Huawei Cloud Horinger Data Center — Yungu West Zone

Completed

China · 1 project · Last reported

Summary

On 23 September 2026 the Horinger New Area planning and construction bureau reported that the second-batch construction works of the Huawei Cloud Horinger Data Center project - Yungu West Zone (Phase 1) had completed their construction completion-acceptance filing (竣工验收备案). The second batch comprises the 2# data-centre machine-room building and the 2# generator platform, about 45,717.7 m2 of floor area. The record covers construction completion of that second-batch scope only: operation is described as a next step and is not asserted, the planned cabinet and server numbers are not treated as installed capacity, and the other West Zone Phase 1 buildings, the West Zone 220 kV substation and the separate South and North Zones of the Huawei Horinger project are not included. evidence

Planning and Construction Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区规划建设局) · published 2026-09-23

Location

The interactive map needs JavaScript. Display anchor: 40.53350, 111.80286 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

Huawei Cloud Horinger Yungu West Zone Phase 1 — second-batch works (2# data-centre machine-room building and 2# generator platform)

Completed last observed as of · Authoritative status update

Approval-result publicity page (发布时间 2025-02-10 16:17) in the department's nuclear and radiation supervision list, titled as the approval result of the radiation-category EIA for the Huawei Cloud Horinger Data Center project - Yungu West Zone (Phase 1) 220 kV substation, with the report form as its attachment. It approves ancillary grid works and is not consent for the data-centre buildings. evidence

Inner Mongolia Autonomous Region Department of Ecology and Environment · published 2025-02-10

Companies
  • Owner: Huawei Cloud Computing Technology Co., Ltd. (华为云计算技术有限公司) (current) evidence
Source and location review
Status source
Horinger New Area news item: 'Huawei Cloud Horinger Data Center project - Yungu West Zone (Phase 1) second-batch construction works complete their completion-acceptance filing' (华为云和林格尔数据中心项目-云谷西区(一期)第二批次建设工程完成竣工验收备案), 23 September 2026 evidence row
Planning and Construction Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区规划建设局) · published 2026-09-23 · Government record
Locator
Campus locator · Official source · official_eia_on_campus_substation_locator evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 34 days before the data update on 2026-10-27

Location details
Coordinates
40.53350, 111.80286
Geometry licence
all-rights-reserved
Use scope
Campus locator
Scope class
official_eia_on_campus_substation_locator
Authority
Official source
Source entity
Campus
Method
official_eia_geographic_dms_point_transcription
Derivation
direct_geometry
Precision scope
EIA centre point of the West Zone Phase 1 project's own 220 kV substation building (147.1 m x 42.2 m), which the report states is one of the West Zone Phase 1 buildings and lies inside that project's land. Locates the West Zone campus through on-campus power infrastructure at its south side; not the 2# machine-room building whose completion is recorded, nor an entrance or parcel centroid. The campus's data-centre buildings lie north of the point.
Horizontal uncertainty
Not reported

No datum or positional accuracy is stated. The WGS84/CGCS2000 reading is supported by the report's internally consistent side points and by agreement with independent Esri imagery of unstated accuracy and date within about 10-15 m (manual visual comparison). The point marks the campus's substation building at its south side, up to a few hundred metres from the machine-room buildings. Decimal places are transcription precision, not accuracy.

Geometry evidence
ea139fe4

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Huawei Cloud Horinger Data Center — Yungu West Zone
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Environmental impact report form: Huawei Cloud Horinger Data Center project - Yungu West Zone (Phase 1) 220 kV substation (Inner Mongolia Department of Ecology and Environment radiation-EIA approval-result publicity, 10 February 2025)
Archived copy
Inner Mongolia Autonomous Region Department of Ecology and Environment
Environmental assessment document
Geometry, Owner claimall-rights-reservedInner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 华为云计算技术有限公司9b06c22e80a414e9849561c4f5edb18bd9e8c3b09ad2939bb25185e608ee5940
Retained source material; see source provenance
Esri World Imagery EPSG:4326 export around the Huawei Cloud Horinger West Zone, the Bank of China data centre and the Northern Data Lake park, Horinger (request bbox 111.794-111.814E, 40.528-40.548N)
Archived copy
Esri
Map feature
Site and project identitynot statedall-rights-reservedEsri, Maxar, Earthstar Geographics and the GIS user community (World Imagery)0e31c5f0c9a3d0d30bff5966095a70891bf4d3bcbc9feebb1f8cde5a80970a99
Retained source material; see source provenance
Horinger New Area news item: 'Huawei Cloud Horinger Data Center project - Yungu West Zone (Phase 1) second-batch construction works complete their completion-acceptance filing' (华为云和林格尔数据中心项目-云谷西区(一期)第二批次建设工程完成竣工验收备案), 23 September 2026
Archived copy
Planning and Construction Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区规划建设局)
Government record
Physical statusall-rights-reserved自贸试验区呼和浩特片区、和林格尔新区规划建设局, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)45741cf839343622262fabea0906aac229e73b5874d51cf094e8a151d8af3e6d
Retained source material; see source provenance
Horinger New Area news item: 'Huawei's first 3D data centre in north China tops out' (华为北方首个3D数据中心封顶), 13 October 2026
Archived copy
Investment Promotion Services Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区招商服务局)
Government record
Site and project identity, Physical statusall-rights-reserved自贸试验区呼和浩特片区、和林格尔新区招商服务局, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)306978d461918c0f215358a37c57e7d0ef159e766c0fb7d6ce3bd17ffd2a5c26
Retained source material; see source provenance
Inner Mongolia Department of Ecology and Environment approval-result publicity for the radiation-category EIA of the Huawei Cloud Horinger Data Center project - Yungu West Zone (Phase 1) 220 kV substation, 10 February 2025
Archived copy
Inner Mongolia Autonomous Region Department of Ecology and Environment
Government record
Site and project identityall-rights-reservedInner Mongolia Autonomous Region Department of Ecology and Environmentd6339c070fa54807f3a9f1076127f02f55aa8ca9e7a2f7d3496cef56d86594be
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). Huawei Cloud Horinger Data Center — Yungu West Zone [site vcc-site-f335df1fb078ba6f6d19]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f335df1fb078ba6f6d19/