2026-10-16 · 516 sites

Atlas data archived on 2026-10-16, with additions and corrections listed below.

Summary #

Updated
Observation dates
to
Counts
516 sites, 543 projects, 60 countries, 2747 evidence rows
Previous snapshot
2026-10-15 · 437 sites
Manifest SHA-256
f40103791cdd26f3abb67358c7e3001e0641b4118409305c28340947ed8724f9
Files
Download this snapshot · GitHub

Changes from the previous snapshot #

79 sites added; 19 sites changed; 80 projects added; 463 projects changed; 375 evidence rows added; 1 evidence row changed.

Sites added (79) #

Fields changed (571) #

Values that changed between the two snapshots. The earlier data remains available.

TableRecordFieldBefore → after
sitesCapitaLand DC Navi Mumbai Campus
vcc-site-07ef7b0d529815ef1fe5
project_count1 → 2
sitesCapitaLand DC Navi Mumbai Campus
vcc-site-07ef7b0d529815ef1fe5
project_ids_jsonJSON value changed (see the CSV files of both snapshots)
sitesCapitaLand DC Navi Mumbai Campus
vcc-site-07ef7b0d529815ef1fe5
project_stable_keys_jsonJSON value changed (see the CSV files of both snapshots)
sitesCapitaLand DC Navi Mumbai Campus
vcc-site-07ef7b0d529815ef1fe5
statuses_jsonJSON value changed (see the CSV files of both snapshots)
sitesCapitaLand DC Navi Mumbai Campus
vcc-site-07ef7b0d529815ef1fe5
verification_posturerecent_authoritative_physical_observation_plus_reviewed_site_locator → mixed_review_postures
sitesCapitaLand DC Navi Mumbai Campus
vcc-site-07ef7b0d529815ef1fe5
imagery_review_outcomes_jsonJSON value changed (see the CSV files of both snapshots)
sitesCRA Prague Gateway Data Center Campus
vcc-site-418907144d1bd1426055
oldest_status_as_of2026-08-20 → 2026-09-09
sitesCRA Prague Gateway Data Center Campus
vcc-site-418907144d1bd1426055
newest_status_as_of2026-08-20 → 2026-09-09
sitesENKA Data Solutions EDS IST 01 Tuzla Data Center
vcc-site-41e0189f5fc22ef9a733
oldest_status_as_of2026-06-12 → 2026-08-12
sitesENKA Data Solutions EDS IST 01 Tuzla Data Center
vcc-site-41e0189f5fc22ef9a733
newest_status_as_of2026-06-12 → 2026-08-12
sitesGalaxy Helios Data Center Campus
vcc-site-43bf6c7b8c9e9dfc51d0
statuses_jsonJSON value changed (see the CSV files of both snapshots)
sitesGalaxy Helios Data Center Campus
vcc-site-43bf6c7b8c9e9dfc51d0
oldest_status_as_of2026-07-06 → 2026-08-12
sitesDigital Edge Seoul Bupyeong Campus
vcc-site-5750ea0ecd6d7c900211
oldest_status_as_of2026-07-09 → 2026-08-27
sitesDigital Edge Seoul Bupyeong Campus
vcc-site-5750ea0ecd6d7c900211
newest_status_as_of2026-07-09 → 2026-08-27
sitesDayOne Kiveriö Unnamed Data Center Campus
vcc-site-5a7d73c964538b72f14d
oldest_status_as_of2026-08-11 → 2026-09-20
sitesDayOne Kiveriö Unnamed Data Center Campus
vcc-site-5a7d73c964538b72f14d
newest_status_as_of2026-08-11 → 2026-09-20
sitesAirTrunk Kurri Kurri Data Centre
vcc-site-63d7eb757cdf71a1ae84
statuses_jsonJSON value changed (see the CSV files of both snapshots)
sitesAirTrunk Kurri Kurri Data Centre
vcc-site-63d7eb757cdf71a1ae84
oldest_status_as_of2026-09-21 → 2026-10-14
sitesAirTrunk Kurri Kurri Data Centre
vcc-site-63d7eb757cdf71a1ae84
newest_status_as_of2026-09-21 → 2026-10-14
sitesAirTrunk Kurri Kurri Data Centre
vcc-site-63d7eb757cdf71a1ae84
verification_postureimported_source_record → authoritative_project_record_plus_scoped_location
sitesDatum Farnborough Campus
vcc-site-7640a30b806a3ae123de
oldest_status_as_of2026-09-04 → 2026-10-07
sitesDatum Farnborough Campus
vcc-site-7640a30b806a3ae123de
newest_status_as_of2026-09-04 → 2026-10-07
sitesCSC LUMI-AI Data Center
vcc-site-770ec5f91c36fa41886d
oldest_status_as_of2026-08-20 → 2026-09-03
sitesCSC LUMI-AI Data Center
vcc-site-770ec5f91c36fa41886d
newest_status_as_of2026-08-20 → 2026-09-03
sitesEdged Council Bluffs Data Center Campus
vcc-site-7cc1c64f44550b086450
oldest_status_as_of2026-07-17 → 2026-09-11
sitesEdged Council Bluffs Data Center Campus
vcc-site-7cc1c64f44550b086450
newest_status_as_of2026-07-17 → 2026-09-11
sitesLancium Clean Campus Abilene AI Data Center
vcc-site-85b3549bb55293336132
oldest_status_as_of2026-06-04 → 2026-07-15
sitesProcergs Porto Alegre Data Center Campus
vcc-site-900b1508d570a2f4253f
statuses_jsonJSON value changed (see the CSV files of both snapshots)
sitesProcergs Porto Alegre Data Center Campus
vcc-site-900b1508d570a2f4253f
oldest_status_as_of2026-07-01 → 2026-09-13
sitesProcergs Porto Alegre Data Center Campus
vcc-site-900b1508d570a2f4253f
newest_status_as_of2026-07-01 → 2026-09-13
sitesMicrosoft Conover Lyle Creek Data Center
vcc-site-9b86fe87cb674e474940
oldest_status_as_of2026-05-31 → 2026-09-23
sitesMicrosoft Conover Lyle Creek Data Center
vcc-site-9b86fe87cb674e474940
newest_status_as_of2026-05-31 → 2026-09-23
sitesCapitaLand DC Chennai Ambattur Campus
vcc-site-a982e0093e476f44e98f
oldest_status_as_of2026-07-29 → 2026-10-15
sitesCapitaLand DC Chennai Ambattur Campus
vcc-site-a982e0093e476f44e98f
newest_status_as_of2026-07-29 → 2026-10-15
sitesDayOne Chonburi Tech Park (CTP) data center campus
vcc-site-b020cba78b5fa2123866
statuses_jsonJSON value changed (see the CSV files of both snapshots)
sitesDayOne Chonburi Tech Park (CTP) data center campus
vcc-site-b020cba78b5fa2123866
oldest_status_as_of2026-04-26 → 2026-09-20
sitesDayOne Chonburi Tech Park (CTP) data center campus
vcc-site-b020cba78b5fa2123866
newest_status_as_of2026-04-26 → 2026-09-20
sitesAkashi Astana Data Center Campus
vcc-site-cc8bbdad8c252d9ba4e2
oldest_status_as_of2026-07-21 → 2026-09-24
sitesAkashi Astana Data Center Campus
vcc-site-cc8bbdad8c252d9ba4e2
newest_status_as_of2026-07-21 → 2026-09-24
sitesVantage Lighthouse Port Washington Data Center Campus
vcc-site-d272a722ca415c1be654
oldest_status_as_of2026-06-12 → 2026-08-28
sitesVantage Lighthouse Port Washington Data Center Campus
vcc-site-d272a722ca415c1be654
newest_status_as_of2026-06-12 → 2026-08-28
sitesNEXTDC S7 Sydney
vcc-site-dd0f231b23c8dd96495b
oldest_status_as_of2025-12-05 → 2026-08-31
sitesNEXTDC S7 Sydney
vcc-site-dd0f231b23c8dd96495b
newest_status_as_of2025-12-05 → 2026-08-31
sitesNEXTDC S7 Sydney
vcc-site-dd0f231b23c8dd96495b
verification_postureimported_source_record → authoritative_project_record_plus_scoped_location
sitesOracle Project Jupiter Doña Ana County AI Data Center Campus
vcc-site-f65d3c659a862ad07679
oldest_status_as_of2026-09-14 → 2026-10-13
sitesOracle Project Jupiter Doña Ana County AI Data Center Campus
vcc-site-f65d3c659a862ad07679
newest_status_as_of2026-09-14 → 2026-10-13
projectsEzditek RUH01 Phase 1 Current Build
010c4071-5901-54ea-a312-f59d53358a0a
status_age_days_at_review119 → 120
projectsDataVolt Oxagon AI data centre campus (NEOM)
016877e7-a475-5ebe-9219-0ac699cfff53
status_age_days_at_review38 → 39
projectsDigital Realty 330 E. Cermak Current Facility Build
01baa3bb-ea56-5f41-8c67-82dd84f87d51
status_age_days_at_review88 → 89
projectsJERA / RHAELM Chiba AI Data Center Infrastructure
02a9ee88-08e5-58fd-b715-488b3ee903a3
status_age_days_at_review14 → 15
projectsSTT Tokyo 1 Existing Operations
0315dd21-342a-5554-91d4-4441583837c7
status_age_days_at_review55 → 56
projectsNew Hill Digital Campus
03207f8c-1d9d-577f-9d8c-af881144fb86
status_age_days_at_review219 → 220
projectsGoogle Waltham Cross data centre
03b5fd0f-9eaf-5f2b-bd8e-7c11fe6672a9
status_age_days_at_review394 → 395
projectsKeppel DC SGP 9 Current Build
04b22725-af3a-5d12-b2b6-0caf17b0c39e
status_age_days_at_review77 → 78
projectsnoris network FRA1 Schwalbach Current Build
05033935-bf13-5754-a9af-25c96ea1b473
status_age_days_at_review127 → 128
projectsDaou Jukjeon CDC Current Build
057826b7-3798-5e94-9628-e76e45647c61
status_age_days_at_review62 → 63
projectsChina Unicom Tianjin Jing-Jin-Ji Park South Zone DC1 / DC2
066110dc-81e1-5f18-8a28-b670f1cdde98
status_age_days_at_review36 → 37
projectsAWS Vicksburg data center campus
077a5970-0684-5ef0-8320-65efbf78c960
status_age_days_at_review189 → 190
projectsColt Paris 2 Current Facility Build
08d881e7-8a1c-50da-81a5-d2ef49f22a7a
status_age_days_at_review88 → 89
projectsGoogle West Memphis data center campus
09904943-69d4-51d7-aef7-4ff880e47332
status_age_days_at_review231 → 232
projectsGreen Mountain Undheim Current Two-Building Development
0a075c8d-2733-5aba-b19a-4b53e51fd8f8
status_age_days_at_review87 → 88
projectsGoogle / Beale Tulsa County Project Clydesdale Campus Construction
0a4a2c40-bdf2-5f56-aa09-ecfa54431d3c
status_age_days_at_review57 → 58
projectsBell AI Fabric Sherwood campus (Regina area)
0b37ac4d-93f2-559b-a6ec-f5a12938681a
status_age_days_at_review14 → 15
projectsChirisa Chesterfield Digital Drive Current Build
0b67b532-d779-5784-bd6d-d7ee124844aa
status_age_days_at_review106 → 107
projectsColt London 4 Current Facility Build
0bac3fe4-c3dd-54ba-a500-e37599191432
status_age_days_at_review88 → 89
projectsIron Mountain NJE-1 Expansion
0bf81b53-0bf9-551d-807b-16392ea21962
status_age_days_at_review107 → 108
projectsMirai Ogaki Data Center Campus Existing Operations
0c37f689-99a9-5751-87e1-e83509752206
status_age_days_at_review16 → 17
projectsPure DC Brent Cross LON01 B2 Composite Build
0cdff49d-f05c-5993-acd1-d1259fd80165
status_age_days_at_review43 → 44
projectsCtrlS Chandanvelly AI-ready data center park
0d416a87-60ba-5c1d-a419-a94965619724
status_age_days_at_review630 → 631
projectsTCS HyperVault AI data center campus, Bharat Future City (Hyderabad)
0d75be4c-1fff-5854-895c-71aef25eff11
status_age_days_at_review36 → 37
projectsApplied Digital Polaris Forge 3
0eb54c2e-ed0f-58e9-85cc-bf616b723139
status_age_days_at_review8 → 9
projectsMicrosoft Fairwater AI datacenter, Mount Pleasant
0f5f4fcc-53c4-53d0-9795-2a387d195364
status_age_days_at_review114 → 115
projectsOMNIA Pecém Initial Data Center Construction
0fd5e6a4-6421-5a23-b51c-e490e4a79cd9
status_age_days_at_review121 → 122
projectsAI Tech Tomakomai Phase I Foundation Works
100cf064-1cae-5dba-a4d9-6c4ae35152ec
status_age_days_at_review118 → 119
projectsRaiden Infotech Turbhe MIDC Data Centre EC 531703 Current Build
118053c0-38ee-5fc1-9c4d-f4875cc3c32e
status_age_days_at_review73 → 74
projectsPolaris Forge 2 Current Construction
12407b2e-a44d-5c8d-aa62-c7b64045e20f
status_age_days_at_review80 → 81
projectsVantage Frontier campus (Stargate Shackelford County)
126f2c37-cadc-5f20-9e3c-e544d70b5c37
status_age_days_at_review37 → 38
projectsMeta Talavera de la Reina data center campus
1369aebb-7496-56a6-9260-159cd3a37283
status_age_days_at_review48 → 49
projectsMeta Richland Parish Current Development
1404f5cd-04ee-57ea-8f73-91992fea0552
status_age_days_at_review91 → 92
projectsDigiCo SYD1 Ultimo Expansion Early Works
14a67880-da37-5f59-a2cf-2322bbf778d7
status_age_days_at_review57 → 58
projectsGreen IT Aragón data center campus (SAMCA), Luceni
15360f72-acfa-572f-aac9-eb117ae9fc0d
status_age_days_at_review10 → 11
projectsEDS IST 01 Tuzla Initial Build
15e0ef92-6408-5517-b0d4-a6b8707745f4
status_as_of2026-06-12 → 2026-08-12
projectsEDS IST 01 Tuzla Initial Build
15e0ef92-6408-5517-b0d4-a6b8707745f4
status_age_days_at_review125 → 65
projectsEDS IST 01 Tuzla Initial Build
15e0ef92-6408-5517-b0d4-a6b8707745f4
status_evidence_id6b7130b5-f5f5-50c8-9689-6b8e348e0015 → a49c8807-490f-5ae6-aee7-98b142b4575b
projectsEDS IST 01 Tuzla Initial Build
15e0ef92-6408-5517-b0d4-a6b8707745f4
status_source_urlhttps://www.linkedin.com/embed/feed/update/urn:li:activity:7471178062345297920 → https://www.enka.com/progress-of-the-istanbul-tuzla-data-center-project/
projectsCDC Marsden Park Early Construction
164033cb-411d-5ffb-ab5d-b04bdecfa1ac
status_age_days_at_review86 → 87
projectsMicrosoft Alviso Phase 2 Greenfield Development
1861d9fb-3980-5a16-baa1-c32762e244c1
status_age_days_at_review127 → 128
projectsLa Osa Energy Center (Vermaland), Pinal County
18844ee0-7ce9-5a0b-9a50-1d9ed0769266
status_age_days_at_review50 → 51
projectsGoogle Stillwater data center campus
1b7d1694-1f94-5ac5-a39d-ef81696ed589
status_age_days_at_review6 → 7
projectsTelia New Vilnius Data Center
1cae5b48-c630-5f16-9fe2-5d77571cafe9
status_age_days_at_review107 → 108
projectsKao Data Park Royal Revised Data Centre Development
1cc64264-38aa-5ec3-bbd6-793cb27c5ad0
status_age_days_at_review86 → 87
projectsIIJ Shiroi DCC Phase 3 Server Building
1f33fed8-b0f9-50e2-8fac-56d135325c27
status_age_days_at_review112 → 113
projectsatNorth FIN05 Salo mega site
1f415639-6b0f-5f32-b15e-07984488b5cc
status_age_days_at_review10 → 11
projectsMeta Lebanon Indiana Current Development
1f430ea1-a0e6-5a91-b3e7-3f002b331cf6
status_age_days_at_review101 → 102
projectsHIVE Yguazú 2026 Campus Electrical-Infrastructure Expansion
20a32e9d-3c57-520d-aeb8-ad999d43fee3
status_age_days_at_review62 → 63
projectsPolaris Forge 1 Current Expansion
20ee1eea-91bf-52aa-a464-c4a38d436f9e
status_age_days_at_review80 → 81
projectsIshikari Renewable Energy Data Center No.1
24294ce0-7368-5eb7-8e71-b0639d754082
status_age_days_at_review75 → 76
projectsShaanxi Xueqian Normal University — Chang’an Data Centre Room Renovation
247e2a4e-ebf1-50e4-ac1b-f8ac3e87826d
status_age_days_at_review36 → 37
projectsIron Mountain MIA-1 Build
24911fb6-56e2-5357-a224-8cbd977e2234
status_age_days_at_review107 → 108
projectsMicrosoft San Bovio Initial Development
257f3255-46fe-585e-bdf5-9689b34edbdc
status_age_days_at_review106 → 107
projectsAligned Conesville Current Site Preparation
26ebe837-0ec5-5973-a729-656b1b4ce011
status_age_days_at_review106 → 107
projectsRiot Platforms Corsicana facility
27338e9f-68b5-58be-b981-a8a13c391bd6
status_age_days_at_review66 → 67
projectsGoogle Cedar Rapids data center campus (Big Cedar Industrial Center)
27c38b34-579b-5542-b04b-44d6d5747bff
status_age_days_at_review10 → 11
projectsatNorth DEN02 Varde mega site
297b1705-767f-5434-af46-c08932afceb9
status_age_days_at_review65 → 66
projectsRiot Platforms Rockdale data center campus
298d7152-0985-535e-a701-60b689a3cd00
status_age_days_at_review66 → 67
projectsTillion Aragón data center campus (Azora), Villamayor de Gállego
2a273a46-2f4f-5ccb-9d10-6f2bfeb5e5f5
status_age_days_at_review10 → 11
projectsHerbata data centre campus (Naas)
2a418e82-60a0-52bf-ac57-8e0e3d3eabdb
status_age_days_at_review6 → 7
projectsCompass Datacenters Meridian campus
2b520cfa-8aea-5212-9b60-8ff417ee6578
status_age_days_at_review6 → 7
projectsQTS Cambois Data Centre Campus
2bd78b04-9314-5aa8-ac32-ef30e111bc2e
status_age_days_at_review70 → 71
projectsBridge Data Centres MY07, Ulu Tiram
2c24f89f-37e6-5164-a240-e1e3d2fca176
status_age_days_at_review43 → 44
projectsBulk N01 Current New Facility Construction
2c3a5bbe-3573-5abe-98dc-8d8312b0a586
status_age_days_at_review107 → 108
projectsAscenty Vinhedo 3
2cac8eb7-dff6-50bc-be49-b45f6e353982
status_age_days_at_review140 → 141
projectsAWS Clinton data center (former Delphi plant)
2cb7333c-d029-5457-baf2-346f48e7fb26
status_age_days_at_review128 → 129
projectsYTL Green Data Center Park, Kulai
2d2dbfa9-0685-5532-8d89-80ceeaf07427
status_age_days_at_review56 → 57
projectsTeraWulf Lake Hawkeye data campus
2e14f098-9798-567b-ae40-a7d552f9be18
status_age_days_at_review71 → 72
projectsCDC Eastern Creek EC5 Current Build
2e2b9d40-5024-5e6d-bbb2-56a8b16b9c16
status_age_days_at_review86 → 87
projectsGalaxy Helios Phase II 260 MW Critical IT Build
2f422325-bd08-5072-a93f-dde01520f486
last_observed_physical_statusunder_construction → foundations
projectsGalaxy Helios Phase II 260 MW Critical IT Build
2f422325-bd08-5072-a93f-dde01520f486
status_as_of2026-07-06 → 2026-08-12
projectsGalaxy Helios Phase II 260 MW Critical IT Build
2f422325-bd08-5072-a93f-dde01520f486
status_age_days_at_review101 → 65
projectsGalaxy Helios Phase II 260 MW Critical IT Build
2f422325-bd08-5072-a93f-dde01520f486
status_evidence_id8c104356-5de7-5156-9a00-2996e59f07af → 0263902e-8b93-5a5d-ae5a-65ba11c36666
projectsGalaxy Helios Phase II 260 MW Critical IT Build
2f422325-bd08-5072-a93f-dde01520f486
status_source_urlhttps://www.galaxy.com/newsroom/galaxy-completes-phase-i-of-its-helios-data-center-campus → https://www.galaxy.com/newsroom/q226-unwrapped
projectsMeta Temple Data Center
2fc433ea-05de-5b3a-b4a1-bd9d544f8ae3
status_age_days_at_review85 → 86
projectsMeta Tulsa data center
302bc1de-8d94-5ca1-a94e-ceb9facdcc1e
status_age_days_at_review6 → 7
projectsEcoDataCenter 2 Borlänge campus
304e9b81-f1b5-5a80-8ad5-6f46e12f5a85
status_age_days_at_review10 → 11
projectsRelated Digital Cheyenne Phase 1
31635fdf-a7a6-52c8-91dc-f64e5c7d10d3
status_age_days_at_review87 → 88
projectsStargate Milam County (SB Energy campus)
316e6c68-21e0-50d1-973e-d4fa5847a99f
status_age_days_at_review181 → 182
projectsCrusoe Abilene AI factory campus for Microsoft
31ee01b0-a72b-5f4a-bcc1-a13a53732efc
status_age_days_at_review92 → 93
projectsApplied Digital Polaris Forge 1
32b98d7e-1d0f-5c16-af18-3f469f3b662b
status_age_days_at_review8 → 9
projectsMeta Kansas City data center
3315c754-ca0d-5702-8071-44b22787215a
status_age_days_at_review421 → 422
projectsMeta El Paso Current Development
337ace90-652d-52fe-a856-fe9b04b5966f
status_age_days_at_review79 → 80
projectsAirTrunk Kurri Kurri Data Centre
33a0110e-c5fb-58d0-8913-81aef5fdd9d3
last_observed_physical_statusproposed → announced
projectsAirTrunk Kurri Kurri Data Centre
33a0110e-c5fb-58d0-8913-81aef5fdd9d3
status_as_of2026-09-21 → 2026-10-14
projectsAirTrunk Kurri Kurri Data Centre
33a0110e-c5fb-58d0-8913-81aef5fdd9d3
status_age_days_at_review24 → 2
projectsAirTrunk Kurri Kurri Data Centre
33a0110e-c5fb-58d0-8913-81aef5fdd9d3
status_methodimported_documented_status → authoritative_project_announcement
projectsAirTrunk Kurri Kurri Data Centre
33a0110e-c5fb-58d0-8913-81aef5fdd9d3
status_evidence_idbaa735f1-e94d-5d9a-be5f-1288d2a7bc70 → 9abdf3e5-e72b-57ac-8e88-facff23d6259
projectsAirTrunk Kurri Kurri Data Centre
33a0110e-c5fb-58d0-8913-81aef5fdd9d3
verification_postureimported_source_record → authoritative_project_record_plus_scoped_location
projectsAirTrunk Kurri Kurri Data Centre
33a0110e-c5fb-58d0-8913-81aef5fdd9d3
status_source_urlhttps://www.planningportal.nsw.gov.au/major-projects/projects/kurri-kurri-data-centre → https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-128819490%2120261013…
projectsKIO Data Centers QRO3, Querétaro
352e29e6-cabf-5acb-bd20-619157576502
status_age_days_at_review59 → 60
projectsCoreWeave Kenilworth NEST 11 AI data center
35995588-0599-5f9b-bc3d-29f9f67ea81b
status_age_days_at_review6 → 7
projectsTelecom Egypt Regional Data Hub 2
35c427dc-af95-5011-b3ab-3fa7c90fcb30
status_age_days_at_review127 → 128
projectsAmazon and STACK campus at Resilient Technology Park, Shreveport
3641032c-9acd-5840-b94b-beab26a1ce0d
status_age_days_at_review49 → 50
projectsData World Matatirtha Core Data Center Current Build
36ac2490-7d9c-51f3-96c4-1344481aa4e2
status_age_days_at_review106 → 107
projectsNEXTDC S4 Initial Development
3761e59a-fe39-523d-83a6-9fbfa9feec85
status_age_days_at_review107 → 108
projectsAVAIO Digital Taurus Phase One Current Campus Build
37e33657-b788-57e6-98f2-b78834cdecda
status_age_days_at_review87 → 88
projectsTen Brinke Spata Data Center Active Construction
38033ec9-dbd8-56bb-8a35-0fa91dd284e2
status_age_days_at_review86 → 87
projectsKhazna QAJ1 AI data center (Ajman)
384a401d-cc7f-52e4-9ae3-218a378995b9
status_age_days_at_review366 → 367
projectsNebius Vineland AI factory
38cbdb58-5ff7-504d-98be-60187be91e02
status_age_days_at_review6 → 7
projectsmaincubes BER02
3941c42e-216d-52fa-b0d8-d7555b441a1a
status_age_days_at_review88 → 89
projectsAWS Lake Anna Technology Campus
39753efd-ec90-5e1a-a234-8551ba238bda
status_age_days_at_review213 → 214
projectsIREN Kiowa data center campus
39b97d53-5af7-55ea-bfc4-6f2f08f32e74
status_age_days_at_review37 → 38
projectsPennsylvania Digital I (PAX-1), Middlesex Township
39dca169-c304-53a7-b2a6-15a9a914e4d1
status_age_days_at_review224 → 225
projectsQTS and Lancium Hall County data center campus
39eada86-53aa-55d0-ae26-0ff35f9e1207
status_age_days_at_review94 → 95
projectsStart Campus SINES data center campus
3a54ff50-0fd6-5767-86f2-c6818a515bb2
status_age_days_at_review73 → 74
projectsKAGOYA Japan Keihanna Lab Existing Operations
3a5eff63-ee0a-5c1e-8e38-702d30e7c20a
status_age_days_at_review21 → 22
projectsVantage Lighthouse Port Washington Current Campus Build
3b636397-fbb2-5564-a352-fa1382a218b5
status_as_of2026-06-12 → 2026-08-28
projectsVantage Lighthouse Port Washington Current Campus Build
3b636397-fbb2-5564-a352-fa1382a218b5
status_age_days_at_review125 → 49
projectsVantage Lighthouse Port Washington Current Campus Build
3b636397-fbb2-5564-a352-fa1382a218b5
status_evidence_id928bbcd8-079d-5b85-a631-2477c6513a79 → 2659d4c4-2dad-5902-9c7e-f9365e4ac9a1
projectsVantage Lighthouse Port Washington Current Campus Build
3b636397-fbb2-5564-a352-fa1382a218b5
status_source_urlhttps://dnr.wisconsin.gov/topic/EIA/Portwashington.html → https://www.oracle.com/data-centers/
projectsHut 8 River Bend 245 MW Critical IT Current Build
3e074273-f5f7-5785-ab10-232a5ebd5c6b
status_age_days_at_review72 → 73
projectsAWS Richmond County data center campus
3e853975-e7a4-52ba-bc38-6b3d09bfdaf0
status_age_days_at_review22 → 23
projectsTract Buckeye data center park
3f13d78d-ac2f-533b-8e04-01009bd9d17b
status_age_days_at_review122 → 123
projectsTerranova Praia Grande data center campus (proposed)
3fc18374-cbc2-5a11-9356-ab751ac3820c
status_age_days_at_review51 → 52
projectsAirTrunk TOK1 Tokyo East
3fe8297a-147b-56fe-a5a6-6ae165798506
status_age_days_at_review219 → 220
projectsSCSK netXDC Chiba No.3 (SI3)
400c245c-51e6-5b28-b91f-0c9f27dbaaae
status_age_days_at_review14 → 15
projectsQTS Eemshaven data center campus
409466ac-1b48-5098-adf6-4f3a2999b5f6
status_age_days_at_review6 → 7
projectsIgoudar Dakhla green data centre complex
40a718e2-038a-5edf-a495-ba05e3f76560
status_age_days_at_review182 → 183
projectsCore Scientific Hunt County data center site
40abc164-3033-5172-b386-52422d1513b9
status_age_days_at_review79 → 80
projectsTongji University Siping East Campus — A-building Data-Centre Fit-out
4195ab55-a931-5bf9-9439-0f9f59f0fbbc
status_age_days_at_review1 → 2
projectsKhazna Data Centers Dammam campus
41ec9844-286f-5128-a8bf-54e1e328301f
status_age_days_at_review310 → 311
projectsBoda Langfang No. 2 Phase 2
41f90b54-eb7c-5766-bb29-7ad689720c09
status_age_days_at_review6 → 7
projectsStargate UAE / UAE-US AI Campus
4278fea3-2c31-5512-87d1-d713170569e2
status_age_days_at_review63 → 64
projectsPrinceton Digital Group JC4 Greater Jakarta
42ae14a5-797b-5251-a05a-c9a12ddc6603
status_age_days_at_review168 → 169
projectsSTT Jakarta 5
42e50e84-873d-562d-b6d2-945ccf04b0e8
status_age_days_at_review127 → 128
projectsMERLIN Lisbon Phase II Two-Building Development
43ded2e8-5dcf-5174-b553-a4a04aaeebe3
status_age_days_at_review80 → 81
projectsEdgeCore Mesa data center campus
441174d1-4dab-5b80-bfb2-76062cf675aa
status_age_days_at_review512 → 513
projectsAkashi Astana Phase 1 Current Build
44130f9f-95af-5f19-9fcf-47aabd3a5c8b
status_as_of2026-07-21 → 2026-09-24
projectsAkashi Astana Phase 1 Current Build
44130f9f-95af-5f19-9fcf-47aabd3a5c8b
status_age_days_at_review86 → 22
projectsAkashi Astana Phase 1 Current Build
44130f9f-95af-5f19-9fcf-47aabd3a5c8b
status_evidence_idad6f9a56-ffa6-527d-bcd3-a7d8932c31b9 → 3f589ad1-0d29-507c-ace0-9b80078417a1
projectsAkashi Astana Phase 1 Current Build
44130f9f-95af-5f19-9fcf-47aabd3a5c8b
status_source_urlhttps://akashi.cloud/construction-progress/ → https://akashi.cloud/news/astana-data-center-campus-2026/
projectsGoodman LAX01 First-Site Current Development
447b19d9-b89b-59a6-9931-824aa1781fb0
status_age_days_at_review107 → 108
projectsQTS Calatorao data center campus
46434a5c-4980-5f79-ac83-000783b60566
status_age_days_at_review414 → 415
projectsBox2Bit Epilon data center campus (Épila)
46abd4bf-bd8a-5525-9388-c938807fe2f0
status_age_days_at_review122 → 123
projectsRed Admiral data centre campus, Rochfortbridge
48458229-1481-521a-8ee4-edcc2d7408bc
status_age_days_at_review6 → 7
projectsBitdeer Wenatchee 2026 AI Conversion Site Preparation
484cf452-3a8f-5574-8003-a5b3f693c5d2
status_age_days_at_review86 → 87
projectsPowerHouse 95 data center campus
48d82a4f-46ea-5641-a650-b6e147b30ae6
status_age_days_at_review6 → 7
projectsAdaniConneX Pune PNQ04 Current Build
48eb54d5-dd3f-51a3-aeed-1ddce1949763
status_age_days_at_review136 → 137
projectsSakura Ishikari Data Center Existing Operations
490119c4-a270-5e7f-8488-8e0a907cd787
status_age_days_at_review79 → 80
projectsxAI MACROHARDRR data center (Southaven)
493361d4-686f-5f75-af07-7f95dcf81323
status_age_days_at_review76 → 77
projectsSynapse Data Center (Olds)
4a0d8f6f-b848-5650-a479-4f0caee97fa1
status_age_days_at_review6 → 7
projectsProject Sail (Prologis data center campus, Coweta County)
4a2847d7-f84f-5f89-a4c2-ee832e1f6cad
status_age_days_at_review189 → 190
projectsRowan Project Temple
4a2a09d1-1ace-5ff8-a80f-89996cda5799
status_age_days_at_review139 → 140
projectsAlto Infrastructure SP01 Phase 1 10 MW Critical IT
4a934222-f3af-5945-bb46-b98bfaef89b7
status_age_days_at_review98 → 99
projectsPW Digital Gateway
4ac7a0d0-0faf-50c0-bed8-08d54e0bc62b
status_age_days_at_review103 → 104
projectsfirstcolo FRA7 Current Build
4afd2551-1442-5f67-a1d9-0d245835088d
status_age_days_at_review122 → 123
projectsScala Data Centers Tamboré Campus
4ea35229-9824-5086-8441-310876ea8911
status_age_days_at_review350 → 351
projectsWBS Power Baltic Data Center Campus, Lublewo
4eea4b6a-9f71-5c9f-81bb-ae597972ddd5
status_age_days_at_review205 → 206
projectsGreen Mountain FRA-Mainz Current Three-Building Development
4eeb97fa-8e1d-53de-ae86-eebc40e97d6f
status_age_days_at_review86 → 87
projectsNiger National Data Center PK5 Current Build
4f39070f-83dd-557a-a1b0-88408f56c1fb
status_age_days_at_review119 → 120
projectsGoodman FRA02 Phase 1 Current Development
4f86e285-bcf1-537b-b31e-8af7b27ed556
status_age_days_at_review107 → 108
projectsHUMAIN Al-Saad hyperscale AI data centre campus
4f8a32cf-b64b-51b4-8758-368320eb441d
status_age_days_at_review18 → 19
projectsDatum FRN2 Data Centre Building
50d0a2d0-6726-5641-88bb-e0b39fa1a4dc
status_as_of2026-09-04 → 2026-10-07
projectsDatum FRN2 Data Centre Building
50d0a2d0-6726-5641-88bb-e0b39fa1a4dc
status_age_days_at_review41 → 9
projectsDatum FRN2 Data Centre Building
50d0a2d0-6726-5641-88bb-e0b39fa1a4dc
status_evidence_id1fc0d769-bf87-5ef6-b003-fdcbbb01644d → ad11c758-affb-5446-94d4-0f519463414e
projectsDatum FRN2 Data Centre Building
50d0a2d0-6726-5641-88bb-e0b39fa1a4dc
status_source_urlhttps://www.datum.co.uk/insights/news/frn2-construction-update/ → https://www.datum.co.uk/insights/news/finalist-hampshire-business-awards-2026/
projectsOME Data Center07 / DC5 Building B
510a8216-64d9-5626-992a-3ca10f40fb90
status_age_days_at_review30 → 31
projectsNTT Global Data Centers Tokyo TKY12 campus, Shiroi
511bfd88-0355-5080-b5ef-5a39ec51dfd8
status_age_days_at_review176 → 177
projectsRio AI City (Elea Data Centers)
51f3ec57-401e-5060-9d04-c2dfdfee6b1f
status_age_days_at_review6 → 7
projectsACF CR4 extension
52b09d3a-44ac-5836-9724-7df5c69687bf
status_age_days_at_review23 → 24
projectsDansk Data Center 1 Current Build
52d209cc-c8cd-5f8a-8337-cd887187f383
status_age_days_at_review63 → 64
projectsGoogle Kansas City data center campus (Hunt Midwest Business Center)
52e21086-11ad-588d-a8a8-d9525e5e4744
status_age_days_at_review6 → 7
projectsSoftBank-Sesterce Bosquel AI data center
53a18106-0c3f-5249-8717-107230729abc
status_age_days_at_review136 → 137
projectsdataR Rellingen Current Construction
5443b4c1-09dc-5f14-a9a3-ec32c05602fb
status_age_days_at_review90 → 91
projectsDataBank Red Oak First-Phase Current Construction
546bf83f-2bb4-5539-b576-6b7100981420
status_age_days_at_review81 → 82
projectsDeutsche Telekom Industrial AI Cloud, Munich Tucherpark
54782d37-d21e-5ddf-990b-a578130ac9d0
status_age_days_at_review253 → 254
projectsJiujiang University — Danfengyuan Campus Data Centre
559170a8-c643-55e7-98cf-7a6d5855acff
status_age_days_at_review15 → 16
projectsHUMAIN Dammam AI data centre
55a2bfbb-45b2-5d51-bc40-4cc74d88ccfd
status_age_days_at_review415 → 416
projectsMicrosoft Middenmeer Campus West expansion (Agriport Plot B)
55df6642-2ef8-5b72-a965-996a28bdfb24
status_age_days_at_review204 → 205
projectsAWS Walqa Current Data Center Build
55f4eb88-750d-5aa5-b4cb-bd5b8e746fe6
status_age_days_at_review112 → 113
projectsMicrosoft Union City data center campus (EdgeConneX)
561d28db-c1e2-5bbc-bda9-e10cbee90d7d
status_age_days_at_review70 → 71
projectsGreen Campus ZRH1 Data Center 4
58129708-0b52-5984-afbc-f8f38e085df1
status_age_days_at_review87 → 88
projectsCyrusOne FRA7 Current Multi-Building Development
58f9a985-bfa8-521c-ab85-132aec6799ed
status_age_days_at_review125 → 126
projectsTeraco CT1 Rondebosch Expansion
59a74e45-2dd2-5204-9c65-5430e8fc3148
status_age_days_at_review90 → 91
projectsDataOne Vineland Phase 2 Expansion Current Build
5ace12f8-658e-5956-9173-d78e625d4df9
status_age_days_at_review69 → 70
projectsSkygard OSL1 Phase 2
5ae9f639-4de6-5ce4-af8d-a40d6f8a3bec
status_age_days_at_review121 → 122
projectsQTS Cambois 2026 Earthworks
5b11c034-5a3b-5e5d-bc6a-b7122e21fbec
status_age_days_at_review106 → 107
projectsAscenty Sumaré 3
5b52a118-2f46-5f43-b308-a3237e99e065
status_age_days_at_review140 → 141
projectsQTS York County Initial-Phase Building 1
5b758548-2a2a-5643-9ebb-d8381bbd2c52
status_age_days_at_review107 → 108
projectsCSC LUMI-AI Data Center Current Build
5bfb4ad8-a8f4-5937-9242-a96f9292c385
status_as_of2026-08-20 → 2026-09-03
projectsCSC LUMI-AI Data Center Current Build
5bfb4ad8-a8f4-5937-9242-a96f9292c385
status_age_days_at_review56 → 43
projectsCSC LUMI-AI Data Center Current Build
5bfb4ad8-a8f4-5937-9242-a96f9292c385
status_evidence_idf6f13bec-804c-554b-ba4b-a3df91b37eb4 → 58016e37-11f6-5be9-9668-a403bc208884
projectsCSC LUMI-AI Data Center Current Build
5bfb4ad8-a8f4-5937-9242-a96f9292c385
status_source_urlhttps://csc.fi/en/news/csc-strengthens-the-future-of-kainuu/ → https://csc.fi/en/news/lumi-ai-factory-data-center-construction-progresses-in-kajaani/
projectsCDC Eastern Creek EC6 Current Build
5c366d64-4bb5-5c28-ab62-ec20d60fb31a
status_age_days_at_review86 → 87
projectsApplied Digital Polaris Forge 2
5c691ba6-a630-5ab4-a45d-4d676e3e4d53
status_age_days_at_review8 → 9
projectsBoda Qianhai No. 1 Operating Campus
5ce2d8b1-9a5d-576d-929e-c441774aac87
status_age_days_at_review50 → 51
projectsEni and Khazna AI data center campus, Ferrera Erbognone
5d11dbb6-e8aa-5602-9c7c-8997b1c620c1
status_age_days_at_review66 → 67
projectsLEITWERK BADEN CLOUD Lahr Data Center Current Build
5e0d1954-690d-51cb-816a-88cec595f51a
status_age_days_at_review118 → 119
projectsBitdeer Fox Creek energy and computing facility
602d4e58-abef-54a7-b8f6-894a714e7174
status_age_days_at_review66 → 67
projectsAWS Thane Balkum & Majiwada Data Centre EC 477127 Current Build
60485ece-bd7e-5f82-9f1b-6e271b8dcf45
status_age_days_at_review141 → 142
projectsMeta Bowling Green data center
619c5358-cf99-5e82-a690-4ae5c58f07f1
status_age_days_at_review6 → 7
projectsStargate Abilene (Crusoe campus on Lancium land)
632aad8a-8c12-5a02-bd17-1138e6b03b6c
status_age_days_at_review10 → 11
projectsMicrosoft Kirkkonummi First Datacenter Building
64289119-458d-5fc9-bf51-5af6097220eb
status_age_days_at_review111 → 112
projectsSK AI Data Center Ulsan
64f6ec20-7a91-530a-85f2-7748b0e320f8
status_age_days_at_review31 → 32
projectsCoreSite DE3
65e8849e-2ebe-5d58-be63-299cbbcf8d23
status_age_days_at_review87 → 88
projectsMicrosoft Zaragoza (Puerto Venecia) datacenter campus
6788c655-d9ed-520c-8012-56d246d29a0c
status_age_days_at_review41 → 42
projectsBitdeer Clarington data center site
6799aac4-c4f8-5902-b8ae-2fffb6fa893d
status_age_days_at_review66 → 67
projectsNEXTDC S7 Sydney
688df4a2-dc56-5cde-901a-87c87a08137e
status_as_of2025-12-05 → 2026-08-31
projectsNEXTDC S7 Sydney
688df4a2-dc56-5cde-901a-87c87a08137e
status_age_days_at_review314 → 46
projectsNEXTDC S7 Sydney
688df4a2-dc56-5cde-901a-87c87a08137e
status_methodimported_documented_status → authoritative_project_announcement
projectsNEXTDC S7 Sydney
688df4a2-dc56-5cde-901a-87c87a08137e
status_evidence_idba2d3717-6fc9-5378-b316-250d91634f00 → 0857cf0b-1e12-5d38-879b-09b93a544148
projectsNEXTDC S7 Sydney
688df4a2-dc56-5cde-901a-87c87a08137e
verification_postureimported_source_record → authoritative_project_record_plus_scoped_location
projectsNEXTDC S7 Sydney
688df4a2-dc56-5cde-901a-87c87a08137e
status_source_urlhttps://www.nextdc.com/news/building-the-next-generation-of-sovereign-ai-infrastructure-in-australia → https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-113934740%2120260831…
projectsNanjing University of Information Science and Technology — Changwang Building Data Centre
69dcda22-5b08-5ec7-a94b-43662c627976
status_age_days_at_review27 → 28
projectsRange Hong Kong Sandy Ridge Campus Current Infrastructure Build
6a3cb870-eb89-5d4b-a486-44eb7d10f8b0
status_age_days_at_review107 → 108
projectsKai Shin Satsumasendai AI Data Center — commercial campus
6a7d396b-9e80-516a-acd4-e3b8dde51614
status_age_days_at_review89 → 90
projectsEnecom Hiroshima Data Center Existing Operations
6a90d22d-a459-5781-bee3-0f28f1fb17eb
status_age_days_at_review14 → 15
projectsBrookfield AI center, Strängnäs
6aa46e28-dd40-513b-8722-f514b6503b02
status_age_days_at_review498 → 499
projectsLake Mariner CB-5 Current Build
6b11de63-a6b0-5513-87a1-b77ff3b71bfb
status_age_days_at_review71 → 72
projectsEdgeCore AS02 Data Center
6b62c459-dc75-5f31-87d4-d6dbf47de8b0
status_age_days_at_review106 → 107
projectsHighreso Kagawa Takamatsu Existing Operations
6daf7e34-6683-5158-98a2-ddd657edc7cb
status_age_days_at_review21 → 22
projectsOracle Project Jupiter Doña Ana County Current Campus Build
6f0acd88-cd04-5f3f-915c-48a71fd51f39
status_as_of2026-09-14 → 2026-10-13
projectsOracle Project Jupiter Doña Ana County Current Campus Build
6f0acd88-cd04-5f3f-915c-48a71fd51f39
status_age_days_at_review31 → 3
projectsOracle Project Jupiter Doña Ana County Current Campus Build
6f0acd88-cd04-5f3f-915c-48a71fd51f39
status_evidence_id14a5995c-d88f-58cc-90f1-32f1639dd609 → f7a09008-1413-50b2-b8e3-ce7800a05003
projectsOracle Project Jupiter Doña Ana County Current Campus Build
6f0acd88-cd04-5f3f-915c-48a71fd51f39
status_source_urlhttps://www.oracle.com/news/announcement/project-jupiter-statement-on-construction-permitting-2026-09-14/ → https://www.oracle.com/news/announcement/project-jupiter-is-expected-to-generate-13-billion-in-economic-impact-2026-10-…
projectsKobe Former Conveyor Tunnel Data Center Initial Development
6f5f4bba-93fd-534e-b0bb-e4dc996cd8bc
status_age_days_at_review9 → 10
projectsCore Scientific Pecos Initial HDC Current Build
709cd37b-7f3a-5313-b3e2-a18ddc0885ec
status_age_days_at_review135 → 136
projectsCrusoe and Lancium Childress AI data center campus
715ba9aa-f36a-5afb-b266-caeb7681b54e
status_age_days_at_review92 → 93
projectsKAO Data KLON-03 Data Centre Building
7206a400-093d-5c92-b1c5-c4243807de29
status_age_days_at_review142 → 143
projectsGoodman HKG10 Current Redevelopment
726d6e35-8381-58ae-8dcd-eeb9ae23583a
status_age_days_at_review30 → 31
projectsColt Frankfurt 3 Current Facility Build
7352e9b5-ecec-5497-8c62-3e6a8c7bd012
status_age_days_at_review88 → 89
projectsMicrosoft Pecos datacenter campus
735e570e-2923-5425-a0af-2a13e94f49e3
status_age_days_at_review105 → 106
projectsPBOC Shanghai Same-City Data Centre — Jindianyun Retrofit
74c7be7b-754b-5b0b-8d26-7134fa7a1220
status_age_days_at_review5 → 6
projectsPrometheus Hyperscale Evanston campus
74d6b0be-d450-509d-a406-ddfed7ede756
status_age_days_at_review115 → 116
projectsUbitus Maizuru AI Data Center Development
75484d01-aa58-5d95-8834-91103b8af933
status_age_days_at_review36 → 37
projectsSoftBank Osaka Sakai AI data center
75596cc6-0434-596d-be35-53be39de9c0a
status_age_days_at_review114 → 115
projectsBridge Data Centres Chonburi hyperscale campus
755ec57c-df00-5ee2-a290-9997607440b4
status_age_days_at_review359 → 360
projectsBoda Langfang No. 2 Phase 1
760bbd20-e137-5015-9956-1d5b17000e18
status_age_days_at_review86 → 87
projectsRIKEN Fugaku NEXT New Computer Building
760ff149-f1e1-5fbb-b4a8-9944c1b9cf88
status_age_days_at_review2 → 3
projectsMonarch Point Pleasant Current Site Preparation
762397cd-ffc7-55c2-936e-af38cb8d4d0c
status_age_days_at_review93 → 94
projectsatNorth SWE04 Sollefteå mega site
77b8badc-29e2-55ce-b570-5d4387e30505
status_age_days_at_review121 → 122
projectsVantage Data Centers Johor campus (JHB1), Sedenak Tech Park
77f10b6a-00c1-5bf7-974e-d4dc4467b35e
status_age_days_at_review6 → 7
projectsCyrusOne Bosque County data center campus (Thad Hill)
79276528-66df-572a-8baf-0afce2bb01e4
status_age_days_at_review346 → 347
projectsCrusoe and Tallgrass AI data center campus near Cheyenne (Project Jade)
7a05f519-bf3a-5423-bd7f-fcb8e1cd6c0f
status_age_days_at_review448 → 449
projectsTeraWulf Muskie Data Campus
7a5658df-f9c8-55e3-8623-b1a0fa40ce1d
status_age_days_at_review10 → 11
projectsKDDI Osaka Sakai Existing Operations
7a9f2968-2fd7-5b37-923c-20f616c3dea1
status_age_days_at_review79 → 80
projectsMERLIN Edged Bilbao-Arasur Building 2 Current Build
7ac977cb-cbe2-5dfd-b058-f26707f86b6c
status_age_days_at_review107 → 108
projectsOME Data Center04 Shinmachi9-A Building
7b86e3a5-3492-5bb1-b47c-2010427939cd
status_age_days_at_review92 → 93
projectsQTS Fayetteville campus
7c43c342-562c-5d46-b793-39a4dd2a8cc0
status_age_days_at_review328 → 329
projectsMicrosoft Mount Pleasant Durand Avenue datacenter campus
7c5eed16-f5f1-515a-b9ee-b7c30754fc10
status_age_days_at_review106 → 107
projectsatNorth FIN04 Phase 1
7c7b8437-ca56-55a0-aa36-54155f43760e
status_age_days_at_review86 → 87
projectsGoogle Fort Wayne data center
7c9397d2-971c-5d1e-ad58-210d19777a37
status_age_days_at_review6 → 7
projectsHomer City Energy Campus
7d6333d2-26e6-548c-979a-324c7113281b
status_age_days_at_review41 → 42
projectsThe Barn Stargate Current Data Center Build
7d936c4e-29f2-592f-984b-61f5d6367fc8
status_age_days_at_review17 → 18
projectsMeta Richland Parish data center (Hyperion)
803e9da5-cd1e-5849-813c-fe7c5b5f126b
status_age_days_at_review93 → 94
projectsTBC Partners Cambois data centre campus
81d20134-d073-5e0c-ad1c-7f8a97f2dadb
status_age_days_at_review58 → 59
projectsIron Mountain LON-3 25 MW Build
825dd9ee-ffe9-525e-8d9f-ec8e370d9944
status_age_days_at_review107 → 108
projectsMega D.C. MDCIL-1 Modi'in Phase B Current Build
82f20665-aa7b-51d5-b303-ddf63792d77b
status_age_days_at_review107 → 108
projectsCDC Brooklyn Remaining Facilities Current Build
83efe2e8-3b4b-5260-b4ca-d1dbc653b792
status_age_days_at_review86 → 87
projectsIIJ Matsue Existing Operations
853ee693-9217-5ebe-b59a-b13933cdecfb
status_age_days_at_review69 → 70
projectsEdgeCore Louisa County campus
8560b48f-07cb-54c8-8b8d-163dc196caee
status_age_days_at_review6 → 7
projectsHaoyang Langfang No. 1 Existing Operations
85adb51e-863a-5c4b-9660-089495964ccb
status_age_days_at_review63 → 64
projectsEdged Council Bluffs First Data Center
85cb6e56-ec73-5685-82e7-15e4ef96106b
status_as_of2026-07-17 → 2026-09-11
projectsEdged Council Bluffs First Data Center
85cb6e56-ec73-5685-82e7-15e4ef96106b
status_age_days_at_review90 → 35
projectsEdged Council Bluffs First Data Center
85cb6e56-ec73-5685-82e7-15e4ef96106b
status_evidence_idcab7dc15-ee5d-56ec-8e4c-3157a35255e7 → 40f4c650-ca98-590d-9218-56eb07b718cb
projectsEdged Council Bluffs First Data Center
85cb6e56-ec73-5685-82e7-15e4ef96106b
status_source_urlhttps://www.linkedin.com/posts/edgedenergy_edgedus-councilbluffs-omaha-activity-7483966398021390336-wI13 → https://edged.us/news/edged-us-celebrates-topping-out-of-oma01-1-and-oma01-2-in-council-bluffs
projectsTSUBAME4 G4-A Data Center Existing Operations
85eabbee-ed90-5017-983f-b88d5a7fc133
status_age_days_at_review16 → 17
projectsMicrosoft L’Ancienne-Lorette Development Project
867d91cb-7a17-59db-a92e-4a50a499f54f
status_age_days_at_review129 → 130
projectsNEXTDC M4 Melbourne
869dffc7-22ea-5f40-8810-13d87c696908
status_age_days_at_review269 → 270
projectsMicrosoft Hebron Initial Site Preparation
86bcbcd1-702d-5afa-aeb8-1cb145224b97
status_age_days_at_review106 → 107
projectsHut 8 Beacon Point AI data center campus
86c83f59-88b9-5791-bc15-ab6c32f256a7
status_age_days_at_review72 → 73
projectsNEXTDC M4 Initial Early Works
8715738f-39ac-5058-a01a-b62758b49831
status_age_days_at_review107 → 108
projectsAker Nscale Korgen AI data center
88c15bf1-8080-55a3-b2cd-dbd795654bf3
status_age_days_at_review353 → 354
projectsGoogle Franklin Township data center proposal (Project Flo)
892af381-b656-528b-a9db-61013937174e
status_age_days_at_review388 → 389
projectsenvia TEL Leipzig2 Fourth Section Current Construction
898b0895-99d6-545b-8053-79813ae63ffa
status_age_days_at_review141 → 142
projectsNEXTDC S3 Incremental In-Progress Fit-Out
8a5fbd17-48b6-5484-8c37-ce406068bf3e
status_age_days_at_review107 → 108
projectsHut 8 River Bend AI data center campus
8aa8e9f5-915e-51f6-bc08-463822cf16f9
status_age_days_at_review10 → 11
projectsMorris Technology Park
8ac449d0-47a8-5735-a32a-d4eb2a6def53
status_age_days_at_review261 → 262
projectsAdaniConneX Noida data centre campus
8c2ed321-ddad-5bb1-ab38-bd5b66bf4f2b
status_age_days_at_review6 → 7
projectsFlexential Douglasville 2 Current Build
8c926b8f-0190-533b-aa7e-3223971b9e23
status_age_days_at_review58 → 59
projectsCEC Tokyo No.2 Existing Operations at Sunshine 60
8cb9ee0d-0538-574a-ac8b-04243e9c79b5
status_age_days_at_review71 → 72
projectsCore Scientific Pecos data center campus
8ce04eb2-b1ed-5375-a685-122f79fc2ee6
status_age_days_at_review79 → 80
projectsAmazon Web Services Hobart data center campus
8d08b021-e457-5102-9ef2-33528ad786d1
status_age_days_at_review51 → 52
projectsNscale Kvandal AI data center (Narvik)
8d1ed9d7-795d-55a8-b8cf-41e51579dd27
status_age_days_at_review43 → 44
projectsMeta Mesa Data Center
8d3985c2-7777-5c6b-9a7f-fcab6c9b6a4f
status_age_days_at_review622 → 623
projectsFlexential Parker Data Center Current Build
8dbc82d0-1a4d-5d8e-955e-c5e4973ea19e
status_age_days_at_review58 → 59
projectsTaylor Technology Campus (Big Watt Digital and PowerHouse)
8e72e640-c0e0-5e58-8a76-e53c011dcf92
status_age_days_at_review6 → 7
projectsCloudHQ GRU Campus (Paulínia)
8efbf742-c042-5872-9bbe-82d576865125
status_age_days_at_review190 → 191
projectsLübbenau Data Center Current Build
8f5c2434-0b2d-547e-ac2c-e25ddeefe1b7
status_age_days_at_review58 → 59
projectsVerne Mäntsälä Current Campus Development
8f8c241d-ee6b-5182-8a76-ebb101a3f4c2
status_age_days_at_review120 → 121
projectsCipher Barber Lake data center
8fc14c03-d70a-5634-81e4-883a2fd6eec9
status_age_days_at_review20 → 21
projectsxAI Colossus 2 (Memphis)
9002afae-5b81-5c8c-a6f9-4504c91e8624
status_age_days_at_review10 → 11
projectsBalico gas-powered data center campus, Pittsylvania County
908ba9ce-1e84-567b-926f-8d47d4d2a7ed
status_age_days_at_review547 → 548
projectsHexagon Data Center (Riyadh)
912a1942-9e25-5d1f-b3ce-7f39f60ca845
status_age_days_at_review167 → 168
projectsArt Data Centres Ennis campus
917342c6-069b-5678-bf52-e27fcf933a5a
status_age_days_at_review204 → 205
projectsPortus MUC2
9217888a-3e78-5b75-ac86-bd32ef026084
status_age_days_at_review140 → 141
projectsJefferson Lab Data Center (JLDC)
9283d3fe-3789-54c7-abf4-8bb757e29835
status_age_days_at_review125 → 126
projectsLancium Clean Campus Abilene Remaining Six-Building Expansion
938feeec-a323-56e0-b6ce-2590fe58e623
status_as_of2026-06-04 → 2026-07-15
projectsLancium Clean Campus Abilene Remaining Six-Building Expansion
938feeec-a323-56e0-b6ce-2590fe58e623
status_age_days_at_review133 → 93
projectsLancium Clean Campus Abilene Remaining Six-Building Expansion
938feeec-a323-56e0-b6ce-2590fe58e623
status_evidence_idc721a602-e557-5a4d-8518-d5fce69a64d2 → 2659d4c4-2dad-5902-9c7e-f9365e4ac9a1
projectsGoogle Journey data center campus (Haskell County)
93e5705d-3c86-524c-8089-0868d13bbd0d
status_age_days_at_review112 → 113
projectsFermi America Project Matador campus
94562977-e3af-5f59-bee1-896ee8db20f6
status_age_days_at_review17 → 18
projectsStart Campus SIN02 Current Facility Build
94c0f50d-843b-57cd-bfcd-4bd3b7b9d9f0
status_age_days_at_review114 → 115
projectsHut 8 Beacon Point First Phase 352 MW Critical IT Lease
9563b94b-4d68-5f38-b2b2-ce63346ebbe8
status_age_days_at_review72 → 73
projectsNEXTDC KL1 Remaining In-Progress Fit-Out
95b33a98-a85e-57af-b18d-6811a7fd3b20
status_age_days_at_review107 → 108
projectsMicrosoft Mount Pleasant International Drive datacenter campus
96848e3f-da64-53c8-be33-bf5c9cd2109a
status_age_days_at_review261 → 262
projectsAdaniConneX Navi Mumbai data centre campus
96c80c6f-de7a-5e5c-b9b1-fc1bb7c738a6
status_age_days_at_review6 → 7
projectsMega D.C. MDCIL-5 Idan HaNegev Phase A Current Build
96d7988b-a1e7-517c-9218-462524058a80
status_age_days_at_review107 → 108
projectsAdaniConneX Hyderabad data centre campus
9753db27-dba7-5bba-933f-499d9b7ffa72
status_age_days_at_review6 → 7
projectsNscale Kvandal Initial 25 MW EPC Current Build
97f12a4b-6526-5c76-94b3-6562420ffe99
status_age_days_at_review101 → 102
projectsReliance Jamnagar AI-enabled data centre for Meta
987638c1-43b0-5075-a91a-f02ac2f007cc
status_age_days_at_review127 → 128
projectsChina Mobile Beijing International Information Port No6 / C18 Data Center Development
98aa0068-2100-53d4-b356-b89ef285efb1
status_age_days_at_review44 → 45
projectsAST Jāņciems Fit-out After Building Completion
98e47ac5-8576-53f7-ab71-9f3d683b5ec5
status_age_days_at_review110 → 111
projectsGoodman SYD01 Current Single-Building Development
99fa93f5-9f63-5576-b036-2ee8086032a3
status_age_days_at_review87 → 88
projectsBeacon AI Centers Heartland campus (Sturgeon County)
9a4afe64-8789-5cee-8947-61a12f8966a8
status_age_days_at_review219 → 220
projectsatNorth ICE02 Phase 2 Expansion
9be0ab88-c727-5dbc-8a12-e2443878b69f
status_age_days_at_review86 → 87
projectsCDC Beard BE1 Current Data Center Build
9c34c305-5149-5961-b88f-648da82351f7
status_age_days_at_review87 → 88
projectsCDC Laverton Current Build
9cceddca-71bc-52f2-a417-e9fdf0d7faa3
status_age_days_at_review86 → 87
projectsSify Chennai 02 data center campus, Siruseri
9d173225-d19b-5566-ab43-b319b0434236
status_age_days_at_review364 → 365
projectsUniversity of Science and Technology of China — Gaoxin Campus Data Centre
9d1a545f-6939-5ea7-aae1-ba9e834b1ba9
status_age_days_at_review38 → 39
projectsTeraWulf Justified Data campus (Hawesville)
9dbfd718-7b41-58b1-bb46-0138b96aeca8
status_age_days_at_review52 → 53
projectsNTT Dallas TX4 Data Center
9ddf0df3-e40c-515f-9468-ed78f063513b
status_age_days_at_review137 → 138
projectsAligned Project Phoenix / PIT-01 Campus Development
9ecf2558-5470-501a-9d83-5bf628979837
status_age_days_at_review35 → 36
projectsBitdeer and Geis Shalersville AI data center campus
9ed96427-8138-552b-9f88-3b1fbeaa341b
status_age_days_at_review8 → 9
projectsNxtra Eko Atlantic Lagos Current Facility Build
9fe862f6-ace2-5f5d-9c90-486fa4622982
status_age_days_at_review84 → 85
projectsPure DC AMS01 Data Hall Development
a072994f-1b7d-5cc8-98b7-bc79c666c6c3
status_age_days_at_review141 → 142
projectsK2 hyperscale data center campus, Zibido San Giacomo and Lacchiarella
a0ee0f70-6708-5a9c-8b50-a61e93a5e501
status_age_days_at_review58 → 59
projectsnoris network NBG6 BA3 Modular Expansion
a1390e66-5b95-568b-869b-b9413c56f8ce
status_age_days_at_review63 → 64
projectsCompass Datacenters Hoffman Estates campus
a1696719-0fe3-52ce-ad37-43e6d2215f4f
status_age_days_at_review9 → 10
projectsHuizhou University — Modular Data-Centre Room Upgrade
a1f0e0ac-ee34-552a-995c-d2aeb6989688
status_age_days_at_review0 → 1
projectsMeta Gallatin Data Center
a203f1e3-768b-5094-b606-9c494490e0a6
status_age_days_at_review699 → 700
projectseStruxture CAL-3 Initial Build
a225d046-5d72-5a1f-bf4b-ba454f713a49
status_age_days_at_review86 → 87
projectsMihta Askiy Data Centre
a2de1edb-c874-5d78-902a-e174a5ecd03e
status_age_days_at_review6 → 7
projectsVantage Data Centers Cyberjaya II campus (KUL2)
a31a1552-7be0-58e9-8097-4083d11175dd
status_age_days_at_review800 → 801
projectsKCCS ZED Ishikari Existing Operations
a346af4c-3d11-5ed8-ad5e-1b6c6b187458
status_age_days_at_review79 → 80
projectsQuantum Frederick data center park
a490f00a-8b75-5547-b0e9-5fb3b6e5f616
status_age_days_at_review217 → 218
projectsCyrusOne Freestone County data center campus
a5618437-38a6-5fd0-a340-56ab10f1e97b
status_age_days_at_review6 → 7
projectsAWS New Carlisle data center campus (Project Rainier)
a5b2cd4f-b857-573e-82b8-6edc1e776eec
status_age_days_at_review84 → 85
projectsCloudHQ QRO Campus (Querétaro)
a7a29c6e-70aa-5f7b-b172-d1abe208715e
status_age_days_at_review380 → 381
projectsChina Telecom Wuqing Jing-Jin-Ji — Existing Operational Facilities
a7e358de-2d71-502e-81dd-441e02565024
status_age_days_at_review31 → 32
projectsQScale Q01 Building B
a848e771-2e45-55fb-8d43-db0885bb824f
status_age_days_at_review133 → 134
projectsVantage Data Centers Villanueva de Gállego campus
a8c0727c-ed59-5641-8856-e4eac08a5cf0
status_age_days_at_review209 → 210
projectsLambda Kansas City AI factory
a95db60b-fb99-5f16-ad4a-c763e4714041
status_age_days_at_review352 → 353
projectsMicrosoft La Muela datacenter campus (Aragón)
a9ca22ae-d872-5122-a052-e5c9ec410abd
status_age_days_at_review41 → 42
projectsMERLIN Edged MAD02 Site Preparation
aa2dc8a4-52d8-5519-b23a-2ff0313db9e3
status_age_days_at_review107 → 108
projectsSTT Jakarta 3
aa93c84a-17d6-5092-bf57-686f7e1ab4a4
status_age_days_at_review127 → 128
projectsAirTrunk JHB1
abb5573d-8211-5781-be5c-50c8b27d4fe8
status_age_days_at_review797 → 798
projectsCRA Prague Gateway DC Current Campus Build
acf9eda7-3b44-5e9b-8c40-62783a7e0aa0
status_as_of2026-08-20 → 2026-09-09
projectsCRA Prague Gateway DC Current Campus Build
acf9eda7-3b44-5e9b-8c40-62783a7e0aa0
status_age_days_at_review56 → 37
projectsCRA Prague Gateway DC Current Campus Build
acf9eda7-3b44-5e9b-8c40-62783a7e0aa0
status_evidence_id3cb5d028-a110-558f-b9c3-69f22e0c699a → f95b2632-6431-5156-b9a2-e8be618bd45c
projectsCRA Prague Gateway DC Current Campus Build
acf9eda7-3b44-5e9b-8c40-62783a7e0aa0
status_source_urlhttps://www.linkedin.com/embed/feed/update/urn:li:activity:7496145983718969344 → https://www.cra.cz/tiskove-centrum/datova-centra/ceske-radiokomunikace-a-polarise-se-dohodly-na-spolupraci-v-ramci-dato…
projectsFlexential Hillsboro 5 Current Build
ad57807a-f6b6-55f9-b26f-acd194e12880
status_age_days_at_review58 → 59
projectsNEXTDC M2 Incremental In-Progress Fit-Out
ad5f9b2b-80bf-5580-92f2-0f53473c882d
status_age_days_at_review107 → 108
projectsBorealis Blönduós Expansion Current Build
adc32529-cea1-5d06-86de-334e63433be6
status_age_days_at_review114 → 115
projectsCipher Black Pearl data center
ade90a9a-b55b-503e-a8b9-d2f8340a81d6
status_age_days_at_review72 → 73
projectsSabey SDC Austin Building B Current Build
ae484949-f575-5553-ad33-bc1f96eab345
status_age_days_at_review121 → 122
projectsQTS Cedar Rapids Current Campus Development
ae6f1b86-660b-54e9-bdb0-d29bfeedc551
status_age_days_at_review92 → 93
projectsBitdeer Weathersfield (Niles) development site
b02620fe-58af-53a3-91fc-855e2454512c
status_age_days_at_review66 → 67
projectsDigital Park Fechenheim UW04 Substation
b0588082-53ae-577a-b989-667b8f9f171d
status_age_days_at_review105 → 106
projectsGoodman MAD01 Current Development
b0be5071-aff0-5470-a041-a0be3cc8385a
status_age_days_at_review107 → 108
projectsTeton Digital Black Bear power and data centre campus (Swan Hills)
b10fbc1b-2689-5864-989c-b36b13abb9ad
status_age_days_at_review22 → 23
projectsQTS Vimercate data center campus
b19d5d3a-c2cc-5cea-9698-fe07ac125c8e
status_age_days_at_review6 → 7
projectsNTT Munich 2 Operating Campus
b1e5c691-f5e1-5483-94f2-e290125c4e6a
status_age_days_at_review8 → 9
projectsEquinix MU4 Phase 3
b284fbeb-8cd9-5448-860d-b4f69bb8bd7a
status_age_days_at_review91 → 92
projectsDigital Edge CGK1
b2e4945f-3d75-5d9b-b2bb-d65deb74c405
status_age_days_at_review129 → 130
projectsMicrosoft Lévis Charny Development Project
b3656b35-f3ad-5119-8918-ac5237bf2a7f
status_age_days_at_review129 → 130
projectsNTT Frankfurt 1 7.3MW Expansion
b3b98301-a692-5790-88e7-656d77e8fb69
status_age_days_at_review88 → 89
projectsCavour Hyperscale Campus (Trino)
b3d41aee-bf24-5299-97dd-2e16bc40012e
status_age_days_at_review80 → 81
projectsGreenergy Hüüru Data-Hall Expansion
b4349487-1879-5b90-9064-d1b86cb49850
status_age_days_at_review77 → 78
projectsRiot Rockdale AMD Expansion Phases 3 and 4
b4ff75a2-9d55-54ad-bf27-4c60b096eb0f
status_age_days_at_review66 → 67
projectsScala SFORPF01
b5625b8f-5e00-5fbe-b313-ba7adb980583
status_age_days_at_review72 → 73
projectsAWS Fayette County data center site
b649f6b4-e5be-5d52-9b44-0273c14cbea3
status_age_days_at_review660 → 661
projectsVIRTUS Wustermark campus
b6d175dc-d92a-56ca-a1a7-85306c9de22a
status_age_days_at_review136 → 137
projectsAbernathy HPC campus (TeraWulf and Fluidstack joint venture)
b6f0ed21-2ab2-51e2-971e-4e9512279101
status_age_days_at_review230 → 231
projectsIREN Childress data center campus
b74385b8-0724-5b4d-b192-4aa5a1c45885
status_age_days_at_review49 → 50
projectsCoreWeave/Chirisa Lancaster Greenfield Phase 1 Adaptive-Reuse Project
b75695b9-38e3-58ec-baf2-039179ab353a
status_age_days_at_review85 → 86
projectsSTT Fairview data center campus
b75df57e-ef16-50f9-b1d8-ae13bae596a5
status_age_days_at_review178 → 179
projectsDelta Forge 1 Current Construction
b7744ad5-aa48-5977-a70e-3d6a588f468d
status_age_days_at_review80 → 81
projectsGoogle Armstrong County data center campus (Crusoe Goodnight)
b7d85afa-fbc0-53d6-b19c-6e00c6639642
status_age_days_at_review14 → 15
projectsEdged Chicago ORD01-2
b8399bc6-5c72-5627-a035-4fea208cd287
status_age_days_at_review133 → 134
projectsProcergs Porto Alegre New Substation 6033-00
b91d994d-0f59-5ed8-ad74-20e4ba2251f3
last_observed_physical_statusunder_construction → mep_electrical
projectsProcergs Porto Alegre New Substation 6033-00
b91d994d-0f59-5ed8-ad74-20e4ba2251f3
status_as_of2026-07-01 → 2026-09-13
projectsProcergs Porto Alegre New Substation 6033-00
b91d994d-0f59-5ed8-ad74-20e4ba2251f3
status_age_days_at_review106 → 33
projectsProcergs Porto Alegre New Substation 6033-00
b91d994d-0f59-5ed8-ad74-20e4ba2251f3
status_evidence_id73bfac37-2316-515a-bae1-3bfb4d24c292 → a0010b49-7268-524e-b50b-0f472c1c4b9b
projectsProcergs Porto Alegre New Substation 6033-00
b91d994d-0f59-5ed8-ad74-20e4ba2251f3
status_source_urlhttps://www.procergs.rs.gov.br/upload/arquivos/202608/20132929-aporte2025-prestacaocontas-jul2026.pdf → https://www.procergs.rs.gov.br/geradores-e-equipamentos-da-nova-subestacao-de-energia-eletrica-sao-entregues-e-instalad…
projectsNebius Pajarila First Phase Current Build
b9ccc1e7-c2da-5822-82bc-b20be7d43dfe
status_age_days_at_review65 → 66
projectsQScale Q01 campus (Lévis)
b9f9191a-1f90-551d-a8b9-44e6f8833e96
status_age_days_at_review6 → 7
projectsTRG HOU2
ba5ddf33-10ec-5fb8-b880-98a04df096b8
status_age_days_at_review87 → 88
projectsAirTrunk JHB3 Johor Bahru
baa5ddbb-3439-5e4f-a03f-265b844b4460
status_age_days_at_review168 → 169
projectsWonder Valley AI data centre park (Alberta)
bb1b28fd-610b-5739-b928-e44f21cb6f1b
status_age_days_at_review6 → 7
projectsChina Telecom Shaotang Campus Development
bb2a6c51-4439-5bda-aa65-a5f7f9e14e98
status_age_days_at_review24 → 25
projectsCDC Maddington Current Build
bb8ba3ad-d563-5f84-a543-079a10264640
status_age_days_at_review112 → 113
projectsPage, Arizona data center site (Huntley LLC)
bc344b80-1656-5a9a-a788-a5f7cb59131e
status_age_days_at_review6 → 7
projectsChina Unicom Langfang Zhi Yun — Existing Operational Facilities
bd8714fe-60fb-5043-bac6-6b59af35a462
status_age_days_at_review31 → 32
projectsAmazon Falls Township Active Campus Buildout
bdfd522f-2d7e-5d1f-8e00-3c43b462ed27
status_age_days_at_review88 → 89
projectsGoodman PAR01 Phase 1 Current Development
be6d721d-f632-5c86-a057-78774604bc6c
status_age_days_at_review107 → 108
projectsChina Telecom Guizhou Information Park B5/B6 Civil Works
be874ef3-dd3e-54dd-be06-f01895ac6992
status_age_days_at_review25 → 26
projectsIron Mountain MAD-2 and MAD-3 20 MW Development
bf8d11a2-72a6-500d-a532-98fb73958c84
status_age_days_at_review107 → 108
projectsNebius Independence AI factory
c01906b8-f76a-5afe-ae86-ea56184443f3
status_age_days_at_review6 → 7
projectsNebius Birmingham AI factory (Lakeshore Parkway)
c01f2073-5c23-511c-9d85-80ad9345987a
status_age_days_at_review247 → 248
projectsGoodman HKG09 Current Redevelopment
c04bedc0-51b3-5d4d-996c-1d1e56de96c0
status_age_days_at_review92 → 93
projectsMeta Montgomery data center
c0f8dadf-2c3d-5176-b649-85363c06e1fa
status_age_days_at_review6 → 7
projectsDVZ Schwerin New Modular Data Center Current Build
c1016e49-7b45-52ff-8938-0bd01e78a7ad
status_age_days_at_review76 → 77
projectsODATA DC SP04 Phase 2 Expansion
c160d8d5-7572-53c2-8051-cd7990b1f771
status_age_days_at_review119 → 120
projectsMicrosoft Espoo Second Datacenter Building
c1af62b5-b9a2-5c15-a8a4-717e1a65ac05
status_age_days_at_review126 → 127
projectsQTS Aurora DEN1 DC2 Current Fit-Out
c23fe40c-0685-5cee-8fab-9c08575e6b27
status_age_days_at_review57 → 58
projectsNorthC Frankfurt1 (FRA01) Current Facility Build
c2ec8d08-3436-5bbc-af4e-4eb553297fe2
status_age_days_at_review27 → 28
projectsBitzero Namsskogan 2026 Power Infrastructure Expansion
c30aeadf-c2f6-58a5-a8b1-227868f477c1
status_age_days_at_review122 → 123
projectsOld Ocean Data Center (Nightpeak Energy)
c400f10b-b4a6-5824-987b-3ff8657fb0d3
status_age_days_at_review218 → 219
projectsAmazon Web Services King George County campus (Birchwood site)
c42e542c-bee8-54bc-9f79-9f03d98979ea
status_age_days_at_review6 → 7
projectsSoftBank Hokkaido Tomakomai AI Data Center
c4cf35bd-5452-551f-8b1c-bb88d2f2b35b
status_age_days_at_review72 → 73
projectsMicrosoft Etobicoke First Building Current Build
c4ffa53e-bb43-5af1-9e07-aa5045ea480b
status_age_days_at_review71 → 72
projectsSify Rabale data center campus (Mumbai 03), Navi Mumbai
c52dcc98-dfd2-5012-8703-5d9e24de51b2
status_age_days_at_review6 → 7
projectsData4 Hanau campus
c53b72b6-ff87-58eb-b74f-7082b159a513
status_age_days_at_review218 → 219
projectsCore Scientific Denton data center (CoreWeave)
c62aed61-a87f-57ab-b1a4-76d1867f73b9
status_age_days_at_review6 → 7
projectsDatagrid Makarewa Initial Horizontal Works
c71872a1-fc95-5d5b-8ee8-6b5082e974df
status_age_days_at_review58 → 59
projectsAmazon Salem Township Active Campus Buildout
c73ac912-e44d-5477-84f5-c5beb4813518
status_age_days_at_review88 → 89
projectsPrinceton Digital Group JC3 Greater Jakarta
c7671f1b-16fb-5d22-b002-93f28cea5585
status_age_days_at_review161 → 162
projectsNEXTDC M3 Incremental In-Progress Fit-Out
c789668b-ecf3-53b2-b23c-44151e199317
status_age_days_at_review107 → 108
projectsDigi Power X Columbiana Purpose-Built Flagship Vertical Build
c794c146-24e6-5cb8-8cd9-a12a266bba83
status_age_days_at_review100 → 101
projectsGalaxy Helios data center campus
c7adcc1a-b5ed-5df0-b28b-572b6d9dbc4b
status_age_days_at_review64 → 65
projectsDigital Edge EDGE2 Phase 3 Electrical and Mechanical Development
c7eebc15-358c-5985-9a48-16f53bdd4726
status_age_days_at_review107 → 108
projectsFlexBase New Technology Centre Current Build
c9b6bff7-09a3-599b-9c8c-49243461c0fb
status_age_days_at_review119 → 120
projectsMicrosoft Skelton Grange datacentre campus, Leeds
ca9b7a8f-2f71-5996-8ef1-66d4a2bfe2fa
status_age_days_at_review171 → 172
projectsKasi Cloud LOS campus (Lekki, Lagos)
cb66229f-70db-5cfc-95b3-f5a05a3e73bc
status_age_days_at_review149 → 150
projectsDayOne Imari Data Center Campus Development
cbbbbaa7-eb91-565b-af59-a181348ad761
status_age_days_at_review13 → 14
projectsSTACK Bossier Highway 3 Technology Park Current Campus Build
cbe074bd-68d8-59cb-aaf7-e21fa82b193f
status_age_days_at_review127 → 128
projectsCloud4Y Marfino Main Building Current Construction
cbe9c330-13a3-5d1f-a9ba-c981c31585a7
status_age_days_at_review136 → 137
projectsMicrosoft Mount Pleasant Second Datacenter Facility
ccb7fe0e-f94d-58ca-8d36-695a9cd48d56
status_age_days_at_review114 → 115
projectsatNorth NOR01 Haugaland mega site
ce6cee07-15ea-56c9-83d5-c0cdb18aa695
status_age_days_at_review128 → 129
projectsCyrusOne Aurora CHI2 Permanent Sound-Mitigation Capital Retrofit
cf028790-cea6-555d-a3bb-48e08ff78f3b
status_age_days_at_review56 → 57
projectsHyperco Loviisa Current Data Center Development
d024514a-30a3-514d-b65e-2743133f6800
status_age_days_at_review105 → 106
projectsMeta Sturgeon County Alberta Current Campus Build
d1538d73-e301-5203-9e49-924b20051374
status_age_days_at_review99 → 100
projectsDigital Edge SEL3 Phase 2
d2915b77-394c-5202-8c38-cbd3277121c7
status_as_of2026-07-09 → 2026-08-27
projectsDigital Edge SEL3 Phase 2
d2915b77-394c-5202-8c38-cbd3277121c7
status_age_days_at_review98 → 50
projectsDigital Edge SEL3 Phase 2
d2915b77-394c-5202-8c38-cbd3277121c7
status_evidence_id4319b4ff-25cd-51ce-bf9b-e17197ff1fbf → a2f3db3a-180c-5571-b6ca-3fd54db9677c
projectsDigital Edge SEL3 Phase 2
d2915b77-394c-5202-8c38-cbd3277121c7
status_source_urlhttps://news.skecoplant.com/board/19247 → https://news.skecoplant.com/board/19264
projectsApplied Digital Delta Forge 2
d2bf7339-8e09-50df-8229-96ad3f8fa358
status_age_days_at_review8 → 9
projectsxAI Colossus 1 (Memphis)
d2db6863-886a-5c16-b819-7f2cd95cd87e
status_age_days_at_review10 → 11
projectsBulk DK01 Current New Building Construction
d2e988cd-e878-5061-817e-0c1cda87f372
status_age_days_at_review107 → 108
projectsSify Noida 02 data center campus
d31725a8-2753-5d70-963d-320d4f6fbb61
status_age_days_at_review364 → 365
projectsMeta DeKalb Data Center
d3694f4b-3497-5f87-88aa-de8e9449c754
status_age_days_at_review1049 → 1050
projectsIIJ Shiroi Existing Operations (Phases 1 and 2)
d3d3a8ea-8444-585c-afa4-4a5016a44cd7
status_age_days_at_review69 → 70
projectsChina Telecom Lingang Information Park Phase 2.1
d456e2d4-2741-53e1-ae65-a2faf7d199ba
status_age_days_at_review31 → 32
projectsScala AI City (Eldorado do Sul)
d461c464-bedc-555a-a582-c6f96a0a2acc
status_age_days_at_review519 → 520
projectsChina Mobile Hohhot B25/B27 Expansion
d4f5ee02-4c8a-5252-97fd-e39f7add28bf
status_age_days_at_review5 → 6
projectsDC BLOX Palm Coast Approved First Building Current Construction
d5b84301-4f54-5958-a0d1-fd2c5a72cc5b
status_age_days_at_review118 → 119
projectsDataVita Lanarkshire AI Growth Zone campus (Chapelhall)
d63cbbf2-d501-5bf8-83d4-befc76c4bb39
status_age_days_at_review43 → 44
projectsProject Blue
d654ea2a-ea8e-564e-a1df-67f35d52ebbc
status_age_days_at_review174 → 175
projectsPrologis Trenton Project Mila Campus Construction
d6a6d399-4580-54f8-80de-1dc0854e4699
status_age_days_at_review56 → 57
projectsIron Mountain VA-9 Phase 1
d83dc321-220b-5c4c-b5af-ff1f4bc19a5d
status_age_days_at_review107 → 108
projectsCapitaLand DC Chennai Current Facility Build
d852bc01-c8e9-57c4-b469-9ff3ea1d8a5c
status_as_of2026-07-29 → 2026-10-15
projectsCapitaLand DC Chennai Current Facility Build
d852bc01-c8e9-57c4-b469-9ff3ea1d8a5c
status_age_days_at_review78 → 1
projectsCapitaLand DC Chennai Current Facility Build
d852bc01-c8e9-57c4-b469-9ff3ea1d8a5c
status_evidence_id1beede7f-9936-551b-a7b8-13a2d7ac1efa → fdf14fb8-dec6-58f7-9cca-2a210a7852c1
projectsCapitaLand DC Chennai Current Facility Build
d852bc01-c8e9-57c4-b469-9ff3ea1d8a5c
status_source_urlhttps://www.capitaland.com/content/dam/capitaland-newsroom/International/2026/july/clint-1h2026-results/2.%20CLINT%201H… → https://www.capitaland.com/content/dam/capitaland-newsroom/International/2026/october/cli-affirms-long-term-commitment-…
projectsCore Scientific Muskogee data center campus
d87a919b-df32-53fa-bc01-47b7f6f1dce9
status_age_days_at_review79 → 80
projectsMeta Cheyenne data center
da9fec8b-b7a1-54cb-afb9-7f534cbab584
status_age_days_at_review6 → 7
projectsGoogle Meitner Energy Center data center (Gray and Roberts counties)
db205e2d-f250-5c0b-861e-1c243f7be933
status_age_days_at_review133 → 134
projectsAirTrunk JHB4 Johor Bahru
db7fc7c1-cc03-5473-80b8-31b36c8224d5
status_age_days_at_review168 → 169
projectsAWS Salem Township Innovation Campus (Susquehanna)
dc6f83d9-dac5-563a-ba7e-ff18e27ba506
status_age_days_at_review6 → 7
projectsShenzhen Guangming Phase 2 LineShine Existing Operations
dcf186d3-4aef-5809-a85a-ab800da5b7cb
status_age_days_at_review31 → 32
projectsCampus AI Fouju
dd65fe26-5f6d-52e8-96b6-8709ca040b13
status_age_days_at_review44 → 45
projectsPowerHouse Louisville hyperscale campus (Camp Ground Road)
dd87fe4b-fdb0-5c4e-a906-70fda834e424
status_age_days_at_review63 → 64
projectsNational AI Computing Center, Solaseado (Haenam)
ddaae950-1e47-58e8-b57a-37aeed0eba7a
status_age_days_at_review73 → 74
projectsatNorth SWE02 Current Development
def7f329-a075-519e-bc4b-8f8126bc1901
status_age_days_at_review128 → 129
projectsJoliet Technology Center
def89e4b-c93d-5dc8-a955-edd8e51a1058
status_age_days_at_review206 → 207
projectsNXDATA-3 / NX-3 / BUH3
df2b8f33-9c46-5f6a-9853-b47474606979
status_age_days_at_review135 → 136
projectsAdaniConneX Pune data centre campus
df5ccb0c-2ab0-56fc-a260-71db9387c492
status_age_days_at_review78 → 79
projectsGoodman PAR02 Phase 1 Current Development
e1aeeee2-575c-5873-a96a-528a6c08b387
status_age_days_at_review107 → 108
projectsChina Mobile Plateau Big Data Center Phase 2 Build
e2c7ea58-17cc-594d-8b98-56ca08988c99
status_age_days_at_review43 → 44
projectsMeta Kuna Data Center
e375d86c-75a4-53f3-a80e-31aa6f32b616
status_age_days_at_review42 → 43
projectsTeraWulf Lake Mariner data campus
e389cd04-b538-5729-85a5-8e0b18e78002
status_age_days_at_review71 → 72
projectsNEXTDC GE1 Incremental In-Progress Fit-Out
e39b5191-4a78-5781-8944-24efaf944aa9
status_age_days_at_review107 → 108
projectsG42 and Microsoft Olkaria geothermal data centre campus
e3e31b3f-d0db-54ad-849f-126a4eae2868
status_age_days_at_review52 → 53
projectsIron Mountain AMS-2 10 MW Expansion
e3f1fc38-bc59-5373-803f-d5c86d817096
status_age_days_at_review107 → 108
projectsSTT Jakarta 6
e4e51c8d-a98e-50a4-ba16-0795f1f3f63a
status_age_days_at_review127 → 128
projectsMega D.C. MDCIL-2 Masmiyya Facility Current Build
e542ef62-912c-5edb-982a-8e463179484b
status_age_days_at_review107 → 108
projectsGoogle Elmina Current Campus Construction
e56ff51f-930c-5c5b-bc82-7add264e576e
status_age_days_at_review61 → 62
projectsCapitaLand DC Navi Mumbai Tower 2
e62026de-3394-51f7-8823-44ee0da1801c
status_age_days_at_review78 → 79
projectsHighreso Ayagawa Existing Operations
e83a4dfc-141f-5213-ac1f-46298013801f
status_age_days_at_review28 → 29
projectsFirmus St Leonards AI Factory Current Construction
e8a1add0-19fb-5196-ae75-34353e7d580b
status_age_days_at_review105 → 106
projectsDayOne Chonburi Tech Park (CTP) data center campus
e934864d-423f-5afa-a9a8-09bd05079ee1
last_observed_physical_statusunder_construction → operational
projectsDayOne Chonburi Tech Park (CTP) data center campus
e934864d-423f-5afa-a9a8-09bd05079ee1
status_as_of2026-04-26 → 2026-09-20
projectsDayOne Chonburi Tech Park (CTP) data center campus
e934864d-423f-5afa-a9a8-09bd05079ee1
status_age_days_at_review172 → 26
projectsDayOne Chonburi Tech Park (CTP) data center campus
e934864d-423f-5afa-a9a8-09bd05079ee1
status_methodimported_documented_status → authoritative_physical_status_update
projectsDayOne Chonburi Tech Park (CTP) data center campus
e934864d-423f-5afa-a9a8-09bd05079ee1
status_evidence_idca6abec9-ae6a-5497-b726-6454ad5a2b7e → f634bd6c-a60e-5db4-91b0-bb658e2263e5
projectsDayOne Chonburi Tech Park (CTP) data center campus
e934864d-423f-5afa-a9a8-09bd05079ee1
status_source_urlhttps://www.aap.com.au/aapreleases/cision20260425ae43618/ → https://web.archive.org/web/20261011024752id_/https://www.sec.gov/Archives/edgar/data/2118192/000119312526414188/d22375…
projectsPozitrons Phase 1 Current Build
e997ad94-2a62-5c44-90f9-fa27edf77dc2
status_age_days_at_review107 → 108
projectsSTACK Infrastructure Berry Hill campus, Pittsylvania County
e9f8645b-ff54-5ebb-8f6c-6c04dbc8d5e2
status_age_days_at_review80 → 81
projectsMacquarie IC3 Super West Phase 1 Build
ea4a0cc5-bb09-5a81-b385-38ae79baf22a
status_age_days_at_review90 → 91
projectsCapitaLand DC ITPH Hyderabad Current Facility Build
ea847e06-abc6-5935-ad21-a3c0adbec711
status_age_days_at_review78 → 79
projectsMeta Beaver Dam data center
eaaa4486-a9d9-5cf1-b196-d03c258f8dc1
status_age_days_at_review6 → 7
projectsCyrusOne Yorkville Current Site Work
eaea9fff-9fd3-506f-a490-320f64d86dc3
status_age_days_at_review88 → 89
projectsMicrosoft Conover Lyle Creek Current Build
eb451867-d1d3-5e41-bce7-d375e861167a
status_as_of2026-05-31 → 2026-09-23
projectsMicrosoft Conover Lyle Creek Current Build
eb451867-d1d3-5e41-bce7-d375e861167a
status_age_days_at_review137 → 23
projectsMicrosoft Conover Lyle Creek Current Build
eb451867-d1d3-5e41-bce7-d375e861167a
status_evidence_id477ad52f-a618-5140-bd2f-645a05bc2dd4 → 626368e8-1a4a-56f3-b815-1b0bec276828
projectsTeraWulf Chesapeake Data Campus (Morgantown)
eb75ea0d-8dba-56a1-a956-135227b3d6e6
status_age_days_at_review71 → 72
projectsOmnia Data Center Pecém
ebd0b7e7-0ca5-501e-89ff-74f8bf30f59b
status_age_days_at_review150 → 151
projectsAirTrunk JHB2
ec871425-75fd-5ee1-9a6f-0e901b2f5837
status_age_days_at_review78 → 79
projectsMicrosoft Villamayor de Gállego datacenter campus (Aragón)
ec8c635b-93db-5c3c-904e-820b7c4f1233
status_age_days_at_review41 → 42
projectsMeta New Albany data center campus (Prometheus)
edaa7f7d-5025-5f95-9870-3ad12478339c
status_age_days_at_review29 → 30
projectsMicrosoft Heath Initial Site Preparation
edf978b4-fbe8-5f8a-9fe0-bd1e9f33e1d2
status_age_days_at_review106 → 107
projectsIozera Tetouan AI data center and hub
ee6721e5-5463-5350-9b3d-fe2429103a70
status_age_days_at_review98 → 99
projectsBridge Data Centres MY06, Sedenak Tech Park
eebaf579-8fee-543e-9f06-f7423d642684
status_age_days_at_review30 → 31
projectsDigital Realty Digital Dulles Current 96 MW Development
f054a923-1869-5cee-aec7-f9673b431f14
status_age_days_at_review108 → 109
projectsData4 Cambrai E-Valley campus
f0697b74-aa81-5aca-ab5b-95a2591d7b2c
status_age_days_at_review126 → 127
projectsACS DC La Puebla data center campus
f07274ee-deff-5651-b606-da909d7328af
status_age_days_at_review10 → 11
projectsData4 Escaudain campus
f0afff75-0b96-5e18-a8f9-08ac9a4b99ff
status_age_days_at_review122 → 123
projectsVantage ZRH12
f0e92e2e-e082-5b7f-9486-fd744b5b68e6
status_age_days_at_review77 → 78
projectsQTS Eagle Mountain SLC1 Building 2
f166440f-2ab0-57ea-9788-c66d89c8704f
status_age_days_at_review106 → 107
projectsMicrosoft La Porte First Phase Current Build
f2b93d1a-7c33-5a9e-be4d-f7d0dadec047
status_age_days_at_review119 → 120
projectsGoogle Bermuda Hundred Current Development
f3cc5dc7-9547-517f-94aa-89e0769f2bf8
status_age_days_at_review106 → 107
projectsTerranova Campinas data centre campus
f533639a-f574-566d-a780-db81daa4b78c
status_age_days_at_review50 → 51
projectsShandong University Longshan — Phase 1 Data Centre and Research Platform
f56086e4-f8b1-546a-8bc2-1dfda7befda9
status_age_days_at_review38 → 39
projectsCipher Digital Black Pearl Phase II Current Build
f595ca9f-e584-5dcb-bf76-38b346f6e4aa
status_age_days_at_review72 → 73
projectsRacks Central RCJM1 Phase A
f6d1bce2-6fc7-5fd8-a1fb-55d5fe4cd8e9
status_age_days_at_review107 → 108
projectsMicrosoft New Albany Initial Site Preparation
f8377a0f-dc89-5b7a-8257-25f25cdbac43
status_age_days_at_review106 → 107
projectsGoodman AMS01 Phase 1 Current Development
f8900f55-087d-5d51-aef2-820402bcbdc2
status_age_days_at_review107 → 108
projectsAirTrunk HYD1 Hyderabad
f8a7bd1c-26a2-5b59-8e1b-d657084c4f7c
status_age_days_at_review6 → 7
projectsNishitetsu Fukuoka Data Center Existing Operations
f8a92123-0878-5133-8c25-697743ed6b37
status_age_days_at_review73 → 74
projectsDigital Realty VIE13 Phase 1 Current Data Center Build
f9e7c64e-3dc3-5d47-a4de-4c72a4284231
status_age_days_at_review119 → 120
projectsCipher Digital Stingray Data Center Current Build
fa44cb24-5185-5616-a6a2-3977f190001f
status_age_days_at_review72 → 73
projectsBitdeer Massillon 2026 Fire-Damaged Buildings Reconstruction
fb943def-5b5b-5192-8bb9-599e4cf616cc
status_age_days_at_review86 → 87
projectsBeacon AI Centers Indus campus
fbbfee97-55a0-5a4e-b000-282ff02a8a39
status_age_days_at_review6 → 7
projectsLG Uplus Paju AIDC Building 1
fc6dd688-fca0-5a7f-a6e9-54f9116607c5
status_age_days_at_review132 → 133
projectsXTX Markets Kajaani Second Data Center
fe6f26cf-4be9-51a3-857e-fca7ee21726b
status_age_days_at_review112 → 113
projectsPowerHouse Grand Prairie campus (PowerHouse and Provident)
fe8ac418-224e-5ac7-b342-11689bcc613e
status_age_days_at_review196 → 197
projectsDayOne Kiveriö Unnamed Data Center Construction Project
fe92035e-3a00-5a85-b009-34fe9c2c545e
status_as_of2026-08-11 → 2026-09-20
projectsDayOne Kiveriö Unnamed Data Center Construction Project
fe92035e-3a00-5a85-b009-34fe9c2c545e
status_age_days_at_review65 → 26
projectsDayOne Kiveriö Unnamed Data Center Construction Project
fe92035e-3a00-5a85-b009-34fe9c2c545e
status_evidence_idef9a468b-9c54-53f4-bb18-126423de0d4e → f634bd6c-a60e-5db4-91b0-bb658e2263e5
projectsDayOne Kiveriö Unnamed Data Center Construction Project
fe92035e-3a00-5a85-b009-34fe9c2c545e
status_source_urlhttps://www.srv.fi/srv-yrityksena/tyomaat/2984-lahden-datakeskus/tiedotteet/ → https://web.archive.org/web/20261011024752id_/https://www.sec.gov/Archives/edgar/data/2118192/000119312526414188/d22375…
projectsEdgeConneX Greater Osaka campus (Kagoya Tatara Campus, Kyotanabe)
ffbda424-5468-5619-97e8-3a32b0522e79
status_age_days_at_review211 → 212
evidenceCapitaLand Data Centre, Mumbai 01 - official property-page map point
77dc8de7-b028-5897-b0d6-072bc8a1c922
project_ids_jsonJSON value changed (see the CSV files of both snapshots)

Cite this snapshot #

Kyars, K. (2026). Data Center Atlas (2026-10-16) [Data set]. https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-16-research-thirtyfirst/