2026-10-27 · 801 sites

Atlas data archived on 2026-10-27, with additions and corrections listed below.

Summary #

Updated
Observation dates
to
Counts
801 sites, 861 projects, 63 countries, 4478 evidence rows
Previous snapshot
2026-10-27 · 792 sites
Manifest SHA-256
4e20517a8ad8a3d458f96532660141263b84cda6b6c64bf58cbc8838b96b9ff6
Files
Download this snapshot · GitHub

Changes from the previous snapshot #

9 sites added; 2 sites changed; 10 projects added; 1 project changed; 47 evidence rows added; 5 evidence rows changed.

Sites added (9) #

Fields changed (15) #

Values that changed between the two snapshots. The earlier data remains available.

TableRecordFieldBefore → after
sitesEdgeConneX Mesa Campus (PHX11 and PHX12, 3261 S Hawes Rd, Mesa, Arizona)
vcc-site-c4391892c0d4ac0e1fd0
project_count1 → 2
sitesEdgeConneX Mesa Campus (PHX11 and PHX12, 3261 S Hawes Rd, Mesa, Arizona)
vcc-site-c4391892c0d4ac0e1fd0
project_ids_jsonJSON value changed (see the CSV files of both snapshots)
sitesEdgeConneX Mesa Campus (PHX11 and PHX12, 3261 S Hawes Rd, Mesa, Arizona)
vcc-site-c4391892c0d4ac0e1fd0
project_stable_keys_jsonJSON value changed (see the CSV files of both snapshots)
sitesEdgeConneX Mesa Campus (PHX11 and PHX12, 3261 S Hawes Rd, Mesa, Arizona)
vcc-site-c4391892c0d4ac0e1fd0
oldest_status_as_of2026-10-20 → 2026-09-23
sitesCtrlS Bengaluru Datacenter (Electronic City)
vcc-site-c77e1bff9259ec397770
oldest_status_as_of2026-08-12 → 2026-10-26
sitesCtrlS Bengaluru Datacenter (Electronic City)
vcc-site-c77e1bff9259ec397770
newest_status_as_of2026-08-12 → 2026-10-26
projectsCtrlS Bengaluru Datacenter — existing operations
3328969b-12bc-5ceb-bfe1-ca4e36ea5b1b
status_as_of2026-08-12 → 2026-10-26
projectsCtrlS Bengaluru Datacenter — existing operations
3328969b-12bc-5ceb-bfe1-ca4e36ea5b1b
status_age_days_at_review76 → 1
projectsCtrlS Bengaluru Datacenter — existing operations
3328969b-12bc-5ceb-bfe1-ca4e36ea5b1b
status_evidence_id3cc5a1a4-7bf9-5642-9506-62eb0690df22 → 1a5141a1-4c9e-5372-ad0a-f6d6938915ba
projectsCtrlS Bengaluru Datacenter — existing operations
3328969b-12bc-5ceb-bfe1-ca4e36ea5b1b
status_source_urlhttps://www.ctrls.com/datacenter-bangalore/ → https://www.ctrls.com/datacenter-colocation/
evidenceMaricopa County Assessor parcel 304-03-011X (3261 S Hawes Rd, Mesa; LOOP 202 & ELLIOT ROAD LLC)
36ad5920-4bc9-5a9c-82cc-138a5b9e714b
project_ids_jsonJSON value changed (see the CSV files of both snapshots)
evidenceInfrastructure flexibility and the hidden cost of lock-in (CtrlS blog, 26 October 2026)
81b2a133-4f50-5973-80f5-dc12e87133c2
project_ids_jsonJSON value changed (see the CSV files of both snapshots)
evidenceCity of Mesa Building Permits (dzpk-hxfb): permits at 3261 and 3319 S Hawes Rd or on parcels 30403011* (EdgeConneX Mesa campus), selected fields without work descriptions
c74e6010-555f-51ad-99bc-af9f46e54a22
project_ids_jsonJSON value changed (see the CSV files of both snapshots)
evidenceDataBank: Atlanta Data Centers (ATL) market page (version modified 30 September 2026)
d3458470-75ff-5d49-8318-91f33c53aaf5
project_ids_jsonJSON value changed (see the CSV files of both snapshots)
evidenceNovva Data Centers page sitemap (page-sitemap.xml)
f7d8afe2-a703-5b9e-82a1-7da8d05e2040
project_ids_jsonJSON value changed (see the CSV files of both snapshots)

Cite this snapshot #

Kyars, K. (2026). Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-ninetysecond/