China Mobile GBA (Shaoguan) Data Center

Announced Completed

China · 2 projects · Last reported

Summary

China Mobile GBA (Shaoguan) Data Center — C/D buildings (Phase 2)

On September 30, 2026 the Shaoguan Natural Resources Bureau published China Mobile Guangdong's application for a construction-project planning permit for C and D data-centre buildings, a maintenance-support building and a switching station at parcel ZC0201A-15 (84,323.67 m2 requested). The two existing northern buildings are marked as built Phase 1. The notice does not establish an issued permit or physical works. evidence

Shaoguan Natural Resources Bureau · published 2026-09-30

China Mobile GBA (Shaoguan) Data Center — Phase 1 A/B buildings

The Shaoguan Natural Resources Bureau's September 30, 2026 notice sheet labels the campus's A and B data-centre buildings (4 storeys above ground, 1 below) and its No. 1 power centre as Phase 1 already built ('一期已建'). This supports completed building construction of the Phase 1 A/B buildings as of the notice date. It does not establish operation in the window: the municipal report of formal operation from June 11, 2025 is outside the 90-day window and is kept as context. The Phase 2 C/D buildings remain a separate announced project. evidence

Shaoguan Natural Resources Bureau · published 2026-09-30

Location

The interactive map needs JavaScript. Display anchor: 24.90996, 113.55278 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (2)

China Mobile GBA (Shaoguan) Data Center — C/D buildings (Phase 2)

Announced last observed as of · Project announcement

Government report that China Mobile GBA (Shaoguan) Data Center entered formal operation on June 11, 2025. Total investment CNY 5.6 billion; planned four data-centre buildings, two power centres and one operations centre, 32,000 standard racks in two phases; Phase 1 built with 16,000 standard racks; Phase 2 then forecast for 2026. evidence

Shaoguan Municipal Government · published 2025-06-13

Georeferenced 2025 Sentinel-2 cloudless mosaic extract (113.535-113.570E, 24.895-24.925N). Used only to validate the coordinate-system interpretation of official Shaoguan site plans: built China Mobile A/B and China Telecom A5/A6 rows are visible and match plan coordinates under EPSG:4526. Not used as a status observation. evidence

EOX IT Services GmbH · publication date not stated

Government portal report says China Mobile, China Unicom and China Telecom data centres in the Zhenjiang cluster have entered operation, and that China Telecom GBA data centre Phase 2 has started in Zhenjiang industrial park; Phase 2.1 land is 31.5 mu with about 50,000 m2 total floor area. It also says China Unicom Shaoguan data-centre computing will exceed 20,000 P by end-2026 (forecast). evidence

Shaoguan Municipal Government / Shaoguan Daily · published 2026-08-27

Companies
  • Operator: China Mobile Communications Group Guangdong Co., Ltd. (intended) evidence
Source and location review
Status source
Shaoguan NRB pre-approval notice: China Mobile GBA (Shaoguan) Data Center C and D buildings, maintenance building and switching station evidence row
Shaoguan Natural Resources Bureau · published 2026-09-30 · Government record
Locator
Campus locator · Compiled location reference · official_redline_parcel_centroid_from_plan_coordinates evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 27 days before the data update on 2026-10-27

China Mobile GBA (Shaoguan) Data Center — Phase 1 A/B buildings

Completed last observed as of · Authoritative status update

Official notice page carrying the plan sheet: China Mobile Communications Group Guangdong Co., Ltd. applies for a construction-project planning permit for the China Mobile GBA (Shaoguan) Data Center project (C and D buildings, maintenance-support building, switching station) at parcel ZC0201A-15; notice period September 30 to October 10, 2026. evidence

Shaoguan Natural Resources Bureau · published 2026-09-30

Government report that the China Mobile GBA (Shaoguan) Data Center entered formal operation on June 11, 2025: four data-centre buildings, two power centres and one operations centre planned with 32,000 standard racks in two phases; Phase 1 built with 16,000 standard racks. evidence

Shaoguan Municipal Government · published 2025-06-13

City government portal report (reprinted from Shaoguan Daily). It states that, as of August 21, 2026, the completed Phase 1 projects of China Telecom, China Mobile and China Unicom in Zhenjiang District have 39,000 P of computing capacity racked, and that the China Mobile, China Unicom and China Telecom data centres in the Zhenjiang part of the Shaoguan cluster have successively entered operation. It also reports China Telecom GBA data centre Phase 2 started in Zhenjiang industrial park (Phase 2.1 land 31.5 mu, about 50,000 m2) and that China Telecom's 244-mu Shaotang parcel was levelled 38 days ahead of its tender schedule. evidence

Shaoguan Municipal Government / Shaoguan Daily · published 2026-08-27

Companies
  • Owner: China Mobile Communications Group Guangdong Co., Ltd. (current) evidence
Source and location review
Status source
Shaoguan NRB pre-approval notice plan sheet: China Mobile GBA (Shaoguan) Data Center C/D, parcel ZC0201A-15 evidence row
Shaoguan Natural Resources Bureau · published 2026-09-30 · Government record
Locator
Campus locator · Compiled location reference · official_redline_parcel_centroid_from_plan_coordinates evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 27 days before the data update on 2026-10-27

Location details
Coordinates
24.90996, 113.55278
Geometry licence
all-rights-reserved
Use scope
Campus locator
Scope class
official_redline_parcel_centroid_from_plan_coordinates
Authority
Compiled location reference
Source entity
Campus
Method
official_plan_gauss_kruger_zone38_coordinates_cgcs2000_transform_imagery_checked
Derivation
coordinate_transform
Precision scope
Centroid of the official ZC0201A-15 planning red line (six transcribed vertices; 73,063 m2 computed vs 73,605 m2 stated) containing built Phase 1 A/B and proposed C/D. The C/D pair centroid lies 51 m south-west. Not a surveyed boundary, entrance or construction extent.
Horizontal uncertainty
Not reported

The plans state no datum or survey accuracy; the CGCS2000 zone-38 interpretation is checked only against 10 m Sentinel-2 imagery (registration within roughly 10 m for built controls). Absolute accuracy is not established; decimal places are arithmetic precision.

Geometry evidence
a753caa5

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for China Mobile GBA (Shaoguan) Data Center
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
EOX Sentinel-2 cloudless 2025 mosaic: Shaoguan Zhenjiang data-centre cluster (EPSG:4326 WMS extract)
Archived copy
EOX IT Services GmbH
Other
Site and project identitynot statedCC-BY-NC-SA-4.0Sentinel-2 cloudless - https://s2maps.eu by EOX IT Services GmbH (Contains modified Copernicus Sentinel data 2025)fbbdb234d7c59561a9367aae4cc7741c95268c7e66f20e4680a814c237146bea
Retained source material; see source provenance
Shaoguan government: China Mobile GBA (Shaoguan) Data Center formally in operation (June 2025)
Archived copy
Shaoguan Municipal Government
Government record
Site and project identityall-rights-reservedShaoguan Municipal Government688a460b5be88b5798d69382bea330c6e0e6c0988fd411058fd3deef48c58ae1
Retained source material; see source provenance
Shaoguan government: Zhenjiang accelerates GBA computing core (reprinted from Shaoguan Daily)
Archived copy
Shaoguan Municipal Government / Shaoguan Daily
Government record
Site and project identityall-rights-reservedShaoguan Municipal Government / Shaoguan Dailyc3611bd68ad18376d16c6eee3ad8a65dc4ae55af364d91f41a3176108a9d10bf
Retained source material; see source provenance
Shaoguan NRB pre-approval notice plan sheet: China Mobile GBA (Shaoguan) Data Center C/D, parcel ZC0201A-15
Archived copy
Shaoguan Natural Resources Bureau
Government record
Geometry, Physical status, Operator claimall-rights-reservedShaoguan Natural Resources Bureau2734c774cc1155871c6b59e1a164a905d114c268f2cc51830c5b44da419aa846
Retained source material; see source provenance
Shaoguan NRB pre-approval notice: China Mobile GBA (Shaoguan) Data Center C and D buildings, maintenance building and switching station
Archived copy
Shaoguan Natural Resources Bureau
Government record
Project announcement, Site and project identity, Owner claimall-rights-reservedShaoguan Natural Resources Bureaude9636e2a3a9d19df324fa65154b3d1a396943550b7542499b030034edbe29b0
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). China Mobile GBA (Shaoguan) Data Center [site vcc-site-25a38e5a66933753cd86]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-25a38e5a66933753cd86/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction