Paratera Inner Mongolia New Computing Base (Horinger)
Operational
China · 1 project · Last reported
Summary
On 10 August 2026 the Horinger New Area Party-Mass Service Center reported, in the present tense, that the Paratera (并行科技) Inner Mongolia compute base is equipped with a 60,000 P heterogeneous-compute 10,000-card cluster, allocates heterogeneous compute on demand through its own scheduling system, benefits from half a year of natural cooling for the cluster, and is exploring offering idle compute to overseas customers. Read as a government statement that the base operates as of publication. No phase, building, opening date or measured load is stated; the 60,000 P is a stated compute capacity, not IT power. The base's Phase 4 project (second-stage works granted a planning permit, reported 20 August 2026) and any other later phase whose location is not established are not included. evidence
Inner Mongolia Horinger New Area Party-Mass Service Center (内蒙古和林格尔新区党群服务中心) · published 2026-08-10
Location
The interactive map needs JavaScript. Display anchor: 40.54179, 111.84197 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (1)
Paratera Inner Mongolia New Computing Base — existing compute-base operations
Operational last observed as of · Authoritative status update
Approval-result publicity page (发布时间 2024-07-14 14:34) titled as the approval result of the radiation-category EIA for the Paratera Inner Mongolia New Computing Base Phase 2 project 110 kV substation, with the report form as its attachment. It approves ancillary grid works and is not consent for the data-centre buildings. evidence
Inner Mongolia Autonomous Region Department of Ecology and Environment · published 2024-07-14
Revised report form for the same Phase 2 substation after a design change from 2 x 63 MVA to 4 x 63 MVA (grid-access review of 17 July 2024). It repeats the station-site centre coordinate (111°50′31.077″, 40°32′30.457″), the location inside the Phase 2 land on the east side of the compute base, the neighbours (Paratera Phase 1 west, Bank of Communications data centre north, Yungu Zong 52 Road east, airport expressway south) and that the base's Phase 1 is staffed. It confirms the coordinate independently of the 2024 version. evidence
Inner Mongolia Autonomous Region Department of Ecology and Environment · published 2025-01-20
- Companies
- Operator: Paratera (并行科技) (current) evidence
Source and location review
- Status source
- Horinger New Area news item: 'From WAIC to Inner Mongolia Horinger New Area: three looks at the compute acceleration in the free trade zone' (从WAIC到内蒙古和林格尔新区:“三看”自贸试验区里的算力“加速度”), 10 August 2026 evidence row
Inner Mongolia Horinger New Area Party-Mass Service Center (内蒙古和林格尔新区党群服务中心) · published 2026-08-10 · Government record - Locator
- Campus locator · Official source · official_eia_on_campus_substation_locator evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 78 days before the data update on 2026-10-27
Location details
- Coordinates
- 40.54179, 111.84197
- Geometry licence
- all-rights-reserved
- Use scope
- Campus locator
- Scope class
- official_eia_on_campus_substation_locator
- Authority
- Official source
- Source entity
- Campus
- Method
- official_eia_geographic_dms_point_transcription
- Derivation
- direct_geometry
- Precision scope
- EIA station-site centre of the compute base's Phase 2 110 kV substation, which the report places inside the Phase 2 land on the east side of the base, adjoining the Phase 1 works to the west. Locates the Phase 1-2 campus of the Paratera Inner Mongolia New Computing Base through on-campus power infrastructure at its east end; not a data-hall footprint, parcel centroid or entrance. The base's main data-centre buildings lie about 200-300 m west-south-west of the point; later phases located elsewhere, if any, are not covered.
- Horizontal uncertainty
Not reported
No datum or positional accuracy is stated. The WGS84/CGCS2000 reading rests on the report's neighbour description, its figures and agreement with independent Esri imagery of unstated accuracy and date (manual visual comparison, about 10-20 m between the point and the visible east-end building). The point marks the base's Phase 2 substation area at its east end, up to a few hundred metres from the data halls. Decimal places are transcription precision, not accuracy.
- Geometry evidence
- b62436b3
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Environmental impact report form (revised, supplementing the original approval): Paratera Inner Mongolia New Computing Base 110 kV substation (并行科技内蒙古新型算力基地110kV变电站工程(报批-补充原环评批复)), Inner Mongolia Department of Ecology and Environment approval-result publicity of 20 January 2025 Archived copy | Inner Mongolia Autonomous Region Department of Ecology and Environment Environmental assessment document | Site and project identity | all-rights-reserved | Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 内蒙古新东吉泰科技有限责任公司 | 14c9ab49307f23f651a83c63e064a3ef680f0fafb6a51714c169f894cf0a0d91Retained source material; see source provenance | ||
| Environmental impact report form: Paratera Inner Mongolia New Computing Base Phase 2 project 110 kV substation (并行科技算力基地二期110kV变电站(报批)), Inner Mongolia Department of Ecology and Environment radiation-EIA approval-result publicity of 14 July 2024 Archived copy | Inner Mongolia Autonomous Region Department of Ecology and Environment Environmental assessment document | Geometry | all-rights-reserved | Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 内蒙古新东吉泰科技有限公司 | c02eeacfb8edff608c6862ab82fa88c55cdfec2f225256f8a30320adf9c08e39Retained source material; see source provenance | ||
| Esri World Imagery EPSG:4326 export around the Paratera Inner Mongolia New Computing Base, Horinger (request bbox 111.8340-111.8480E, 40.5375-40.5455N) Archived copy | Esri Map feature | Site and project identity | not stated | all-rights-reserved | Esri, Maxar, Earthstar Geographics and the GIS user community (World Imagery) | e04cf114d99af5a5ebefb4c627f253f4424a0b3ec2611a2cc41dc2fd65eafed0Retained source material; see source provenance | |
| Horinger New Area news item: 'From WAIC to Inner Mongolia Horinger New Area: three looks at the compute acceleration in the free trade zone' (从WAIC到内蒙古和林格尔新区:“三看”自贸试验区里的算力“加速度”), 10 August 2026 Archived copy | Inner Mongolia Horinger New Area Party-Mass Service Center (内蒙古和林格尔新区党群服务中心) Government record | Site and project identity, Physical status, Operator claim | all-rights-reserved | 内蒙古和林格尔新区党群服务中心, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn) | 6cccbcc8c8de9c82f37e7af13ba3a6ae74ba5c35b18905bc478a8d386d81ff15Retained source material; see source provenance | ||
| Inner Mongolia Department of Ecology and Environment approval-result publicity for the radiation-category EIA of the Paratera Inner Mongolia New Computing Base Phase 2 project 110 kV substation, 14 July 2024 Archived copy | Inner Mongolia Autonomous Region Department of Ecology and Environment Government record | Site and project identity | all-rights-reserved | Inner Mongolia Autonomous Region Department of Ecology and Environment | f0c24e1bcdd13ea9508c0b61f10f937efc7d024896355ff37fd3c5b6c7d540c6Retained source material; see source provenance |
Cite this site
Kyars, K. (2026). Paratera Inner Mongolia New Computing Base (Horinger) [site vcc-site-c1888e4188c5e991f794]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c1888e4188c5e991f794/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction