Agricultural Bank of China Horinger Data Center (Data Centre Third Branch)
Operational
China · 1 project · Last reported
Summary
On 31 August 2026 the Horinger New Area public affairs service bureau (emergency bureau) reported a safety inspection of the Agricultural Bank of China data centre as a newly put-into-production operating unit (新投产运营单位) in its initial production period, checking its fire control room, machine rooms, fire alarm linkage and gas suppression systems, emergency power and equipment-room environmental monitoring, and noting that the data centre carries the safe operation of financial business systems. The record covers the data centre's operation as of the publication date; the commissioning date, the buildings in service and any capacity are not stated, and the EIA's Phase 1 and Phase 2 building programmes and 366 MW load are planned figures that are not asserted. evidence
Public Affairs Service Bureau (Emergency Management Bureau) of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区公共事业服务局(应急局)) · published 2026-08-31
Location
The interactive map needs JavaScript. Display anchor: 40.53655, 111.79787 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (1)
Agricultural Bank of China Horinger Data Center — newly commissioned data-centre operations
Operational last observed as of · Authoritative status update
Approval decision text attached to the department's approval-result publicity of 15 March 2023 (local nmg-abc-horinger-2x110kv-20230320.html). It approves in principle two new 110 kV substations (each 2 x 63 MVA, two 110 kV incoming circuits) for the Agricultural Bank of China Horinger data centre in Horinger New Area, requires completion environmental acceptance before formal operation, and delegates construction-period supervision to the Hohhot Ecology and Environment Bureau. The published text carries no reference number or signing date. It approves ancillary grid works, not the data-centre buildings. evidence
Inner Mongolia Autonomous Region Department of Ecology and Environment · published 2023-03-15
- Companies
Source and location review
- Status source
- Horinger New Area news item: 'Serving new projects in advance, building a safety firewall' (靠前服务新项目 筑牢安全“防火墙”), 31 August 2026 evidence row
Public Affairs Service Bureau (Emergency Management Bureau) of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区公共事业服务局(应急局)) · published 2026-08-31 · Government record - Locator
- Campus locator · Compiled location reference · official_eia_on_campus_substation_locator evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 57 days before the data update on 2026-10-27
Location details
- Coordinates
- 40.53655, 111.79787
- Geometry licence
- all-rights-reserved
- Use scope
- Campus locator
- Scope class
- official_eia_on_campus_substation_locator
- Authority
- Compiled location reference
- Source entity
- Campus
- Method
- official_eia_dms_point_inferred_gcj02_converted_to_wgs84
- Derivation
- coordinate_transform
- Precision scope
- The campus's Data 1# 110 kV substation, which the EIA places inside the data-centre campus on its south side, west of the south main gate and about 20 m north of Yungu Heng 44 Road; converted from the printed GCJ-02-frame value. Locates the campus through on-campus power infrastructure at its south edge; not a machine-room building, entrance or parcel centroid. The Phase 1 machine-room buildings lie roughly 100-300 m north-east of the point.
- Horizontal uncertainty
Not reported
No datum or positional accuracy is stated; the GCJ-02 frame is inferred from the fit of the report's site plan to independent Esri imagery of unstated accuracy and date (manual visual comparison, agreement within about 30 m), and the printed value may itself have been read from a web map. The point marks a substation at the campus's south edge. Decimal places are computational precision, not accuracy.
- Geometry evidence
- 3e1f0a7d
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Environmental impact report form: Agricultural Bank of China Horinger Data Centre two 110 kV substations (Inner Mongolia Department of Ecology and Environment radiation-EIA approval-result publicity, 15 March 2023) Archived copy | Inner Mongolia Autonomous Region Department of Ecology and Environment Environmental assessment document | Geometry, Owner claim | all-rights-reserved | Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 中国农业银行股份有限公司内蒙古自治区分行 | 6e3ed5a57984e82840a28dcb6420091e23373894180759646a739dd06fc6990aRetained source material; see source provenance | ||
| Esri World Imagery EPSG:4326 export across the Agricultural Bank of China Horinger data-centre campus and its neighbours (111.785-111.813E, 40.531-40.545N) Archived copy | Esri Map feature | Site and project identity | not stated | all-rights-reserved | Esri, Maxar, Earthstar Geographics and the GIS user community (World Imagery) | 6deb33c87e683cfbebbe50345356a9d5e88ebb267ffcd429eb01623b1f414c0eRetained source material; see source provenance | |
| Horinger New Area news item: 'Serving new projects in advance, building a safety firewall' (靠前服务新项目 筑牢安全“防火墙”), 31 August 2026 Archived copy | Public Affairs Service Bureau (Emergency Management Bureau) of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区公共事业服务局(应急局)) Government record | Physical status, Operator claim | all-rights-reserved | 自贸试验区呼和浩特片区、和林格尔新区公共事业服务局, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn) | c3208158aad7854cf547ffff5eef7e4b62d6ac90cb94deaad373d7babf931c0eRetained source material; see source provenance | ||
| Inner Mongolia Department of Ecology and Environment approval of the EIA report form for the Agricultural Bank of China Horinger Data Centre two 110 kV substations (published with the approval-result publicity of 15 March 2023) Archived copy | Inner Mongolia Autonomous Region Department of Ecology and Environment Government record | Site and project identity | all-rights-reserved | Inner Mongolia Autonomous Region Department of Ecology and Environment | 20567bdc8abddf0ac2d820e7c6702fa3b6076855e1ea20a34667efa1c628e9beRetained source material; see source provenance |
Cite this site
Kyars, K. (2026). Agricultural Bank of China Horinger Data Center (Data Centre Third Branch) [site vcc-site-7311a9ab273caa85afc2]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7311a9ab273caa85afc2/