2026-10-22 · 542 sites
Atlas data archived on 2026-10-22, with additions and corrections listed below.
Summary #
- Updated
- Observation dates
- to
- Counts
- 542 sites, 575 projects, 61 countries, 2880 evidence rows
- Previous snapshot
- 2026-10-19 · 518 sites
- Manifest SHA-256
282927a4aec936ce260f152c3d6ef1f2fc2b6511ed940e15080ff41b8f1f8d0f- Files
- Download this snapshot · GitHub
Changes from the previous snapshot #
24 sites added; 20 sites changed; 30 projects added; 545 projects changed; 125 evidence rows added; 15 evidence rows changed.
Sites added (24) #
- A100 ROW Liederbach Data Centers (Sindlinger Weg) vcc-site-d7132408cb579e7c7a1f
- Aligned Pataskala Data Center Campus vcc-site-978148b11c356a9982f3
- Alphen aan den Rijn Data Center (Boerhaaveweg 10) vcc-site-bad4f3ef6a837cde9b80
- AWS Zaragoza - La Cartuja Data Center Campus (sector Acampo del Marqués) vcc-site-4812cee9b68dbae470cd
- China Mobile (Ningxia Zhongwei) Data Center B-Zone vcc-site-8eb173034e749f70b695
- China Mobile (Ningxia Zhongwei) Data Center Xuanhe Campus vcc-site-767b690a800dad05ddac
- China Unicom Ningxia Zhongwei Cloud Data Center vcc-site-91bd7dbaaff4a357e678
- Datum Manchester Campus (Wavell Road, Wythenshawe) vcc-site-2cd20da1713bb0fcfc78
- Digital Edge Navi Mumbai Campus vcc-site-238b8f47b49203fa68ee
- Edged Fort Worth Project Outpost Campus vcc-site-c01c1fc0c8c91c72ed82
- Equinix BG2 Bogotá Data Center vcc-site-f5c6fe2a009a33154c02
- GBA Power-Computing Synergy Integrated Intelligent Computing Center, Shaoguan (parcel ZC0201A-28) vcc-site-87e92c2656044bd28d16
- Google Columbia County Data Center Campus (GreenPoint) vcc-site-844cdbf47a97438d7298
- HiCloud Shantou Undersea Data Center vcc-site-542e6b8f3b606a87d245
- Hofheim-Marxheim Data Center (Rheingaustraße 201) vcc-site-ccd3fa0c0268ff3715c1
- Merlin Campus de Centros de Datos Zaragoza-WIND (Botorrita) vcc-site-c6017385da6435abc381
- Microsoft Bedburg Datacenter Campus (Rheinisches Revier) vcc-site-61821b33f526947c1098
- Microsoft Petit-Landau / Hombourg Datacenter Campus (lieu-dit Alte Stocketen, Haut-Rhin) vcc-site-a984e7c4df277059e820
- PIPA-DC1 Data Center, Blyes (Parc Industriel de la Plaine de l'Ain, ZAC de la Baccolanche) vcc-site-2951be03bc4bb606aa06
- Project Longhorn Data Center Campus (Cedar Creek) vcc-site-5ccd8508002b9845d587
- Redheughs Avenue Green Data Centre Site, South Gyle, Edinburgh vcc-site-c41ec738ae5e543fa00e
- Techno Digital Chennai Campus (SIPCOT Siruseri) vcc-site-706911d0aa8c08ae8387
- Trebbin Data Center (Krumme Kabeln) vcc-site-7d2d991a3b3ae84c1d4f
- Yondr Project Allegro Data Center Campus (Aldie, Loudoun County) vcc-site-f32edd5086d6199f35be
Fields changed (674) #
Values that changed between the two snapshots. The earlier data remains available.
| Table | Record | Field | Before → after |
|---|---|---|---|
| sites | DCI Data Center La Pólvora vcc- | oldest_ | 2026-07-30 → 2026-10-16 |
| sites | DCI Data Center La Pólvora vcc- | newest_ | 2026-07-30 → 2026-10-16 |
| sites | Applied Digital Polaris Forge 1 Campus vcc- | oldest_ | 2026-07-27 → 2026-10-07 |
| sites | Digital Realty Garland Campus vcc- | project_ | 1 → 2 |
| sites | Digital Realty Garland Campus vcc- | project_ | JSON value changed (see the CSV files of both snapshots) |
| sites | Digital Realty Garland Campus vcc- | project_ | JSON value changed (see the CSV files of both snapshots) |
| sites | Digital Realty Garland Campus vcc- | newest_ | 2026-09-08 → 2026-09-24 |
| sites | China Mobile GBA (Shaoguan) Data Center vcc- | project_ | 1 → 2 |
| sites | China Mobile GBA (Shaoguan) Data Center vcc- | project_ | JSON value changed (see the CSV files of both snapshots) |
| sites | China Mobile GBA (Shaoguan) Data Center vcc- | project_ | JSON value changed (see the CSV files of both snapshots) |
| sites | China Mobile GBA (Shaoguan) Data Center vcc- | statuses_ | JSON value changed (see the CSV files of both snapshots) |
| sites | China Mobile GBA (Shaoguan) Data Center vcc- | verification_ | authoritative_project_record_plus_scoped_location → mixed_review_postures |
| sites | Ishikari Renewable Energy Data Center No.1 vcc- | oldest_ | 2026-08-01 → 2026-10-07 |
| sites | Ishikari Renewable Energy Data Center No.1 vcc- | newest_ | 2026-08-01 → 2026-10-07 |
| sites | Key Point Vladivostok Data Center vcc- | project_ | 1 → 2 |
| sites | Key Point Vladivostok Data Center vcc- | project_ | JSON value changed (see the CSV files of both snapshots) |
| sites | Key Point Vladivostok Data Center vcc- | project_ | JSON value changed (see the CSV files of both snapshots) |
| sites | Key Point Vladivostok Data Center vcc- | statuses_ | JSON value changed (see the CSV files of both snapshots) |
| sites | Key Point Vladivostok Data Center vcc- | oldest_ | 2026-10-08 → 2026-09-04 |
| sites | Key Point Vladivostok Data Center vcc- | verification_ | authoritative_physical_observation_plus_reviewed_site_locator → mixed_review_postures |
| sites | atNorth FIN04 Kouvola Campus vcc- | oldest_ | 2026-07-21 → 2026-09-23 |
| sites | atNorth FIN04 Kouvola Campus vcc- | newest_ | 2026-07-21 → 2026-09-23 |
| sites | Applied Digital Delta Forge 1 Campus vcc- | oldest_ | 2026-07-27 → 2026-10-07 |
| sites | Applied Digital Delta Forge 1 Campus vcc- | newest_ | 2026-07-27 → 2026-10-07 |
| sites | QTS Calatorao data center campus vcc- | oldest_ | 2025-08-27 → 2026-09-30 |
| sites | QTS Calatorao data center campus vcc- | newest_ | 2025-08-27 → 2026-09-30 |
| sites | QTS Calatorao data center campus vcc- | verification_ | imported_source_record → authoritative_project_record_plus_scoped_location |
| sites | Meta New Albany data center campus (Prometheus) vcc- | oldest_ | 2026-09-16 → 2026-10-19 |
| sites | Meta New Albany data center campus (Prometheus) vcc- | newest_ | 2026-09-16 → 2026-10-19 |
| sites | SoftBank Hokkaido Tomakomai AI Data Center vcc- | oldest_ | 2026-08-04 → 2026-10-21 |
| sites | SoftBank Hokkaido Tomakomai AI Data Center vcc- | newest_ | 2026-08-04 → 2026-10-21 |
| sites | Applied Digital Polaris Forge 2 Campus vcc- | oldest_ | 2026-07-27 → 2026-10-07 |
| sites | Soluna Project Kati Campus (Willacy County) vcc- | project_ | 1 → 2 |
| sites | Soluna Project Kati Campus (Willacy County) vcc- | project_ | JSON value changed (see the CSV files of both snapshots) |
| sites | Soluna Project Kati Campus (Willacy County) vcc- | project_ | JSON value changed (see the CSV files of both snapshots) |
| sites | Soluna Project Kati Campus (Willacy County) vcc- | statuses_ | JSON value changed (see the CSV files of both snapshots) |
| sites | Soluna Project Kati Campus (Willacy County) vcc- | oldest_ | 2026-10-07 → 2026-09-08 |
| sites | Soluna Project Kati Campus (Willacy County) vcc- | verification_ | authoritative_project_record_plus_scoped_location → mixed_review_postures |
| sites | Telehouse London Docklands Campus (Docklands Technical Centres) vcc- | project_ | 1 → 2 |
| sites | Telehouse London Docklands Campus (Docklands Technical Centres) vcc- | project_ | JSON value changed (see the CSV files of both snapshots) |
| sites | Telehouse London Docklands Campus (Docklands Technical Centres) vcc- | project_ | JSON value changed (see the CSV files of both snapshots) |
| sites | Telehouse London Docklands Campus (Docklands Technical Centres) vcc- | statuses_ | JSON value changed (see the CSV files of both snapshots) |
| sites | Telehouse London Docklands Campus (Docklands Technical Centres) vcc- | newest_ | 2026-07-28 → 2026-09-22 |
| sites | Telehouse London Docklands Campus (Docklands Technical Centres) vcc- | verification_ | authoritative_physical_observation_plus_reviewed_site_locator → mixed_review_postures |
| sites | Boda Shenzhen Qianhai No. 1 Intelligent Computing Campus vcc- | oldest_ | 2026-08-26 → 2026-09-17 |
| sites | Boda Shenzhen Qianhai No. 1 Intelligent Computing Campus vcc- | newest_ | 2026-08-26 → 2026-09-17 |
| sites | CyrusOne Aurora Diehl Road Campus vcc- | statuses_ | JSON value changed (see the CSV files of both snapshots) |
| sites | CyrusOne Aurora Diehl Road Campus vcc- | oldest_ | 2026-08-20 → 2026-10-09 |
| sites | CyrusOne Aurora Diehl Road Campus vcc- | newest_ | 2026-08-20 → 2026-10-09 |
| sites | Meta Eagle Mountain Data Center vcc- | project_ | 1 → 2 |
| sites | Meta Eagle Mountain Data Center vcc- | project_ | JSON value changed (see the CSV files of both snapshots) |
| sites | Meta Eagle Mountain Data Center vcc- | project_ | JSON value changed (see the CSV files of both snapshots) |
| sites | Meta Eagle Mountain Data Center vcc- | statuses_ | JSON value changed (see the CSV files of both snapshots) |
| sites | Meta Eagle Mountain Data Center vcc- | verification_ | authoritative_physical_observation_plus_reviewed_site_locator → mixed_review_postures |
| sites | Google Cerrillos Data Center vcc- | oldest_ | 2026-07-29 → 2026-10-16 |
| sites | Google Cerrillos Data Center vcc- | newest_ | 2026-07-29 → 2026-10-16 |
| sites | DVZ Schwerin Lübecker Straße Campus vcc- | statuses_ | JSON value changed (see the CSV files of both snapshots) |
| sites | DVZ Schwerin Lübecker Straße Campus vcc- | oldest_ | 2026-07-31 → 2026-09-15 |
| sites | DVZ Schwerin Lübecker Straße Campus vcc- | newest_ | 2026-07-31 → 2026-09-15 |
| sites | Microsoft Mount Pleasant Datacenter Campus vcc- | newest_ | 2026-06-23 → 2026-09-28 |
| projects | Telehouse Docklands Existing Operations (North, North Two, East, West and South) 008b38ef- | status_ | 83 → 86 |
| projects | Ezditek RUH01 Phase 1 Current Build 010c4071- | status_ | 123 → 126 |
| projects | DataVolt Oxagon AI data centre campus (NEOM) 016877e7- | status_ | 42 → 45 |
| projects | Digital Realty 330 E. Cermak Current Facility Build 01baa3bb- | status_ | 92 → 95 |
| projects | JERA / RHAELM Chiba AI Data Center Infrastructure 02a9ee88- | status_ | 18 → 21 |
| projects | STT Tokyo 1 Existing Operations 0315dd21- | status_ | 59 → 62 |
| projects | New Hill Digital Campus 03207f8c- | status_ | 223 → 226 |
| projects | Google Horndal Data Center — first facility 038be51b- | status_ | 19 → 22 |
| projects | Google Waltham Cross data centre 03b5fd0f- | status_ | 398 → 401 |
| projects | Keppel DC SGP 9 Current Build 04b22725- | status_ | 81 → 84 |
| projects | noris network FRA1 Schwalbach Current Build 05033935- | status_ | 131 → 134 |
| projects | Daou Jukjeon CDC Current Build 057826b7- | status_ | 66 → 69 |
| projects | China Unicom Tianjin Jing-Jin-Ji Park South Zone DC1 / DC2 066110dc- | status_ | 40 → 43 |
| projects | AWS Vicksburg data center campus 077a5970- | status_ | 193 → 196 |
| projects | Colt Paris 2 Current Facility Build 08d881e7- | status_ | 92 → 95 |
| projects | Google West Memphis data center campus 09904943- | status_ | 235 → 238 |
| projects | Green Mountain Undheim Current Two-Building Development 0a075c8d- | status_ | 91 → 94 |
| projects | Google / Beale Tulsa County Project Clydesdale Campus Construction 0a4a2c40- | status_ | 61 → 64 |
| projects | Raxio UG1 Namanve — operating facility 0b2a5bf9- | status_ | 74 → 77 |
| projects | Bell AI Fabric Sherwood campus (Regina area) 0b37ac4d- | status_ | 18 → 21 |
| projects | Chirisa Chesterfield Digital Drive Current Build 0b67b532- | status_ | 110 → 113 |
| projects | Colt London 4 Current Facility Build 0bac3fe4- | status_ | 92 → 95 |
| projects | Iron Mountain NJE-1 Expansion 0bf81b53- | status_ | 111 → 114 |
| projects | Mirai Ogaki Data Center Campus Existing Operations 0c37f689- | status_ | 20 → 23 |
| projects | Chief Telecom LY2 AI Data Center — current operations 0cd17299- | status_ | 74 → 77 |
| projects | Pure DC Brent Cross LON01 B2 Composite Build 0cdff49d- | status_ | 47 → 50 |
| projects | Digital Realty ZUR4 — new data center build 0cf81d42- | status_ | 53 → 56 |
| projects | CtrlS Chandanvelly AI-ready data center park 0d416a87- | status_ | 634 → 637 |
| projects | TCS HyperVault AI data center campus, Bharat Future City (Hyderabad) 0d75be4c- | status_ | 40 → 43 |
| projects | China Telecom GBA Integrated Data Center, Zhenjiang Park — Phase 2.1 A7 Intelligent Computing Centre 0dae92e0- | status_ | 87 → 90 |
| projects | Applied Digital Polaris Forge 3 0eb54c2e- | status_ | 12 → 15 |
| projects | MC Digital Realty KIX15 — new data center build 0ee1555f- | status_ | 12 → 15 |
| projects | Microsoft Fairwater AI datacenter, Mount Pleasant 0f5f4fcc- | status_ | 118 → 121 |
| projects | OMNIA Pecém Initial Data Center Construction 0fd5e6a4- | status_ | 125 → 128 |
| projects | AI Tech Tomakomai Phase I Foundation Works 100cf064- | status_ | 122 → 125 |
| projects | Raiden Infotech Turbhe MIDC Data Centre EC 531703 Current Build 118053c0- | status_ | 77 → 80 |
| projects | Polaris Forge 2 Current Construction 12407b2e- | status_ | 2026-07-27 → 2026-10-07 |
| projects | Polaris Forge 2 Current Construction 12407b2e- | status_ | 84 → 15 |
| projects | Polaris Forge 2 Current Construction 12407b2e- | status_ | 8407e7ee-8aad-57dc-a470-545c98e883eb → 8c290350-076d-5c64-8b1f-ce755a3496c8 |
| projects | Polaris Forge 2 Current Construction 12407b2e- | status_ | https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-f… → https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-r… |
| projects | Vantage Frontier campus (Stargate Shackelford County) 126f2c37- | status_ | 41 → 44 |
| projects | Meta Talavera de la Reina data center campus 1369aebb- | status_ | 52 → 55 |
| projects | Meta Richland Parish Current Development 1404f5cd- | status_ | 95 → 98 |
| projects | DigiCo SYD1 Ultimo Expansion Early Works 14a67880- | status_ | 61 → 64 |
| projects | Green IT Aragón data center campus (SAMCA), Luceni 15360f72- | status_ | 14 → 17 |
| projects | Data Center La Pólvora — initial proposal 15447405- | status_ | 2026-07-30 → 2026-10-16 |
| projects | Data Center La Pólvora — initial proposal 15447405- | status_ | 81 → 6 |
| projects | Data Center La Pólvora — initial proposal 15447405- | status_ | c6eafadb-8561-51c8-b95f-02ca3a6fbeed → 0a632710-210a-52f2-8e95-8a3b3978f66b |
| projects | Data Center La Pólvora — initial proposal 15447405- | status_ | https://infofirma.sea.gob.cl/DocumentosSEA/MostrarDocumento?docId=2026/07/30/4984-cbee-46bd-816a-cfd384a6bbbf → https://firma.sea.gob.cl/publicaciones/2026/10/16/1792182726_85F93156-E82C-4A34-B84A-3D1BC611BA0B |
| projects | EDS IST 01 Tuzla Initial Build 15e0ef92- | status_ | 68 → 71 |
| projects | CDC Marsden Park Early Construction 164033cb- | status_ | 90 → 93 |
| projects | STACK DFW02B 1729ba44- | status_ | 14 → 17 |
| projects | Microsoft Alviso Phase 2 Greenfield Development 1861d9fb- | status_ | 131 → 134 |
| projects | La Osa Energy Center (Vermaland), Pinal County 18844ee0- | status_ | 54 → 57 |
| projects | Sabey Indianapolis Decatur Township Data Center Campus — proposed campus 1a1900a7- | status_ | 53 → 56 |
| projects | Google Stillwater data center campus 1b7d1694- | status_ | 10 → 13 |
| projects | China Unicom GBA Data Standard Factory — Data Centre 5 1c6c1ab3- | status_ | 66 → 69 |
| projects | Nabiax Alcalá Data Center 3 (ADC3) 1c809265- | status_ | 31 → 34 |
| projects | EDS IST 02 Gebze First Phase 1c9fa996- | status_ | 66 → 69 |
| projects | Telia New Vilnius Data Center 1cae5b48- | status_ | 111 → 114 |
| projects | Kao Data Park Royal Revised Data Centre Development 1cc64264- | status_ | 90 → 93 |
| projects | SUNeVision MEGA IDC — Phase One (Tower A) operations 1e18ab2f- | status_ | 48 → 51 |
| projects | IIJ Shiroi DCC Phase 3 Server Building 1f33fed8- | status_ | 116 → 119 |
| projects | atNorth FIN05 Salo mega site 1f415639- | status_ | 14 → 17 |
| projects | Meta Lebanon Indiana Current Development 1f430ea1- | status_ | 105 → 108 |
| projects | HIVE Yguazú 2026 Campus Electrical-Infrastructure Expansion 20a32e9d- | status_ | 66 → 69 |
| projects | Polaris Forge 1 Current Expansion 20ee1eea- | status_ | 2026-07-27 → 2026-10-07 |
| projects | Polaris Forge 1 Current Expansion 20ee1eea- | status_ | 84 → 15 |
| projects | Polaris Forge 1 Current Expansion 20ee1eea- | status_ | 4ff2d650-43ba-552e-b12b-690706c23b58 → 8c290350-076d-5c64-8b1f-ce755a3496c8 |
| projects | Polaris Forge 1 Current Expansion 20ee1eea- | status_ | https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-f… → https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-r… |
| projects | Ishikari Renewable Energy Data Center No.1 24294ce0- | status_ | 2026-08-01 → 2026-10-07 |
| projects | Ishikari Renewable Energy Data Center No.1 24294ce0- | status_ | 79 → 15 |
| projects | Ishikari Renewable Energy Data Center No.1 24294ce0- | status_ | c23633b0-7b78-5552-8b66-c7dbcf83c25b → bf2b1182-9a35-55b3-85d6-2cda68f451d5 |
| projects | Ishikari Renewable Energy Data Center No.1 24294ce0- | status_ | https://prtimes.jp/main/html/rd/p/000000015.000119810.html → https://www.tokyu-land.co.jp/news/uploads/de31407ba35ed4198e06a2b9c5ada8a383c99515.pdf |
| projects | Shaanxi Xueqian Normal University — Chang’an Data Centre Room Renovation 247e2a4e- | status_ | 40 → 43 |
| projects | Iron Mountain MIA-1 Build 24911fb6- | status_ | 111 → 114 |
| projects | NAVER GAK Sejong AI Factory (NVIDIA DSX, NAVER/Brookfield/NVIDIA) 253bd505- | status_ | 87 → 90 |
| projects | Microsoft San Bovio Initial Development 257f3255- | status_ | 110 → 113 |
| projects | Honeman Close Data Centre — approved 140 MW Microsoft data centre 26667c0d- | status_ | 18 → 21 |
| projects | Colovore Hutto Data Center — planned building 26d74e69- | status_ | 47 → 50 |
| projects | Aligned Conesville Current Site Preparation 26ebe837- | status_ | 110 → 113 |
| projects | Riot Platforms Corsicana facility 27338e9f- | status_ | 70 → 73 |
| projects | Google Cedar Rapids data center campus (Big Cedar Industrial Center) 27c38b34- | status_ | 14 → 17 |
| projects | Microsoft Vaughan YTO11 — first building construction 288845bc- | status_ | 75 → 78 |
| projects | CtrlS Kolkata-DC1 (first phase) 289f7324- | status_ | 3 → 6 |
| projects | atNorth DEN02 Varde mega site 297b1705- | status_ | 69 → 72 |
| projects | Riot Platforms Rockdale data center campus 298d7152- | status_ | 70 → 73 |
| projects | Tillion Aragón data center campus (Azora), Villamayor de Gállego 2a273a46- | status_ | 14 → 17 |
| projects | Herbata data centre campus (Naas) 2a418e82- | status_ | 10 → 13 |
| projects | Compass Datacenters Meridian campus 2b520cfa- | status_ | 10 → 13 |
| projects | QTS Cambois Data Centre Campus 2bd78b04- | status_ | 74 → 77 |
| projects | Bridge Data Centres MY07, Ulu Tiram 2c24f89f- | status_ | 47 → 50 |
| projects | Bulk N01 Current New Facility Construction 2c3a5bbe- | status_ | 111 → 114 |
| projects | Ascenty Vinhedo 3 2cac8eb7- | status_ | 144 → 147 |
| projects | AWS Clinton data center (former Delphi plant) 2cb7333c- | status_ | 132 → 135 |
| projects | YTL Green Data Center Park, Kulai 2d2dbfa9- | status_ | 60 → 63 |
| projects | TeraWulf Lake Hawkeye data campus 2e14f098- | status_ | 75 → 78 |
| projects | CDC Eastern Creek EC5 Current Build 2e2b9d40- | status_ | 90 → 93 |
| projects | Galaxy Helios Phase II 260 MW Critical IT Build 2f422325- | status_ | 68 → 71 |
| projects | Meta Temple Data Center 2fc433ea- | status_ | 89 → 92 |
| projects | OpenAI Project Camellia — planned AI data-centre campus 3013a6c3- | status_ | 89 → 92 |
| projects | Meta Tulsa data center 302bc1de- | status_ | 10 → 13 |
| projects | EcoDataCenter 2 Borlänge campus 304e9b81- | status_ | 14 → 17 |
| projects | Related Digital Cheyenne Phase 1 31635fdf- | status_ | 91 → 94 |
| projects | Stargate Milam County (SB Energy campus) 316e6c68- | status_ | 185 → 188 |
| projects | Crusoe Abilene AI factory campus for Microsoft 31ee01b0- | status_ | 96 → 99 |
| projects | Applied Digital Polaris Forge 1 32b98d7e- | status_ | 12 → 15 |
| projects | Meta Kansas City data center 3315c754- | status_ | 425 → 428 |
| projects | Meta El Paso Current Development 337ace90- | status_ | 83 → 86 |
| projects | AirTrunk Kurri Kurri Data Centre 33a0110e- | status_ | 5 → 8 |
| projects | KIO Data Centers QRO3, Querétaro 352e29e6- | status_ | 63 → 66 |
| projects | CoreWeave Kenilworth NEST 11 AI data center 35995588- | status_ | 10 → 13 |
| projects | Telecom Egypt Regional Data Hub 2 35c427dc- | status_ | 131 → 134 |
| projects | Amazon and STACK campus at Resilient Technology Park, Shreveport 3641032c- | status_ | 53 → 56 |
| projects | Data World Matatirtha Core Data Center Current Build 36ac2490- | status_ | 110 → 113 |
| projects | NEXTDC S4 Initial Development 3761e59a- | status_ | 111 → 114 |
| projects | Firmus Bell Bay (Long Reach) AI Factory - DA 2026/29 data centre 377ed501- | status_ | 55 → 58 |
| projects | AVAIO Digital Taurus Phase One Current Campus Build 37e33657- | status_ | 91 → 94 |
| projects | Ten Brinke Spata Data Center Active Construction 38033ec9- | status_ | 90 → 93 |
| projects | Glendenning Road Data Centre — approved three-building 235 MW campus 382aa8ea- | status_ | 35 → 38 |
| projects | Khazna QAJ1 AI data center (Ajman) 384a401d- | status_ | 370 → 373 |
| projects | Pure DC / SEGRO Park Royal LON02 Data Centre 387dc6b8- | status_ | 12 → 15 |
| projects | Nebius Vineland AI factory 38cbdb58- | status_ | 10 → 13 |
| projects | maincubes BER02 3941c42e- | status_ | 92 → 95 |
| projects | AWS Lake Anna Technology Campus 39753efd- | status_ | 217 → 220 |
| projects | IREN Kiowa data center campus 39b97d53- | status_ | 41 → 44 |
| projects | Pennsylvania Digital I (PAX-1), Middlesex Township 39dca169- | status_ | 228 → 231 |
| projects | QTS and Lancium Hall County data center campus 39eada86- | status_ | 98 → 101 |
| projects | Start Campus SINES data center campus 3a54ff50- | status_ | 77 → 80 |
| projects | KAGOYA Japan Keihanna Lab Existing Operations 3a5eff63- | status_ | 25 → 28 |
| projects | Vantage Lighthouse Port Washington Current Campus Build 3b636397- | status_ | 52 → 55 |
| projects | Soluna Project Kati 2 AI data center (MFE-A-Kati2 Building 1) 3c42e80a- | status_ | 12 → 15 |
| projects | Hut 8 River Bend 245 MW Critical IT Current Build 3e074273- | status_ | 76 → 79 |
| projects | AWS Richmond County data center campus 3e853975- | status_ | 26 → 29 |
| projects | Habilitación Data Center Alto Jahuel 3e912a87- | status_ | 87 → 90 |
| projects | Tract Buckeye data center park 3f13d78d- | status_ | 126 → 129 |
| projects | Terranova Praia Grande data center campus (proposed) 3fc18374- | status_ | 55 → 58 |
| projects | AirTrunk TOK1 Tokyo East 3fe8297a- | status_ | 223 → 226 |
| projects | SCSK netXDC Chiba No.3 (SI3) 400c245c- | status_ | 18 → 21 |
| projects | QTS Eemshaven data center campus 409466ac- | status_ | 10 → 13 |
| projects | Igoudar Dakhla green data centre complex 40a718e2- | status_ | 186 → 189 |
| projects | Core Scientific Hunt County data center site 40abc164- | status_ | 83 → 86 |
| projects | Tongji University Siping East Campus — A-building Data-Centre Fit-out 4195ab55- | status_ | 5 → 8 |
| projects | Khazna Data Centers Dammam campus 41ec9844- | status_ | 314 → 317 |
| projects | Boda Langfang No. 2 Phase 2 41f90b54- | status_ | 10 → 13 |
| projects | Stargate UAE / UAE-US AI Campus 4278fea3- | status_ | 67 → 70 |
| projects | Microsoft Silver Springs Datacenter — current campus build 427dfd4b- | status_ | 20 → 23 |
| projects | Princeton Digital Group JC4 Greater Jakarta 42ae14a5- | status_ | 172 → 175 |
| projects | STT Jakarta 5 42e50e84- | status_ | 131 → 134 |
| projects | MERLIN Lisbon Phase II Two-Building Development 43ded2e8- | status_ | 84 → 87 |
| projects | EdgeCore Mesa data center campus 441174d1- | status_ | 516 → 519 |
| projects | Akashi Astana Phase 1 Current Build 44130f9f- | status_ | 25 → 28 |
| projects | Goodman LAX01 First-Site Current Development 447b19d9- | status_ | 111 → 114 |
| projects | QTS Calatorao data center campus 46434a5c- | status_ | 2025-08-27 → 2026-09-30 |
| projects | QTS Calatorao data center campus 46434a5c- | status_ | 418 → 22 |
| projects | QTS Calatorao data center campus 46434a5c- | status_ | imported_documented_status → authoritative_project_announcement |
| projects | QTS Calatorao data center campus 46434a5c- | status_ | 078ea19d-9af1-51c4-938d-74a15d90c5e2 → ea820b0c-c502-5dc0-94a7-d6e5bf2faa14 |
| projects | QTS Calatorao data center campus 46434a5c- | verification_ | imported_source_record → authoritative_project_record_plus_scoped_location |
| projects | QTS Calatorao data center campus 46434a5c- | status_ | https://www.eldiario.es/aragon/politica/explosion-centros-datos-aragon-opacidad-choque-institucional-riesgo-colapso_1_1… → https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1468143560505 |
| projects | Box2Bit Epilon data center campus (Épila) 46abd4bf- | status_ | 126 → 129 |
| projects | 400 South LaSalle office-to-data-center conversion (Phases 1–3) 46cf0678- | status_ | 33 → 36 |
| projects | Red Admiral data centre campus, Rochfortbridge 48458229- | status_ | 10 → 13 |
| projects | Bitdeer Wenatchee 2026 AI Conversion Site Preparation 484cf452- | status_ | 90 → 93 |
| projects | PowerHouse 95 data center campus 48d82a4f- | status_ | 10 → 13 |
| projects | AdaniConneX Pune PNQ04 Current Build 48eb54d5- | status_ | 140 → 143 |
| projects | Sakura Ishikari Data Center Existing Operations 490119c4- | status_ | 83 → 86 |
| projects | xAI MACROHARDRR data center (Southaven) 493361d4- | status_ | 80 → 83 |
| projects | Synapse Data Center (Olds) 4a0d8f6f- | status_ | 10 → 13 |
| projects | Project Sail (Prologis data center campus, Coweta County) 4a2847d7- | status_ | 193 → 196 |
| projects | Rowan Project Temple 4a2a09d1- | status_ | 143 → 146 |
| projects | Alto Infrastructure SP01 Phase 1 10 MW Critical IT 4a934222- | status_ | 102 → 105 |
| projects | PW Digital Gateway 4ac7a0d0- | status_ | 107 → 110 |
| projects | firstcolo FRA7 Current Build 4afd2551- | status_ | 126 → 129 |
| projects | BDx HKG8 — operating hyperscale data center 4c1f4c7f- | status_ | 39 → 42 |
| projects | Project Apollo Data Centre Macquarie Park — approved 135 MW data centre 4e3f10ad- | status_ | 47 → 50 |
| projects | Scala Data Centers Tamboré Campus 4ea35229- | status_ | 354 → 357 |
| projects | WBS Power Baltic Data Center Campus, Lublewo 4eea4b6a- | status_ | 209 → 212 |
| projects | Green Mountain FRA-Mainz Current Three-Building Development 4eeb97fa- | status_ | 90 → 93 |
| projects | Niger National Data Center PK5 Current Build 4f39070f- | status_ | 123 → 126 |
| projects | Goodman FRA02 Phase 1 Current Development 4f86e285- | status_ | 111 → 114 |
| projects | HUMAIN Al-Saad hyperscale AI data centre campus 4f8a32cf- | status_ | 22 → 25 |
| projects | Wingu Africa Mbezi Data Centre — operating facility 4f99e7c8- | status_ | 68 → 71 |
| projects | Datum FRN2 Data Centre Building 50d0a2d0- | status_ | 12 → 15 |
| projects | OME Data Center07 / DC5 Building B 510a8216- | status_ | 34 → 37 |
| projects | NTT Global Data Centers Tokyo TKY12 campus, Shiroi 511bfd88- | status_ | 180 → 183 |
| projects | Rio AI City (Elea Data Centers) 51f3ec57- | status_ | 10 → 13 |
| projects | Africa Data Centres JHB1 Midrand — operating facility 52003baa- | status_ | 91 → 94 |
| projects | ACF CR4 extension 52b09d3a- | status_ | 27 → 30 |
| projects | Dansk Data Center 1 Current Build 52d209cc- | status_ | 67 → 70 |
| projects | Google Kansas City data center campus (Hunt Midwest Business Center) 52e21086- | status_ | 10 → 13 |
| projects | SoftBank-Sesterce Bosquel AI data center 53a18106- | status_ | 140 → 143 |
| projects | Data Center Lo Aguirre — initial proposal 5419b282- | status_ | 24 → 27 |
| projects | Delska LV DC4 Riga — proposed new data-centre building 543c1171- | status_ | 25 → 28 |
| projects | dataR Rellingen Current Construction 5443b4c1- | status_ | 94 → 97 |
| projects | DataBank Red Oak First-Phase Current Construction 546bf83f- | status_ | 85 → 88 |
| projects | Deutsche Telekom Industrial AI Cloud, Munich Tucherpark 54782d37- | status_ | 257 → 260 |
| projects | Jiujiang University — Danfengyuan Campus Data Centre 559170a8- | status_ | 19 → 22 |
| projects | HUMAIN Dammam AI data centre 55a2bfbb- | status_ | 419 → 422 |
| projects | Microsoft Middenmeer Campus West expansion (Agriport Plot B) 55df6642- | status_ | 208 → 211 |
| projects | AWS Walqa Current Data Center Build 55f4eb88- | status_ | 116 → 119 |
| projects | Microsoft Union City data center campus (EdgeConneX) 561d28db- | status_ | 74 → 77 |
| projects | Green Campus ZRH1 Data Center 4 58129708- | status_ | 91 → 94 |
| projects | CyrusOne FRA7 Current Multi-Building Development 58f9a985- | status_ | 129 → 132 |
| projects | Teraco CT1 Rondebosch Expansion 59a74e45- | status_ | 94 → 97 |
| projects | DataOne Vineland Phase 2 Expansion Current Build 5ace12f8- | status_ | 73 → 76 |
| projects | Skygard OSL1 Phase 2 5ae9f639- | status_ | 125 → 128 |
| projects | QTS Cambois 2026 Earthworks 5b11c034- | status_ | 110 → 113 |
| projects | Ascenty Sumaré 3 5b52a118- | status_ | 144 → 147 |
| projects | QTS York County Initial-Phase Building 1 5b758548- | status_ | 111 → 114 |
| projects | CSC LUMI-AI Data Center Current Build 5bfb4ad8- | status_ | 46 → 49 |
| projects | CDC Eastern Creek EC6 Current Build 5c366d64- | status_ | 90 → 93 |
| projects | Applied Digital Polaris Forge 2 5c691ba6- | status_ | 12 → 15 |
| projects | Boda Qianhai No. 1 Operating Campus 5ce2d8b1- | status_ | 2026-08-26 → 2026-09-17 |
| projects | Boda Qianhai No. 1 Operating Campus 5ce2d8b1- | status_ | 54 → 35 |
| projects | Boda Qianhai No. 1 Operating Campus 5ce2d8b1- | status_ | dd5acdf6-4107-52ec-9458-1c36ee37c34c → 9e333121-1195-5780-9460-0267cc6bed30 |
| projects | Boda Qianhai No. 1 Operating Campus 5ce2d8b1- | status_ | https://www.bodadata.com/xwzx/912.html → https://www.bodadata.com/xwzx/924.html |
| projects | Eni and Khazna AI data center campus, Ferrera Erbognone 5d11dbb6- | status_ | 70 → 73 |
| projects | LEITWERK BADEN CLOUD Lahr Data Center Current Build 5e0d1954- | status_ | 122 → 125 |
| projects | China Mobile GBA (Shaoguan) Data Center — C/D buildings (Phase 2) 5e52d4ca- | status_ | 19 → 22 |
| projects | Bitdeer Fox Creek energy and computing facility 602d4e58- | status_ | 70 → 73 |
| projects | AWS Thane Balkum & Majiwada Data Centre EC 477127 Current Build 60485ece- | status_ | 145 → 148 |
| projects | Meta Bowling Green data center 619c5358- | status_ | 10 → 13 |
| projects | DayOne Kouvola Koria Data Center — current build 61b29115- | status_ | 29 → 32 |
| projects | STT Jaipur 1 63159cf3- | status_ | 89 → 92 |
| projects | Stargate Abilene (Crusoe campus on Lancium land) 632aad8a- | status_ | 14 → 17 |
| projects | Microsoft Kirkkonummi First Datacenter Building 64289119- | status_ | 115 → 118 |
| projects | SK AI Data Center Ulsan 64f6ec20- | status_ | 35 → 38 |
| projects | CoreSite DE3 65e8849e- | status_ | 91 → 94 |
| projects | Microsoft Zaragoza (Puerto Venecia) datacenter campus 6788c655- | status_ | 45 → 48 |
| projects | Bitdeer Clarington data center site 6799aac4- | status_ | 70 → 73 |
| projects | NEXTDC S7 Sydney 688df4a2- | status_ | 49 → 52 |
| projects | Nanjing University of Information Science and Technology — Changwang Building Data Centre 69dcda22- | status_ | 31 → 34 |
| projects | Range Hong Kong Sandy Ridge Campus Current Infrastructure Build 6a3cb870- | status_ | 111 → 114 |
| projects | Kai Shin Satsumasendai AI Data Center — commercial campus 6a7d396b- | status_ | 93 → 96 |
| projects | Enecom Hiroshima Data Center Existing Operations 6a90d22d- | status_ | 18 → 21 |
| projects | Brookfield AI center, Strängnäs 6aa46e28- | status_ | 502 → 505 |
| projects | Lake Mariner CB-5 Current Build 6b11de63- | status_ | 75 → 78 |
| projects | EdgeCore AS02 Data Center 6b62c459- | status_ | 110 → 113 |
| projects | Yondr Hornbaker Road Campus — proposed 72 MW campus 6d108e80- | status_ | 77 → 80 |
| projects | Highreso Kagawa Takamatsu Existing Operations 6daf7e34- | status_ | 25 → 28 |
| projects | DayOne KTP Data Center Campus — in-service capacity 6e2e8be0- | status_ | 29 → 32 |
| projects | Data Center Alto Jahuel Campus Sur — initial data centre 6e51233c- | status_ | 20 → 23 |
| projects | Oracle Project Jupiter Doña Ana County Current Campus Build 6f0acd88- | status_ | 6 → 9 |
| projects | Kobe Former Conveyor Tunnel Data Center Initial Development 6f5f4bba- | status_ | 13 → 16 |
| projects | Core Scientific Pecos Initial HDC Current Build 709cd37b- | status_ | 139 → 142 |
| projects | Project Pluto Data Centre — approved 100 MW data centre 70a1552d- | status_ | 88 → 91 |
| projects | Crusoe and Lancium Childress AI data center campus 715ba9aa- | status_ | 96 → 99 |
| projects | KAO Data KLON-03 Data Centre Building 7206a400- | status_ | 146 → 149 |
| projects | Goodman HKG10 Current Redevelopment 726d6e35- | status_ | 34 → 37 |
| projects | Colt Frankfurt 3 Current Facility Build 7352e9b5- | status_ | 92 → 95 |
| projects | Microsoft Pecos datacenter campus 735e570e- | status_ | 109 → 112 |
| projects | PBOC Shanghai Same-City Data Centre — Jindianyun Retrofit 74c7be7b- | status_ | 9 → 12 |
| projects | Prometheus Hyperscale Evanston campus 74d6b0be- | status_ | 119 → 122 |
| projects | Ubitus Maizuru AI Data Center Development 75484d01- | status_ | 40 → 43 |
| projects | SoftBank Osaka Sakai AI data center 75596cc6- | status_ | 118 → 121 |
| projects | Bridge Data Centres Chonburi hyperscale campus 755ec57c- | status_ | 363 → 366 |
| projects | Boda Langfang No. 2 Phase 1 760bbd20- | status_ | 90 → 93 |
| projects | RIKEN Fugaku NEXT New Computer Building 760ff149- | status_ | 6 → 9 |
| projects | Monarch Point Pleasant Current Site Preparation 762397cd- | status_ | 97 → 100 |
| projects | atNorth SWE04 Sollefteå mega site 77b8badc- | status_ | 125 → 128 |
| projects | Vantage Data Centers Johor campus (JHB1), Sedenak Tech Park 77f10b6a- | status_ | 10 → 13 |
| projects | CyrusOne Bosque County data center campus (Thad Hill) 79276528- | status_ | 350 → 353 |
| projects | Crusoe and Tallgrass AI data center campus near Cheyenne (Project Jade) 7a05f519- | status_ | 452 → 455 |
| projects | TeraWulf Muskie Data Campus 7a5658df- | status_ | 14 → 17 |
| projects | KDDI Osaka Sakai Existing Operations 7a9f2968- | status_ | 83 → 86 |
| projects | MERLIN Edged Bilbao-Arasur Building 2 Current Build 7ac977cb- | status_ | 111 → 114 |
| projects | Centro de Almacenamiento de Datos San Antonio — four-building campus proposal 7b2b3bc2- | status_ | 21 → 24 |
| projects | OME Data Center04 Shinmachi9-A Building 7b86e3a5- | status_ | 96 → 99 |
| projects | QTS Fayetteville campus 7c43c342- | status_ | 332 → 335 |
| projects | Microsoft Mount Pleasant Durand Avenue datacenter campus 7c5eed16- | status_ | 110 → 113 |
| projects | atNorth FIN04 Phase 1 7c7b8437- | status_ | 2026-07-21 → 2026-09-23 |
| projects | atNorth FIN04 Phase 1 7c7b8437- | status_ | 90 → 29 |
| projects | atNorth FIN04 Phase 1 7c7b8437- | status_ | a49b85ce-f91a-56b8-af06-3b663336bdf8 → 08ce9af9-4e11-5e9f-bf11-8d986773cc72 |
| projects | atNorth FIN04 Phase 1 7c7b8437- | status_ | https://www.yitgroup.com/en/news-repository/investor-news/yit-and-atnorth-agree-on-construction-of-a-data-center-in-kou… → https://paikkatiedot.ymparisto.fi/geoserver/ryhti_permit/ogc/features/v1/collections/open_permit_building/items?f=appli… |
| projects | Google Fort Wayne data center 7c9397d2- | status_ | 10 → 13 |
| projects | Homer City Energy Campus 7d6333d2- | status_ | 45 → 48 |
| projects | The Barn Stargate Current Data Center Build 7d936c4e- | status_ | 21 → 24 |
| projects | Meta Richland Parish data center (Hyperion) 803e9da5- | status_ | 97 → 100 |
| projects | TBC Partners Cambois data centre campus 81d20134- | status_ | 62 → 65 |
| projects | Iron Mountain LON-3 25 MW Build 825dd9ee- | status_ | 111 → 114 |
| projects | Mega D.C. MDCIL-1 Modi'in Phase B Current Build 82f20665- | status_ | 111 → 114 |
| projects | Data Center Polpaico Campus Norte — initial data centre 83a943e6- | status_ | 32 → 35 |
| projects | CDC Brooklyn Remaining Facilities Current Build 83efe2e8- | status_ | 90 → 93 |
| projects | CapitaLand DC Navi Mumbai Tower 1 847e667c- | status_ | 82 → 85 |
| projects | IIJ Matsue Existing Operations 853ee693- | status_ | 73 → 76 |
| projects | EdgeCore Louisa County campus 8560b48f- | status_ | 10 → 13 |
| projects | Haoyang Langfang No. 1 Existing Operations 85adb51e- | status_ | 67 → 70 |
| projects | Edged Council Bluffs First Data Center 85cb6e56- | status_ | 38 → 41 |
| projects | TSUBAME4 G4-A Data Center Existing Operations 85eabbee- | status_ | 20 → 23 |
| projects | Microsoft L’Ancienne-Lorette Development Project 867d91cb- | status_ | 133 → 136 |
| projects | NEXTDC M4 Melbourne 869dffc7- | status_ | 273 → 276 |
| projects | Microsoft Hebron Initial Site Preparation 86bcbcd1- | status_ | 110 → 113 |
| projects | Hut 8 Beacon Point AI data center campus 86c83f59- | status_ | 76 → 79 |
| projects | NEXTDC M4 Initial Early Works 8715738f- | status_ | 111 → 114 |
| projects | Aker Nscale Korgen AI data center 88c15bf1- | status_ | 357 → 360 |
| projects | Google Franklin Township data center proposal (Project Flo) 892af381- | status_ | 392 → 395 |
| projects | envia TEL Leipzig2 Fourth Section Current Construction 898b0895- | status_ | 145 → 148 |
| projects | NEXTDC S3 Incremental In-Progress Fit-Out 8a5fbd17- | status_ | 111 → 114 |
| projects | Hut 8 River Bend AI data center campus 8aa8e9f5- | status_ | 14 → 17 |
| projects | Morris Technology Park 8ac449d0- | status_ | 265 → 268 |
| projects | AdaniConneX Noida data centre campus 8c2ed321- | status_ | 10 → 13 |
| projects | Flexential Douglasville 2 Current Build 8c926b8f- | status_ | 62 → 65 |
| projects | CEC Tokyo No.2 Existing Operations at Sunshine 60 8cb9ee0d- | status_ | 75 → 78 |
| projects | Core Scientific Pecos data center campus 8ce04eb2- | status_ | 83 → 86 |
| projects | Amazon Web Services Hobart data center campus 8d08b021- | status_ | 55 → 58 |
| projects | Nscale Kvandal AI data center (Narvik) 8d1ed9d7- | status_ | 47 → 50 |
| projects | Meta Mesa Data Center 8d3985c2- | status_ | 626 → 629 |
| projects | Flexential Parker Data Center Current Build 8dbc82d0- | status_ | 62 → 65 |
| projects | Taylor Technology Campus (Big Watt Digital and PowerHouse) 8e72e640- | status_ | 10 → 13 |
| projects | CloudHQ GRU Campus (Paulínia) 8efbf742- | status_ | 194 → 197 |
| projects | Lübbenau Data Center Current Build 8f5c2434- | status_ | 62 → 65 |
| projects | Verne Mäntsälä Current Campus Development 8f8c241d- | status_ | 124 → 127 |
| projects | Cipher Barber Lake data center 8fc14c03- | status_ | 24 → 27 |
| projects | xAI Colossus 2 (Memphis) 9002afae- | status_ | 14 → 17 |
| projects | Balico gas-powered data center campus, Pittsylvania County 908ba9ce- | status_ | 551 → 554 |
| projects | Hexagon Data Center (Riyadh) 912a1942- | status_ | 171 → 174 |
| projects | Raxio AO1 Cacuaco — operating facility 915f88b0- | status_ | 90 → 93 |
| projects | Art Data Centres Ennis campus 917342c6- | status_ | 208 → 211 |
| projects | Portus MUC2 9217888a- | status_ | 144 → 147 |
| projects | Jefferson Lab Data Center (JLDC) 9283d3fe- | status_ | 129 → 132 |
| projects | Lancium Clean Campus Abilene Remaining Six-Building Expansion 938feeec- | status_ | 96 → 99 |
| projects | Google Journey data center campus (Haskell County) 93e5705d- | status_ | 116 → 119 |
| projects | Microsoft Wellington Datacenter Site (Gainesville) — proposed campus 94517111- | status_ | 21 → 24 |
| projects | Fermi America Project Matador campus 94562977- | status_ | 21 → 24 |
| projects | Start Campus SIN02 Current Facility Build 94c0f50d- | status_ | 118 → 121 |
| projects | Hut 8 Beacon Point First Phase 352 MW Critical IT Lease 9563b94b- | status_ | 76 → 79 |
| projects | NEXTDC KL1 Remaining In-Progress Fit-Out 95b33a98- | status_ | 111 → 114 |
| projects | Microsoft Mount Pleasant International Drive datacenter campus 96848e3f- | status_ | 265 → 268 |
| projects | AdaniConneX Navi Mumbai data centre campus 96c80c6f- | status_ | 10 → 13 |
| projects | Mega D.C. MDCIL-5 Idan HaNegev Phase A Current Build 96d7988b- | status_ | 111 → 114 |
| projects | fantasista Sendai AI Data Center (Aoba-ku Imozawa) — Phase I development 97198e9e- | status_ | 40 → 43 |
| projects | AdaniConneX Hyderabad data centre campus 9753db27- | status_ | 10 → 13 |
| projects | Nscale Kvandal Initial 25 MW EPC Current Build 97f12a4b- | status_ | 105 → 108 |
| projects | Reliance Jamnagar AI-enabled data centre for Meta 987638c1- | status_ | 131 → 134 |
| projects | China Mobile Beijing International Information Port No6 / C18 Data Center Development 98aa0068- | status_ | 48 → 51 |
| projects | AST Jāņciems Fit-out After Building Completion 98e47ac5- | status_ | 114 → 117 |
| projects | Goodman SYD01 Current Single-Building Development 99fa93f5- | status_ | 91 → 94 |
| projects | Beacon AI Centers Heartland campus (Sturgeon County) 9a4afe64- | status_ | 223 → 226 |
| projects | atNorth ICE02 Phase 2 Expansion 9be0ab88- | status_ | 90 → 93 |
| projects | CDC Beard BE1 Current Data Center Build 9c34c305- | status_ | 91 → 94 |
| projects | CDC Laverton Current Build 9cceddca- | status_ | 90 → 93 |
| projects | Aldington Road Data Centre — proposed two-building 360 MW IT campus 9cd872c6- | status_ | 34 → 37 |
| projects | Sify Chennai 02 data center campus, Siruseri 9d173225- | status_ | 368 → 371 |
| projects | University of Science and Technology of China — Gaoxin Campus Data Centre 9d1a545f- | status_ | 42 → 45 |
| projects | TeraWulf Justified Data campus (Hawesville) 9dbfd718- | status_ | 56 → 59 |
| projects | NTT Dallas TX4 Data Center 9ddf0df3- | status_ | 141 → 144 |
| projects | Aligned Project Phoenix / PIT-01 Campus Development 9ecf2558- | status_ | 39 → 42 |
| projects | Bitdeer and Geis Shalersville AI data center campus 9ed96427- | status_ | 12 → 15 |
| projects | Nxtra Eko Atlantic Lagos Current Facility Build 9fe862f6- | status_ | 88 → 91 |
| projects | Pure DC AMS01 Data Hall Development a072994f- | status_ | 145 → 148 |
| projects | K2 hyperscale data center campus, Zibido San Giacomo and Lacchiarella a0ee0f70- | status_ | 62 → 65 |
| projects | noris network NBG6 BA3 Modular Expansion a1390e66- | status_ | 67 → 70 |
| projects | Compass Datacenters Hoffman Estates campus a1696719- | status_ | 13 → 16 |
| projects | Huizhou University — Modular Data-Centre Room Upgrade a1f0e0ac- | status_ | 4 → 7 |
| projects | Spruce Lake AI Data Centre — proposed campus and on-site generation a1f83625- | status_ | 34 → 37 |
| projects | Meta Gallatin Data Center a203f1e3- | status_ | 703 → 706 |
| projects | eStruxture CAL-3 Initial Build a225d046- | status_ | 90 → 93 |
| projects | Mihta Askiy Data Centre a2de1edb- | status_ | 10 → 13 |
| projects | Vantage Data Centers Cyberjaya II campus (KUL2) a31a1552- | status_ | 804 → 807 |
| projects | Campo de Datos Lampa — hyperscale data-centre proposal a31a3d94- | status_ | 27 → 30 |
| projects | KCCS ZED Ishikari Existing Operations a346af4c- | status_ | 83 → 86 |
| projects | Truman Brewery Block A Data Centre, 47 Grey Eagle Street a34bf1a2- | status_ | 82 → 85 |
| projects | Meta Eagle Mountain Data Center — operating campus a46f5d46- | status_ | 35 → 38 |
| projects | Quantum Frederick data center park a490f00a- | status_ | 221 → 224 |
| projects | Mamre Road Data Centre Campus — proposed 1.2 GW three-building campus a4e3a711- | status_ | 33 → 36 |
| projects | CyrusOne Freestone County data center campus a5618437- | status_ | 10 → 13 |
| projects | AWS New Carlisle data center campus (Project Rainier) a5b2cd4f- | status_ | 88 → 91 |
| projects | CloudHQ QRO Campus (Querétaro) a7a29c6e- | status_ | 384 → 387 |
| projects | China Telecom Wuqing Jing-Jin-Ji — Existing Operational Facilities a7e358de- | status_ | 35 → 38 |
| projects | QScale Q01 Building B a848e771- | status_ | 137 → 140 |
| projects | Vantage Data Centers Villanueva de Gállego campus a8c0727c- | status_ | 213 → 216 |
| projects | Lambda Kansas City AI factory a95db60b- | status_ | 356 → 359 |
| projects | Microsoft La Muela datacenter campus (Aragón) a9ca22ae- | status_ | 45 → 48 |
| projects | MERLIN Edged MAD02 Site Preparation aa2dc8a4- | status_ | 111 → 114 |
| projects | STT Jakarta 3 aa93c84a- | status_ | 131 → 134 |
| projects | AirTrunk JHB1 abb5573d- | status_ | 801 → 804 |
| projects | CRA Prague Gateway DC Current Campus Build acf9eda7- | status_ | 40 → 43 |
| projects | Flexential Hillsboro 5 Current Build ad57807a- | status_ | 62 → 65 |
| projects | NEXTDC M2 Incremental In-Progress Fit-Out ad5f9b2b- | status_ | 111 → 114 |
| projects | Borealis Blönduós Expansion Current Build adc32529- | status_ | 118 → 121 |
| projects | Cipher Black Pearl data center ade90a9a- | status_ | 76 → 79 |
| projects | Sabey SDC Austin Building B Current Build ae484949- | status_ | 125 → 128 |
| projects | QTS Cedar Rapids Current Campus Development ae6f1b86- | status_ | 96 → 99 |
| projects | AWS Ridgeway Data Centre, Iver af67ab30- | status_ | 67 → 70 |
| projects | Bitdeer Weathersfield (Niles) development site b02620fe- | status_ | 70 → 73 |
| projects | Skybox Hutto Building 4 — core and shell b03ba807- | status_ | 19 → 22 |
| projects | Digital Park Fechenheim UW04 Substation b0588082- | status_ | 109 → 112 |
| projects | Goodman MAD01 Current Development b0be5071- | status_ | 111 → 114 |
| projects | Teton Digital Black Bear power and data centre campus (Swan Hills) b10fbc1b- | status_ | 26 → 29 |
| projects | CoreSite DA1 — data center base building b18029a8- | status_ | 49 → 52 |
| projects | QTS Vimercate data center campus b19d5d3a- | status_ | 10 → 13 |
| projects | NTT Munich 2 Operating Campus b1e5c691- | status_ | 12 → 15 |
| projects | Equinix MU4 Phase 3 b284fbeb- | status_ | 95 → 98 |
| projects | Digital Edge CGK1 b2e4945f- | status_ | 133 → 136 |
| projects | Microsoft Lévis Charny Development Project b3656b35- | status_ | 133 → 136 |
| projects | NTT Frankfurt 1 7.3MW Expansion b3b98301- | status_ | 92 → 95 |
| projects | Cavour Hyperscale Campus (Trino) b3d41aee- | status_ | 84 → 87 |
| projects | Google Mesa Red Hawk — Phase 2 Building 2 b42b34a0- | status_ | 20 → 23 |
| projects | Greenergy Hüüru Data-Hall Expansion b4349487- | status_ | 81 → 84 |
| projects | Riot Rockdale AMD Expansion Phases 3 and 4 b4ff75a2- | status_ | 70 → 73 |
| projects | Scala SFORPF01 b5625b8f- | status_ | 76 → 79 |
| projects | AWS Fayette County data center site b649f6b4- | status_ | 664 → 667 |
| projects | VIRTUS Wustermark campus b6d175dc- | status_ | 140 → 143 |
| projects | Abernathy HPC campus (TeraWulf and Fluidstack joint venture) b6f0ed21- | status_ | 234 → 237 |
| projects | Carbon Node East Data Center Campus (Nesquehoning) — proposed campus b71f1891- | status_ | 61 → 64 |
| projects | IREN Childress data center campus b74385b8- | status_ | 53 → 56 |
| projects | CoreWeave/Chirisa Lancaster Greenfield Phase 1 Adaptive-Reuse Project b75695b9- | status_ | 89 → 92 |
| projects | STT Fairview data center campus b75df57e- | status_ | 182 → 185 |
| projects | Delta Forge 1 Current Construction b7744ad5- | status_ | 2026-07-27 → 2026-10-07 |
| projects | Delta Forge 1 Current Construction b7744ad5- | status_ | 84 → 15 |
| projects | Delta Forge 1 Current Construction b7744ad5- | status_ | 9a4d444e-8164-542a-b644-b21d948d12fb → 8c290350-076d-5c64-8b1f-ce755a3496c8 |
| projects | Delta Forge 1 Current Construction b7744ad5- | status_ | https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-f… → https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-r… |
| projects | Google Armstrong County data center campus (Crusoe Goodnight) b7d85afa- | status_ | 18 → 21 |
| projects | Edged Chicago ORD01-2 b8399bc6- | status_ | 137 → 140 |
| projects | Procergs Porto Alegre New Substation 6033-00 b91d994d- | status_ | 36 → 39 |
| projects | Nebius Pajarila First Phase Current Build b9ccc1e7- | status_ | 69 → 72 |
| projects | QScale Q01 campus (Lévis) b9f9191a- | status_ | 10 → 13 |
| projects | TRG HOU2 ba5ddf33- | status_ | 91 → 94 |
| projects | AirTrunk JHB3 Johor Bahru baa5ddbb- | status_ | 172 → 175 |
| projects | Wonder Valley AI data centre park (Alberta) bb1b28fd- | status_ | 10 → 13 |
| projects | China Telecom Shaotang Campus Development bb2a6c51- | status_ | 28 → 31 |
| projects | Key Point Vladivostok Data Center — operating first phase bb621aa0- | status_ | 11 → 14 |
| projects | CDC Maddington Current Build bb8ba3ad- | status_ | 116 → 119 |
| projects | Digital Realty Garland DFW45 bbd7e688- | status_ | 41 → 44 |
| projects | Page, Arizona data center site (Huntley LLC) bc344b80- | status_ | 10 → 13 |
| projects | Centro de Almacenamiento de Datos Puente Alto — initial proposal bd7a8723- | status_ | 49 → 52 |
| projects | China Unicom Langfang Zhi Yun — Existing Operational Facilities bd8714fe- | status_ | 35 → 38 |
| projects | Amazon Falls Township Active Campus Buildout bdfd522f- | status_ | 92 → 95 |
| projects | Raxio DRC1 Kinshasa — operating facility be1287af- | status_ | 60 → 63 |
| projects | Goodman PAR01 Phase 1 Current Development be6d721d- | status_ | 111 → 114 |
| projects | China Telecom Guizhou Information Park B5/B6 Civil Works be874ef3- | status_ | 29 → 32 |
| projects | Iron Mountain MAD-2 and MAD-3 20 MW Development bf8d11a2- | status_ | 111 → 114 |
| projects | Nebius Independence AI factory c01906b8- | status_ | 10 → 13 |
| projects | Nebius Birmingham AI factory (Lakeshore Parkway) c01f2073- | status_ | 251 → 254 |
| projects | Goodman HKG09 Current Redevelopment c04bedc0- | status_ | 96 → 99 |
| projects | Meta Montgomery data center c0f8dadf- | status_ | 10 → 13 |
| projects | DVZ Schwerin New Modular Data Center Current Build c1016e49- | last_ | under_construction → shell |
| projects | DVZ Schwerin New Modular Data Center Current Build c1016e49- | status_ | 2026-07-31 → 2026-09-15 |
| projects | DVZ Schwerin New Modular Data Center Current Build c1016e49- | status_ | 80 → 37 |
| projects | DVZ Schwerin New Modular Data Center Current Build c1016e49- | status_ | ad5920da-5084-504e-8d8a-3d6d2a6b0348 → 2f43ea05-55b1-5d88-9ef4-67a62608a95c |
| projects | DVZ Schwerin New Modular Data Center Current Build c1016e49- | status_ | https://www.dvz-mv.de/sites/default/files/2026-07/community-01-2026_BF-final.pdf → https://datacenter-group.com/de/news-stories/artikel/neues-rechenzentrum-fuer-dvz-in-schwerin/ |
| projects | ODATA DC SP04 Phase 2 Expansion c160d8d5- | status_ | 123 → 126 |
| projects | Microsoft Espoo Second Datacenter Building c1af62b5- | status_ | 130 → 133 |
| projects | Brookhollow Avenue Data Centre Expansion — proposed 118.3 MW building c220cc67- | status_ | 69 → 72 |
| projects | Digital Realty Nairobi Two (NBO2) c233fed8- | status_ | 42 → 45 |
| projects | QTS Aurora DEN1 DC2 Current Fit-Out c23fe40c- | status_ | 61 → 64 |
| projects | STACK SYD01 Erskine Park — proposed two-building 450 MW data centre c29f92cc- | status_ | 32 → 35 |
| projects | NorthC Frankfurt1 (FRA01) Current Facility Build c2ec8d08- | status_ | 31 → 34 |
| projects | Bitzero Namsskogan 2026 Power Infrastructure Expansion c30aeadf- | status_ | 126 → 129 |
| projects | Yondr Bristow Campus — Building 3 c37e71f0- | status_ | 32 → 35 |
| projects | Old Ocean Data Center (Nightpeak Energy) c400f10b- | status_ | 222 → 225 |
| projects | Amazon Web Services King George County campus (Birchwood site) c42e542c- | status_ | 10 → 13 |
| projects | SoftBank Hokkaido Tomakomai AI Data Center c4cf35bd- | status_ | 2026-08-04 → 2026-10-21 |
| projects | SoftBank Hokkaido Tomakomai AI Data Center c4cf35bd- | status_ | 76 → 1 |
| projects | SoftBank Hokkaido Tomakomai AI Data Center c4cf35bd- | status_ | 5d3d9ccb-c460-5418-9031-8dd22aecca92 → 9b22a038-1afb-5454-9245-9d88fc5251bd |
| projects | SoftBank Hokkaido Tomakomai AI Data Center c4cf35bd- | status_ | https://www.softbank.jp/sbnews/entry/20260804_02 → https://www.softbank.jp/sbnews/entry/20261021_01 |
| projects | Sabey SDC Umatilla Data Center Campus — current campus build c4e8eac5- | status_ | 89 → 92 |
| projects | Microsoft Etobicoke First Building Current Build c4ffa53e- | status_ | 75 → 78 |
| projects | Sify Rabale data center campus (Mumbai 03), Navi Mumbai c52dcc98- | status_ | 10 → 13 |
| projects | Data4 Hanau campus c53b72b6- | status_ | 222 → 225 |
| projects | Core Scientific Denton data center (CoreWeave) c62aed61- | status_ | 10 → 13 |
| projects | Datagrid Makarewa Initial Horizontal Works c71872a1- | status_ | 62 → 65 |
| projects | Amazon Salem Township Active Campus Buildout c73ac912- | status_ | 92 → 95 |
| projects | Princeton Digital Group JC3 Greater Jakarta c7671f1b- | status_ | 165 → 168 |
| projects | NEXTDC M3 Incremental In-Progress Fit-Out c789668b- | status_ | 111 → 114 |
| projects | Digi Power X Columbiana Purpose-Built Flagship Vertical Build c794c146- | status_ | 104 → 107 |
| projects | APL Hibikino Data Center — Hibikino-kita first building development c7ab6b45- | status_ | 4 → 7 |
| projects | Galaxy Helios data center campus c7adcc1a- | status_ | 68 → 71 |
| projects | Digital Edge EDGE2 Phase 3 Electrical and Mechanical Development c7eebc15- | status_ | 111 → 114 |
| projects | Project Celtics — Building 5 core and shell (42630 Patriot Park Dr) c805be96- | status_ | 55 → 58 |
| projects | AWS Didcot North Data Centre Campus (DCA-DCD) c841d8e3- | status_ | 84 → 87 |
| projects | FlexBase New Technology Centre Current Build c9b6bff7- | status_ | 123 → 126 |
| projects | Microsoft Skelton Grange datacentre campus, Leeds ca9b7a8f- | status_ | 175 → 178 |
| projects | Kasi Cloud LOS campus (Lekki, Lagos) cb66229f- | status_ | 153 → 156 |
| projects | DayOne Imari Data Center Campus Development cbbbbaa7- | status_ | 17 → 20 |
| projects | STACK Bossier Highway 3 Technology Park Current Campus Build cbe074bd- | status_ | 131 → 134 |
| projects | Cloud4Y Marfino Main Building Current Construction cbe9c330- | status_ | 140 → 143 |
| projects | Microsoft Mount Pleasant Second Datacenter Facility ccb7fe0e- | status_ | 2026-06-23 → 2026-09-28 |
| projects | Microsoft Mount Pleasant Second Datacenter Facility ccb7fe0e- | status_ | 118 → 24 |
| projects | Microsoft Mount Pleasant Second Datacenter Facility ccb7fe0e- | status_ | authoritative_construction_start → authoritative_physical_status_update |
| projects | Microsoft Mount Pleasant Second Datacenter Facility ccb7fe0e- | status_ | d7e6bc2e-63fd-5cb3-a118-03bec050c1e6 → a185f8e4-e963-55bb-9b98-a116dcad46cd |
| projects | Microsoft Mount Pleasant Second Datacenter Facility ccb7fe0e- | status_ | https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-ple… → https://www.mtpleasantwi.gov/m/newsflash/home/detail/639 |
| projects | atNorth NOR01 Haugaland mega site ce6cee07- | status_ | 132 → 135 |
| projects | CyrusOne Aurora CHI2 Permanent Sound-Mitigation Capital Retrofit cf028790- | last_ | under_construction → completed |
| projects | CyrusOne Aurora CHI2 Permanent Sound-Mitigation Capital Retrofit cf028790- | status_ | 2026-08-20 → 2026-10-09 |
| projects | CyrusOne Aurora CHI2 Permanent Sound-Mitigation Capital Retrofit cf028790- | status_ | 60 → 13 |
| projects | CyrusOne Aurora CHI2 Permanent Sound-Mitigation Capital Retrofit cf028790- | status_ | d4e9cd1f-158c-59ab-808a-20ede57c862b → bc68f819-2b8d-5943-ab6e-395003bf1d14 |
| projects | Hyperco Loviisa Current Data Center Development d024514a- | status_ | 109 → 112 |
| projects | Meta Sturgeon County Alberta Current Campus Build d1538d73- | status_ | 103 → 106 |
| projects | Digital Edge SEL3 Phase 2 d2915b77- | status_ | 53 → 56 |
| projects | Applied Digital Delta Forge 2 d2bf7339- | status_ | 12 → 15 |
| projects | xAI Colossus 1 (Memphis) d2db6863- | status_ | 14 → 17 |
| projects | Bulk DK01 Current New Building Construction d2e988cd- | status_ | 111 → 114 |
| projects | KC1 Data Centre, Kemps Creek — proposed 144 MW CDC data centre d2fce530- | status_ | 49 → 52 |
| projects | Sify Noida 02 data center campus d31725a8- | status_ | 368 → 371 |
| projects | Meta DeKalb Data Center d3694f4b- | status_ | 1053 → 1056 |
| projects | IIJ Shiroi Existing Operations (Phases 1 and 2) d3d3a8ea- | status_ | 73 → 76 |
| projects | China Telecom Lingang Information Park Phase 2.1 d456e2d4- | status_ | 35 → 38 |
| projects | Scala AI City (Eldorado do Sul) d461c464- | status_ | 523 → 526 |
| projects | China Mobile Hohhot B25/B27 Expansion d4f5ee02- | status_ | 9 → 12 |
| projects | DC BLOX Palm Coast Approved First Building Current Construction d5b84301- | status_ | 122 → 125 |
| projects | Frederick Street Data Centre — proposed 81 MW data centre d6050627- | status_ | 34 → 37 |
| projects | DataVita Lanarkshire AI Growth Zone campus (Chapelhall) d63cbbf2- | status_ | 47 → 50 |
| projects | Project Blue d654ea2a- | status_ | 178 → 181 |
| projects | Prologis Trenton Project Mila Campus Construction d6a6d399- | status_ | 60 → 63 |
| projects | Julius Avenue Data Centre — proposed 120 MW data centre (IPC referral) d753c323- | status_ | 5 → 8 |
| projects | Iron Mountain VA-9 Phase 1 d83dc321- | status_ | 111 → 114 |
| projects | CapitaLand DC Chennai Current Facility Build d852bc01- | status_ | 4 → 7 |
| projects | Core Scientific Muskogee data center campus d87a919b- | status_ | 83 → 86 |
| projects | Yondr Slough Buildings A and B Existing Operations da99fa49- | status_ | 81 → 84 |
| projects | Meta Cheyenne data center da9fec8b- | status_ | 10 → 13 |
| projects | Google Meitner Energy Center data center (Gray and Roberts counties) db205e2d- | status_ | 137 → 140 |
| projects | AirTrunk JHB4 Johor Bahru db7fc7c1- | status_ | 172 → 175 |
| projects | DayOne NTP Data Center Campus — in-service capacity dbd454ed- | status_ | 29 → 32 |
| projects | AWS Salem Township Innovation Campus (Susquehanna) dc6f83d9- | status_ | 10 → 13 |
| projects | Shenzhen Guangming Phase 2 LineShine Existing Operations dcf186d3- | status_ | 35 → 38 |
| projects | Campus AI Fouju dd65fe26- | status_ | 48 → 51 |
| projects | PowerHouse Louisville hyperscale campus (Camp Ground Road) dd87fe4b- | status_ | 67 → 70 |
| projects | National AI Computing Center, Solaseado (Haenam) ddaae950- | status_ | 77 → 80 |
| projects | CDC Gregadoo (Ashfords Road Data Centre) — proposed four-building campus de970e8d- | status_ | 6 → 9 |
| projects | atNorth SWE02 Current Development def7f329- | status_ | 132 → 135 |
| projects | Joliet Technology Center def89e4b- | status_ | 210 → 213 |
| projects | NXDATA-3 / NX-3 / BUH3 df2b8f33- | status_ | 139 → 142 |
| projects | AdaniConneX Pune data centre campus df5ccb0c- | status_ | 82 → 85 |
| projects | Goodman PAR02 Phase 1 Current Development e1aeeee2- | status_ | 111 → 114 |
| projects | Aether FR-SXB2 Strasbourg AI Factory e1e66d86- | status_ | 7 → 10 |
| projects | Google Cerrillos Data Center — redesigned air-cooled proposal e200ba11- | status_ | 2026-07-29 → 2026-10-16 |
| projects | Google Cerrillos Data Center — redesigned air-cooled proposal e200ba11- | status_ | 82 → 6 |
| projects | Google Cerrillos Data Center — redesigned air-cooled proposal e200ba11- | status_ | c208eb9e-b976-5f98-b64f-fa3f8e4ef229 → 7fdaedfc-91da-5029-86d9-09c46ed079e3 |
| projects | Google Cerrillos Data Center — redesigned air-cooled proposal e200ba11- | status_ | https://infofirma.sea.gob.cl/DocumentosSEA/MostrarDocumento?docId=2026/07/29/5aef-43f7-4d4f-bc6c-16b28b0264e6 → https://firma.sea.gob.cl/publicaciones/2026/10/16/1792184183_398EDC04-5B5E-4158-9D27-FFA37D459947 |
| projects | China Mobile Plateau Big Data Center Phase 2 Build e2c7ea58- | status_ | 47 → 50 |
| projects | Meta Kuna Data Center e375d86c- | status_ | 46 → 49 |
| projects | TeraWulf Lake Mariner data campus e389cd04- | status_ | 75 → 78 |
| projects | NEXTDC GE1 Incremental In-Progress Fit-Out e39b5191- | status_ | 111 → 114 |
| projects | G42 and Microsoft Olkaria geothermal data centre campus e3e31b3f- | status_ | 56 → 59 |
| projects | Iron Mountain AMS-2 10 MW Expansion e3f1fc38- | status_ | 111 → 114 |
| projects | STT Jakarta 6 e4e51c8d- | status_ | 131 → 134 |
| projects | Mega D.C. MDCIL-2 Masmiyya Facility Current Build e542ef62- | status_ | 111 → 114 |
| projects | Google Elmina Current Campus Construction e56ff51f- | status_ | 65 → 68 |
| projects | CapitaLand DC Navi Mumbai Tower 2 e62026de- | status_ | 82 → 85 |
| projects | Highreso Ayagawa Existing Operations e83a4dfc- | status_ | 32 → 35 |
| projects | Firmus St Leonards AI Factory Current Construction e8a1add0- | status_ | 109 → 112 |
| projects | DayOne Chonburi Tech Park (CTP) data center campus e934864d- | status_ | 29 → 32 |
| projects | Pozitrons Phase 1 Current Build e997ad94- | status_ | 111 → 114 |
| projects | STACK Infrastructure Berry Hill campus, Pittsylvania County e9f8645b- | status_ | 84 → 87 |
| projects | Macquarie IC3 Super West Phase 1 Build ea4a0cc5- | status_ | 94 → 97 |
| projects | CapitaLand DC ITPH Hyderabad Current Facility Build ea847e06- | status_ | 82 → 85 |
| projects | Meta Beaver Dam data center eaaa4486- | status_ | 10 → 13 |
| projects | CyrusOne Yorkville Current Site Work eaea9fff- | status_ | 92 → 95 |
| projects | Microsoft Conover Lyle Creek Current Build eb451867- | status_ | 26 → 29 |
| projects | TeraWulf Chesapeake Data Campus (Morgantown) eb75ea0d- | status_ | 75 → 78 |
| projects | Omnia Data Center Pecém ebd0b7e7- | status_ | 154 → 157 |
| projects | AirTrunk JHB2 ec871425- | status_ | 82 → 85 |
| projects | Microsoft Villamayor de Gállego datacenter campus (Aragón) ec8c635b- | status_ | 45 → 48 |
| projects | Meta New Albany data center campus (Prometheus) edaa7f7d- | status_ | 2026-09-16 → 2026-10-19 |
| projects | Meta New Albany data center campus (Prometheus) edaa7f7d- | status_ | 33 → 3 |
| projects | Meta New Albany data center campus (Prometheus) edaa7f7d- | status_ | imported_documented_status → authoritative_physical_status_update |
| projects | Meta New Albany data center campus (Prometheus) edaa7f7d- | status_ | 5e95a967-c06e-56c1-b72a-9f09ba8ca132 → 9ec64016-1b4b-58ce-b8c5-ea5884eb7ec9 |
| projects | Meta New Albany data center campus (Prometheus) edaa7f7d- | status_ | https://blog.synmax.com/vulcan-exclusive/drone-imagery-confirms-metas-prometheus-south-operating-prometheus-north-still… → https://datacenters.atmeta.com/2026/10/new-albany-where-ohios-community-spirit-meets-the-frontier-of-ai/ |
| projects | Microsoft Heath Initial Site Preparation edf978b4- | status_ | 110 → 113 |
| projects | Iozera Tetouan AI data center and hub ee6721e5- | status_ | 102 → 105 |
| projects | Bridge Data Centres MY06, Sedenak Tech Park eebaf579- | status_ | 34 → 37 |
| projects | Digital Realty Digital Dulles Current 96 MW Development f054a923- | status_ | 112 → 115 |
| projects | Data4 Cambrai E-Valley campus f0697b74- | status_ | 130 → 133 |
| projects | ACS DC La Puebla data center campus f07274ee- | status_ | 14 → 17 |
| projects | Data4 Escaudain campus f0afff75- | status_ | 126 → 129 |
| projects | Vantage ZRH12 f0e92e2e- | status_ | 81 → 84 |
| projects | QTS Eagle Mountain SLC1 Building 2 f166440f- | status_ | 110 → 113 |
| projects | Microsoft La Porte First Phase Current Build f2b93d1a- | status_ | 123 → 126 |
| projects | Google Bermuda Hundred Current Development f3cc5dc7- | status_ | 110 → 113 |
| projects | QTS DFW2 DC7 f3ee5e25- | status_ | 27 → 30 |
| projects | Raxio MZ1 Beluluane — operating facility f3f11475- | status_ | 90 → 93 |
| projects | Terranova Campinas data centre campus f533639a- | status_ | 54 → 57 |
| projects | Shandong University Longshan — Phase 1 Data Centre and Research Platform f56086e4- | status_ | 42 → 45 |
| projects | Cipher Digital Black Pearl Phase II Current Build f595ca9f- | status_ | 76 → 79 |
| projects | Google Grange Castle South Data Storage Facility Expansion f6259b7c- | status_ | 26 → 29 |
| projects | Racks Central RCJM1 Phase A f6d1bce2- | status_ | 111 → 114 |
| projects | Microsoft New Albany Initial Site Preparation f8377a0f- | status_ | 110 → 113 |
| projects | Goodman AMS01 Phase 1 Current Development f8900f55- | status_ | 111 → 114 |
| projects | AirTrunk HYD1 Hyderabad f8a7bd1c- | status_ | 10 → 13 |
| projects | Nishitetsu Fukuoka Data Center Existing Operations f8a92123- | status_ | 77 → 80 |
| projects | Sien Real Piaseczno Data Center — four-building campus f988d3dd- | status_ | 19 → 22 |
| projects | Digital Realty VIE13 Phase 1 Current Data Center Build f9e7c64e- | status_ | 123 → 126 |
| projects | Cipher Digital Stingray Data Center Current Build fa44cb24- | status_ | 76 → 79 |
| projects | Bitdeer Massillon 2026 Fire-Damaged Buildings Reconstruction fb943def- | status_ | 90 → 93 |
| projects | Beacon AI Centers Indus campus fbbfee97- | status_ | 10 → 13 |
| projects | LG Uplus Paju AIDC Building 1 fc6dd688- | status_ | 136 → 139 |
| projects | XTX Markets Kajaani Second Data Center fe6f26cf- | status_ | 116 → 119 |
| projects | PowerHouse Grand Prairie campus (PowerHouse and Provident) fe8ac418- | status_ | 200 → 203 |
| projects | DayOne Kiveriö Unnamed Data Center Construction Project fe92035e- | status_ | 29 → 32 |
| projects | Nscale Glomfjord AI Data Center — operating facility ff2f4407- | status_ | 31 → 34 |
| projects | EdgeConneX Greater Osaka campus (Kagoya Tatara Campus, Kyotanabe) ffbda424- | status_ | 215 → 218 |
| evidence | Key Point Vladivostok data-centre page with operator map marker 059e2c64- | project_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Telehouse International Corporation of Europe Ltd: permit variation application form Part C2 (EPR/EP3507SL/V004), Docklands Technical Centres, 28 July 2026 15786f2f- | project_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Shaoguan government: Zhenjiang accelerates GBA computing core (reprinted from Shaoguan Daily) 2e26970a- | project_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Meta: Deepening Our Investment in Eagle Mountain, Utah 3054d6db- | roles_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Meta: Deepening Our Investment in Eagle Mountain, Utah 3054d6db- | project_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Shaoguan NRB pre-approval notice: China Mobile GBA (Shaoguan) Data Center C and D buildings, maintenance building and switching station 44c2ba34- | roles_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Shaoguan NRB pre-approval notice: China Mobile GBA (Shaoguan) Data Center C and D buildings, maintenance building and switching station 44c2ba34- | project_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Shaoguan government: China Mobile GBA (Shaoguan) Data Center formally in operation (June 2025) 46ff35a8- | project_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Utah County parcel service: parcels owned by Stadion LLC, Eagle Mountain 7591385f- | project_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | TxGIO StratMap Land Parcels: Soluna MB KK II Landco Phase I LLC parcel, FM 1420, Willacy County 991e5ac4- | project_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Shaoguan NRB pre-approval notice plan sheet: China Mobile GBA (Shaoguan) Data Center C/D, parcel ZC0201A-15 a753caa5- | roles_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Shaoguan NRB pre-approval notice plan sheet: China Mobile GBA (Shaoguan) Data Center C/D, parcel ZC0201A-15 a753caa5- | project_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Telehouse International Corporation of Europe Ltd: environmental permit variation application EPR/EP3507SL/V004, non-technical summary (SLR, 28 July 2026) a7cab974- | roles_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Telehouse International Corporation of Europe Ltd: environmental permit variation application EPR/EP3507SL/V004, non-technical summary (SLR, 28 July 2026) a7cab974- | project_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Datum named a finalist in the Hampshire Business Awards 2026 (Datum news, 7 October 2026) ad11c758- | roles_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Datum named a finalist in the Hampshire Business Awards 2026 (Datum news, 7 October 2026) ad11c758- | project_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | TxGIO StratMap 9-1-1 address point: 1602 Ferris Rd, Garland bfd15533- | project_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Key Point at EEF 2026: Vladivostok first phase nearly full, second phase planned e3c503ae- | roles_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Key Point at EEF 2026: Vladivostok first phase nearly full, second phase planned e3c503ae- | project_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | GOV.UK / Environment Agency: E14 2EH, Telehouse International Corporation Of Europe Ltd: environmental permit application advertisement - EPR/EP3507SL/V004 fc5f4723- | project_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Soluna completes Project Kati 1 and receives ERCOT Batch Zero classification for the Kati campus fde9e954- | roles_ | JSON value changed (see the CSV files of both snapshots) |
| evidence | Soluna completes Project Kati 1 and receives ERCOT Batch Zero classification for the Kati campus fde9e954- | project_ | JSON value changed (see the CSV files of both snapshots) |
Cite this snapshot #
Kyars, K. (2026). Data Center Atlas (2026-10-22) [Data set]. https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-22-research-thirtyfourth/