Microsoft Villamayor de Gállego datacenter campus (Aragón)

Site records

Planned Microsoft datacenter campus on Villamayor de Gállego land at the Malpica industrial estate northeast of Zaragoza, the third Aragón site Microsoft disclosed. The regional government declared it of regional interest in July 2024, citing EUR 2.2 billion of total investment and EUR 365.3 million for an initial phase. The November 2025 regional plan (PIGA Región MSFT) lists 81 hectares and about EUR 1.73 billion, with 50 MW secured for a first phase and up to 300 MW sought later. A modified plan went out for public comment in July 2026, and Forbes reported first operation was expected from 2030.

This record reports announced as of 2026-09-04. elDiario.es

Location: Villamayor de Gállego, Zaragoza, Aragón, ES. Municipality centroid from Nominatim. Sources place the campus on Villamayor de Gállego land associated with the Polígono Malpica, whose named substation (Malpica) serves it; the parcel itself is not identified. Vozpópuli; Inspenet; elDiario.es

Use: Cloud, Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investment2,200,000,000 EURAnnounced · Campus2024-07-03Total cited when the regional interest declaration was made; the Vozpópuli headline rounds it to EUR 2 billion.Vozpópuli; Inspenet
Investment365,300,000 EURAnnounced · Phase · Initial construction phase2024-07-03Vozpópuli; Inspenet
Investment1,733,000,000 EURReported · Campus2025-11-14Per-site figure in the November 2025 PIGA as reported by elDiario.es; lower than the 2024 figure, and the sources do not explain the difference.elDiario.es
Power capacity50 MWPlanned · Phase · Unspecified · First phase2025-11-14elDiario.es; Forbes España
Power capacityup to 300 MWPlanned · Campus · Unspecified2025-11-14Second-phase aspiration per campus in the PIGA, as reported by elDiario.es; Forbes gives 250-300 MW per campus over about ten years.elDiario.es; Forbes España
Land area81 hectaresPlanned · Campus2025-11-14elDiario.es
Jobs construction2,000 countPlanned · Phase · Initial construction phase2024-07-03Inspenet describes these as jobs during construction; Vozpópuli says the initial phase will employ 2,000 people.Vozpópuli; Inspenet
Jobs permanentabout 300 countPlanned · Campus2024-07-03Vozpópuli; Inspenet

Companies and organizations

NameRoleNotesSources
MicrosoftDeveloperVozpópuli; Inspenet; elDiario.es; Forbes España
Gobierno de AragónGovernmentDeclared the project of regional interest and is processing the PIGA regional plan.Vozpópuli; elDiario.es; Forbes España

Timeline

DateEventActual or plannedNotesSources
2024-07-03AnnouncedActualAragón's governing council declared the campus of regional interest.Vozpópuli; Inspenet
2025-11-14OtherActualInitial approval of the PIGA Región MSFT plan covering La Muela, Villamayor de Gállego and Zaragoza, opening a public information period.elDiario.es; Forbes España
2026-07-30OtherActualA modification of the PIGA was published in the Boletín Oficial de Aragón for public comment.elDiario.es
2030First operationalPlannedForbes reported the first phase was expected to operate from 2030.Forbes España

Power supply

TypeDescriptionSources
GridGrid supply through a new substation (named Malpica) starting at 132 kV with a later upgrade to 220 kV.elDiario.es

Investment figures conflict between the 2024 declaration (EUR 2.2 billion) and the 2025 PIGA (about EUR 1.73 billion); both are kept with their dates. In 2024 the sources put Microsoft's investment across its three Aragón sites at EUR 6.6 billion. No government primary source was opened; Boletín Oficial de Aragón entries should be added when available.