus, Ferrera Erbognone [site vcc-site-47f902912a847a235f3d]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-47f902912a847a235f3d/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction