2026-10-26 · 751 sites
Atlas data archived on 2026-10-26, with additions and corrections listed below.
Summary #
- Updated
- Observation dates
- to
- Counts
- 751 sites, 803 projects, 63 countries, 4176 evidence rows
- Previous snapshot
- 2026-10-26 · 745 sites
- Manifest SHA-256
2223502c5420c8ef67dbd8a0235e976b3218bfb873ad7d05a444df801c67ee9c- Files
- Download this snapshot · GitHub
Changes from the previous snapshot #
6 sites added; 2 sites changed; 6 projects added; 2 projects changed; 44 evidence rows added.
Sites added (6) #
- Equinix CH5 Data Center, 2001 Lunt Ave, Elk Grove Village vcc-site-9ea881e4f6faab9a0137
- Microsoft EKI Campus, 12501 Cleveland Road, Granger (St. Joseph County, Indiana) vcc-site-c0c7b4087b3f24c58bce
- Project Flex Data Center Campus (Lyon Township, Ambassador Parkway West and Milford Road) vcc-site-b66784d37126c8c3b6a0
- TierPoint Bethlehem (BET) Data Center (3864 Courtney Street, Suite 130, Hanover Township, Northampton County, Pennsylvania) vcc-site-7830f1806bf63c514962
- TierPoint Lehigh Valley (LVQ) Data Center (3949 Schelden Circle, Hanover Township, Northampton County, Pennsylvania) vcc-site-34901bbf39b3b6b94f30
- TierPoint Philadelphia (PHI) Data Center (4775 League Island Boulevard, Philadelphia Navy Yard, Pennsylvania) vcc-site-1699224923dfab657965
Fields changed (13) #
Values that changed between the two snapshots. The earlier data remains available.
| Table | Record | Field | Before → after |
|---|---|---|---|
| sites | Meta DeKalb Data Center vcc- | oldest_ | 2023-12-01 → 2026-10-26 |
| sites | Meta DeKalb Data Center vcc- | newest_ | 2023-12-01 → 2026-10-26 |
| sites | Vantage Lighthouse Port Washington Data Center Campus vcc- | oldest_ | 2026-08-28 → 2026-10-19 |
| sites | Vantage Lighthouse Port Washington Data Center Campus vcc- | newest_ | 2026-08-28 → 2026-10-19 |
| projects | Vantage Lighthouse Port Washington Current Campus Build 3b636397- | status_ | 2026-08-28 → 2026-10-19 |
| projects | Vantage Lighthouse Port Washington Current Campus Build 3b636397- | status_ | 59 → 7 |
| projects | Vantage Lighthouse Port Washington Current Campus Build 3b636397- | status_ | 2659d4c4-2dad-5902-9c7e-f9365e4ac9a1 → 4a80593e-5517-5100-8ccd-44ecd9311f2d |
| projects | Vantage Lighthouse Port Washington Current Campus Build 3b636397- | status_ | https://www.oracle.com/data-centers/ → https://www.lighthousewisconsin.com/construction-updates/ |
| projects | Meta DeKalb Data Center d3694f4b- | status_ | 2023-12-01 → 2026-10-26 |
| projects | Meta DeKalb Data Center d3694f4b- | status_ | 1060 → 0 |
| projects | Meta DeKalb Data Center d3694f4b- | status_ | imported_documented_status → authoritative_physical_status_update |
| projects | Meta DeKalb Data Center d3694f4b- | status_ | c7e0b45a-dd55-5ce8-a84e-5a19744afa75 → 9eb22845-9408-543f-9942-a0b64343c03a |
| projects | Meta DeKalb Data Center d3694f4b- | status_ | https://www.shawlocal.com/daily-chronicle/2023/11/30/meta-takes-dekalb-data-center-online → https://www.cityofdekalb.com/AgendaCenter/ViewFile/Agenda/_10262026-2921 |
Cite this snapshot #
Kyars, K. (2026). Data Center Atlas (2026-10-26) [Data set]. https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-26-research-eightyfirst/