AdaniConneX Pune Data Center Campus
Partially operational Under construction
India · 2 projects · Last reported
Summary
AdaniConneX Pune data centre campus
AdaniConneX, the Adani group's data centre business, lists a Pune campus with a potential capacity of 250 MW of IT load and a first phase live from October 2025. Adani reported in July 2026 that 9.6 MW of the campus's second phase had been handed over to a customer. The company says the campus can use up to 100% renewable power, and a February 2026 Adani group release links its Microsoft partnership to the Pune and Hyderabad campuses without describing the terms. The site address has not been published.
Source record as of 2026-07-29 · Details and sources
AdaniConneX Pune PNQ04 Current Build
AdaniConneX names Pune among four new campuses advancing through phased development. evidence
AdaniConneX · published 2026-06-01
Location
The interactive map needs JavaScript. Display anchor: 18.64671, 73.80727 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Project locator; building footprints are not mapped.
Projects (2)
AdaniConneX Pune data centre campus
Partially operational last observed as of · Reported status
Location: Pune, Maharashtra, IN. Sources name Pune only. Coordinates are the Pune city coordinates from Wikipedia (Nominatim was rate-limiting requests), not the site. AdaniConneX; Adani Group; Adani Group
Use: Colocation
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | up to 250 MW | Planned · Campus · It load | 2026 | Listed by the company as potential capacity in IT load. | AdaniConneX |
| Power capacity | 9.6 MW | Operational · Phase · Unspecified · Phase II capacity handed over to customer | 2026-07-29 | Adani Group |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| AdaniConneX | Developer | AdaniConneX; Adani Group |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025-10 | First operational | Actual | Company lists Phase 1 as live from October 2025, although the same page also describes the Pune facility as soon to be launched. | AdaniConneX |
Power supply
| Type | Description | Sources |
|---|---|---|
| Other | Company states up to 100% renewable energy; the supply arrangement is not described. | AdaniConneX |
Microsoft is not listed as a party because the Adani release does not state its role at the Pune campus, and the customer that received the Phase II capacity is not named. The capacity of Phase 1 is not published. The July 2026 results release also gives an operational capacity of 65.4 MW after the handover without saying whether that figure covers Pune alone or all AdaniConneX sites, so it is not recorded.
Sources for these details
- Data Centers — AdaniConneX; publication date not stated
- Adani Enterprises Ltd announces Q1-FY27 results — Adani Group; 2026-07-29
- Adani Commits USD 100 Bn to Sovereign AI Infrastructure — Adani Group; 2026-02-17
- Companies
Source and location review
- Status source
- Data Centers evidence row
AdaniConneX · publication date not stated · Company disclosure - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 90 days before the data update on 2026-10-27
AdaniConneX Pune PNQ04 Current Build
Under construction last observed as of · Authoritative status update
Source and location review
- Status source
- Scaling India's data centres responsibly for the AI Era: Bridging People, Planet and Growth evidence row
AdaniConneX · published 2026-06-01 · Company disclosure - Locator
- Project locator · Official source · official_source_reported_project_reference_point evidence
- Source checks
Not reviewed against imagery not_
reviewed_ for_ core_ preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 148 days before the data update on 2026-10-27
Location details
- Coordinates
- 18.64671, 73.80727
- Geometry licence
- all-rights-reserved
- Use scope
- Project locator
- Scope class
- official_source_reported_project_reference_point
- Authority
- Official source
- Source entity
- Project
- Method
- official_project_report_coordinate_to_point
- Derivation
- direct_geometry
- Precision scope
- Official source-reported point used only to locate the PNQ04 project. It is not a project centroid, footprint, parcel, building outline, construction extent, campus boundary, or survey-accuracy claim.
- Horizontal uncertainty
Not reported
The report does not identify the coordinate's datum, reference feature, collection method, or horizontal accuracy.
- Geometry evidence
- 9e5f7eb0
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Adani Commits USD 100 Bn to Sovereign AI Infrastructure Archived copy | Adani Group Company disclosure | Imported: Geometry, Imported: Record | source-terms-not-recorded | Adani Group | 1daa63b212cfc50cb284f650881ca6429c8856927ebed3862ee8695a4a14d643Factual source record; not the publisher page | ||
| Adani Enterprises Ltd announces Q1-FY27 results Archived copy | Adani Group Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Role: Developer | source-terms-not-recorded | Adani Group | b8f1e9afcde88e53d645745ac91853e3e28746a907f986b76fc733728f299082Factual source record; not the publisher page | ||
| Compliance to Stipulated Conditions in Environment Clearance, October 2024 to March 2025 — Development of Data Center PNQ04 Archived copy | Pune Data Center Limited Company disclosure | Geometry | not stated | all-rights-reserved | Pune Data Center Limited | 406e7134f896a916f6ac978a888183f67de62218cbfbd24a90248af52af544f4Retained source material; see source provenance | |
| Data Centers Archived copy | AdaniConneX Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: First Operational, Power Source: Other, Role: Developer | not stated | source-terms-not-recorded | AdaniConneX | 0e1ea80dd682092f0243900f30e671ba78883ad026fc9a183e367761f4fb6154Factual source record; not the publisher page | |
| Scaling India's data centres responsibly for the AI Era: Bridging People, Planet and Growth Archived copy | AdaniConneX Company disclosure | Physical status | all-rights-reserved | AdaniConneX | ec057dbf5efe7c0b5f8344cbdd7e74b1cf1d208c8ff2545c1f4f4dc45b6721ffRetained source material; see source provenance |