Paratera Inner Mongolia New Computing Base (Horinger)

Operational

China · 1 project · Last reported

Summary

On 10 August 2026 the Horinger New Area Party-Mass Service Center reported, in the present tense, that the Paratera (并行科技) Inner Mongolia compute base is equipped with a 60,000 P heterogeneous-compute 10,000-card cluster, allocates heterogeneous compute on demand through its own scheduling system, benefits from half a year of natural cooling for the cluster, and is exploring offering idle compute to overseas customers. Read as a government statement that the base operates as of publication. No phase, building, opening date or measured load is stated; the 60,000 P is a stated compute capacity, not IT power. The base's Phase 4 project (second-stage works granted a planning permit, reported 20 August 2026) and any other later phase whose location is not established are not included. evidence

Inner Mongolia Horinger New Area Party-Mass Service Center (内蒙古和林格尔新区党群服务中心) · published 2026-08-10

Location

The interactive map needs JavaScript. Display anchor: 40.54179, 111.84197 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

Paratera Inner Mongolia New Computing Base — existing compute-base operations

Operational last observed as of · Authoritative status update

Approval-result publicity page (发布时间 2024-07-14 14:34) titled as the approval result of the radiation-category EIA for the Paratera Inner Mongolia New Computing Base Phase 2 project 110 kV substation, with the report form as its attachment. It approves ancillary grid works and is not consent for the data-centre buildings. evidence

Inner Mongolia Autonomous Region Department of Ecology and Environment · published 2024-07-14

Revised report form for the same Phase 2 substation after a design change from 2 x 63 MVA to 4 x 63 MVA (grid-access review of 17 July 2024). It repeats the station-site centre coordinate (111°50′31.077″, 40°32′30.457″), the location inside the Phase 2 land on the east side of the compute base, the neighbours (Paratera Phase 1 west, Bank of Communications data centre north, Yungu Zong 52 Road east, airport expressway south) and that the base's Phase 1 is staffed. It confirms the coordinate independently of the 2024 version. evidence

Inner Mongolia Autonomous Region Department of Ecology and Environment · published 2025-01-20

Companies
  • Operator: Paratera (并行科技) (current) evidence
Source and location review
Status source
Horinger New Area news item: 'From WAIC to Inner Mongolia Horinger New Area: three looks at the compute acceleration in the free trade zone' (从WAIC到内蒙古和林格尔新区:“三看”自贸试验区里的算力“加速度”), 10 August 2026 evidence row
Inner Mongolia Horinger New Area Party-Mass Service Center (内蒙古和林格尔新区党群服务中心) · published 2026-08-10 · Government record
Locator
Campus locator · Official source · official_eia_on_campus_substation_locator evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 78 days before the data update on 2026-10-27

Location details
Coordinates
40.54179, 111.84197
Geometry licence
all-rights-reserved
Use scope
Campus locator
Scope class
official_eia_on_campus_substation_locator
Authority
Official source
Source entity
Campus
Method
official_eia_geographic_dms_point_transcription
Derivation
direct_geometry
Precision scope
EIA station-site centre of the compute base's Phase 2 110 kV substation, which the report places inside the Phase 2 land on the east side of the base, adjoining the Phase 1 works to the west. Locates the Phase 1-2 campus of the Paratera Inner Mongolia New Computing Base through on-campus power infrastructure at its east end; not a data-hall footprint, parcel centroid or entrance. The base's main data-centre buildings lie about 200-300 m west-south-west of the point; later phases located elsewhere, if any, are not covered.
Horizontal uncertainty
Not reported

No datum or positional accuracy is stated. The WGS84/CGCS2000 reading rests on the report's neighbour description, its figures and agreement with independent Esri imagery of unstated accuracy and date (manual visual comparison, about 10-20 m between the point and the visible east-end building). The point marks the base's Phase 2 substation area at its east end, up to a few hundred metres from the data halls. Decimal places are transcription precision, not accuracy.

Geometry evidence
b62436b3

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Paratera Inner Mongolia New Computing Base (Horinger)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Environmental impact report form (revised, supplementing the original approval): Paratera Inner Mongolia New Computing Base 110 kV substation (并行科技内蒙古新型算力基地110kV变电站工程(报批-补充原环评批复)), Inner Mongolia Department of Ecology and Environment approval-result publicity of 20 January 2025
Archived copy
Inner Mongolia Autonomous Region Department of Ecology and Environment
Environmental assessment document
Site and project identityall-rights-reservedInner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 内蒙古新东吉泰科技有限责任公司14c9ab49307f23f651a83c63e064a3ef680f0fafb6a51714c169f894cf0a0d91
Retained source material; see source provenance
Environmental impact report form: Paratera Inner Mongolia New Computing Base Phase 2 project 110 kV substation (并行科技算力基地二期110kV变电站(报批)), Inner Mongolia Department of Ecology and Environment radiation-EIA approval-result publicity of 14 July 2024
Archived copy
Inner Mongolia Autonomous Region Department of Ecology and Environment
Environmental assessment document
Geometryall-rights-reservedInner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 内蒙古新东吉泰科技有限公司c02eeacfb8edff608c6862ab82fa88c55cdfec2f225256f8a30320adf9c08e39
Retained source material; see source provenance
Esri World Imagery EPSG:4326 export around the Paratera Inner Mongolia New Computing Base, Horinger (request bbox 111.8340-111.8480E, 40.5375-40.5455N)
Archived copy
Esri
Map feature
Site and project identitynot statedall-rights-reservedEsri, Maxar, Earthstar Geographics and the GIS user community (World Imagery)e04cf114d99af5a5ebefb4c627f253f4424a0b3ec2611a2cc41dc2fd65eafed0
Retained source material; see source provenance
Horinger New Area news item: 'From WAIC to Inner Mongolia Horinger New Area: three looks at the compute acceleration in the free trade zone' (从WAIC到内蒙古和林格尔新区:“三看”自贸试验区里的算力“加速度”), 10 August 2026
Archived copy
Inner Mongolia Horinger New Area Party-Mass Service Center (内蒙古和林格尔新区党群服务中心)
Government record
Site and project identity, Physical status, Operator claimall-rights-reserved内蒙古和林格尔新区党群服务中心, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)6cccbcc8c8de9c82f37e7af13ba3a6ae74ba5c35b18905bc478a8d386d81ff15
Retained source material; see source provenance
Inner Mongolia Department of Ecology and Environment approval-result publicity for the radiation-category EIA of the Paratera Inner Mongolia New Computing Base Phase 2 project 110 kV substation, 14 July 2024
Archived copy
Inner Mongolia Autonomous Region Department of Ecology and Environment
Government record
Site and project identityall-rights-reservedInner Mongolia Autonomous Region Department of Ecology and Environmentf0c24e1bcdd13ea9508c0b61f10f937efc7d024896355ff37fd3c5b6c7d540c6
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). Paratera Inner Mongolia New Computing Base (Horinger) [site vcc-site-c1888e4188c5e991f794]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c1888e4188c5e991f794/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction