HUMAIN Dammam AI data centre
Under construction
Saudi Arabia · 1 project · Last reported
Summary
One of the first two data centres of HUMAIN, the Public Investment Fund's AI company, under construction in Dammam in the Eastern Province as of August 2025. HUMAIN's chief executive said each of the two initial sites, in Riyadh and Dammam, would open with up to 100 MW, using US chips including NVIDIA's latest accelerators, with launch targeted for the second quarter of 2026 (headlines said early 2026). The sources reviewed give no district, building details or investment figure, and no later progress report was found.
Source record as of 2025-08-26 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 26.43300, 50.10000 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
HUMAIN Dammam AI data centre
Under construction last observed as of · Reported status
Location: Dammam, Eastern Province, SA. Sources name Dammam only. Coordinates are the Dammam city coordinates from Wikipedia (Nominatim was rate-limiting requests), not the site. Arab News (Reuters); Capacity
Use: Ai unspecified
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | up to 100 MW | Planned · Phase · Unspecified · Initial capacity | 2025-08-26 | Reuters, citing Bloomberg, gives up to 100 MW of initial capacity for each of the Riyadh and Dammam sites. Capacity's write-up of the same interview does not split the figure by site. | Arab News (Reuters) |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| HUMAIN | Developer | Arab News (Reuters); Capacity |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2026-Q2 | First operational | Planned | Reports of the August 2025 interview give both early 2026 and the second quarter of 2026 as the launch target. | Arab News (Reuters); Capacity |
Both sources report the same Bloomberg interview with HUMAIN's chief executive. The second-quarter 2026 launch target has passed, and no source opened for this record confirms whether the site is operating.
Related projects: humain riyadh, humain al saad riyadh
Sources for these details
- Saudi Arabia's Humain to launch data centers with US chips in early 2026, Bloomberg News reports — Arab News (Reuters); 2025-08-26
- How Humain plans to use US chips in new Saudi Arabia AI data centres — Capacity; 2025-08-26 · Archived source
Source and location review
- Status source
- Saudi Arabia's Humain to launch data centers with US chips in early 2026, Bloomberg News reports evidence row
Arab News (Reuters) · published 2025-08-26 · News - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 427 days before the data update on 2026-10-27
Location details
- Coordinates
- 26.43300, 50.10000
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Sources name Dammam only. Coordinates are the Dammam city coordinates from Wikipedia (Nominatim was rate-limiting requests), not the site.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- c9f21c02
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| How Humain plans to use US chips in new Saudi Arabia AI data centres Archived copy | Capacity Trade publication | Imported: Geometry, Imported: Record, Imported: Status, Milestone: First Operational, Role: Developer | source-terms-not-recorded | Capacity | 8696fee14fa787135225f2f6d371e456e2fa3886a257a6a18ad35c0faa34398fFactual source record; not the publisher page | ||
| Saudi Arabia's Humain to launch data centers with US chips in early 2026, Bloomberg News reports Archived copy | Arab News (Reuters) News | Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: First Operational, Role: Developer | source-terms-not-recorded | Arab News (Reuters) | 500337c8d21fbb4c6134f92efb461b381424b74f4ea0bb44421f82d94b690c6dFactual source record; not the publisher page |
Cite this site
Kyars, K. (2026). HUMAIN Dammam AI data centre [site vcc-site-8f9f601fd64ed7dfc62c]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8f9f601fd64ed7dfc62c/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction